TAS::36 0158::TAS 1. REMOVAL OF ALL EXISTING CAMPUS PARKING LOT POLE LIGHT FIXTURES. 2. PROVIDE ALL NEW LED PARKING LOT POLE LIGHT FIXTURES THROUGHOUT CAMPUS PARKING LOT. 3. REMOVAL OF ALL EXISTING BUILDING EXTERIOR WALL MOUNTED LIGHT FIXTURES THROUGHOUT CAMPUS. 4. PROVIDE NEW (BUILDING EXTERIOR) WALL MOUNTED LIGHT FIXTURES THROUGHOUT CAMPUS. 5. REMOVAL OF EXISTING CIRCUIT WIRING AND CONDUITS FOR MAIN PARKING LOT AREAS (IN FRONT AND ADJACENT TO BUILDINGS #1, #2, AND #15). 6. PROVIDE NEW CIRCUIT WIRING AND CONDUITS FOR MAIN PARKING LOT AREAS (IN FRONT AND ADJACENT TO BUILDINGS #1, #2, AND #15). 7. PROVIDE NEW CANOPY LIGHTING AND LIGHTING CIRCUIT AT BUILDING #1 MAIN FRONT ENTRANCE. 8. PROVIDE NEW POLES AND LIGHT FIXTURES IN REAR OF BUILDING #2. 9. REMOVAL OF EXISTING TIME CLOCKS SERVING CAMPUS PARKING LOT LIGHTING AND PROVIDING NEW PHOTOCELLS WHERE INDICATED. 10. PROVIDE NEW FLAGPOLE LIGHT FIXTURES. 11. PROVIDE NEW LIGHT FIXTURES FOR MAIN HOSPITAL SIGNAGE (ON MAIN BUILDING #1). 12. PROVIDE NEW GFI BREAKERS FOR BOTH NEW AND EXISTING LIGHTING CIRCUITS IN PANEL G-604 IN THE OPC BUILDING AS SHOWN AND NOTED ON THE DRAWINGS. ALSO PROVIDE NEW PHOTOCELLS FOR CONTROL OF ALL NEW AND EXISTING LIGHTING FIXTURES AS SHOWN AND NOTED ON THE DRAWINGS. 13. OPC POLES AND FIXTURES AND FEEDER AND UNDERGROUND CONDUIT MUST BE ACCOMPLISHED FIRST WITHIN 90 CALENDAR DAYS. CONTRACTOR IS NOT ALLOWED TO PROCEED ONTO OTHER PART OF THE PROJECT UNTIL THE OPC FIXTURES, CONDUIT AND FEEDER ARE COMPLETED AND OPERATIONAL. TOTAL COMPLETION TIME FOR BASE BID: 180 CALENDAR DAYS.
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-12-23+$470,558= $470,558
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-12-23 | +$470,558 | $470,558 | TAS::36 0158::TAS 1. REMOVAL OF ALL EXISTING CAMPUS PARKING LOT POLE LIGHT FIXTURES. 2. PROVIDE ALL NEW… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI MM8LPN2UCFX8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA78615A0002 | 03 OFFICE OF ADMINISTRATION (03) · Z1AA · MAINTENANCE OF OFFICE BUILDINGS | $0 | FY2015 |
| VA24513C0064 | 512-BALTIMORE · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $288,000 | FY2013 |
| VA24413C0146 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $2,416,619 | FY2013 |
| V101Z20305P03 | 03 OFFICE OF ADMINISTRATION (03) · Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS | $1,758 | FY2012 |
| V101Z20305P02 | 03 OFFICE OF ADMINISTRATION (03) · Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS | $1,974 | FY2012 |
| VA101Z20305P01 | 03 OFFICE OF ADMINISTRATION (03) · Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS | $1,549 | FY2012 |
Other recipients under Y141 from 243-NETWORK CONTRACTING OFFICE 03 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA630C11389 | CONCENTRIC GROUP, LLC | 243-NETWORK CONTRACTING OFFICE 03 | $97,002 | FY2011 |
| VA243C1203 | THE CHEROKEE 8A GROUP, INC. | 243-NETWORK CONTRACTING OFFICE 03 | $347,000 | FY2011 |
| VA243C1204 | ANDROS CONTRACTING INC. | 243-NETWORK CONTRACTING OFFICE 03 | $5,615,859 | FY2011 |
| VA243C1236 | JR SERVICES LLC | 243-NETWORK CONTRACTING OFFICE 03 | $214,000 | FY2011 |
| VA243C1124 | GCC ENTERPRISES INC. | 243-NETWORK CONTRACTING OFFICE 03 | $4,066,859 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA243RA0770_3600_-NONE-_-NONE- · retrieved 2026-09-26.