Description
IGF::OT::IGF "OTHER FUNCTIONS" - REPAIR OF STORM DRAIN BASIN
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2012-03-26+$5,205= $5,205
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2012-03-26 | +$5,205 | $5,205 | IGF::OT::IGF "OTHER FUNCTIONS" - REPAIR OF STORM DRAIN BASIN |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI NT1SLUJ8LND3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24414P1745 | 542-COATESVILLE · Z1NE · MAINTENANCE OF WATER SUPPLY FACILITIES | $3,500 | FY2014 |
| VA24413P1093 | 642-PHILADELPHIA · C1AA · ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | $4,802 | FY2012 |
| VA542C10381 | 542-COATESVILLE · Z299 · MAINT, REP/ALTER/ALL OTHER | $5,200 | FY2011 |
| VA542C10382 | 542-COATESVILLE · N054 · INSTALL OF PREFAB STRUCTURES | $11,190 | FY2011 |
| VA542C10364 | 542-COATESVILLE · N056 · INSTALL OF CONTRUCT MATERIAL | $4,191 | FY2011 |
| VA542C11303 | 542-COATESVILLE · Y142 · CONSTRUCT/LABORATORIES & CLINICS | $6,050 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24412P1138_3600_-NONE-_-NONE- · retrieved 2026-09-26.