Description
FY 14 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS
Base award description: FY 12 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-10-01+$23,940= $23,940
- Mod P000012012-10-01+$24,480= $48,420
- Mod P000022013-10-01+$24,960= $73,380
- Mod P000032014-10-01+$25,680= $99,060
- Mod P000042015-10-01+$26,160= $125,220
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-10-01 | +$23,940 | $23,940 | FY 12 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS |
| Mod P00001· EXERCISE AN OPTION | 2012-10-01 | +$24,480 | $48,420 | FY 12 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS |
| Mod P00002· EXERCISE AN OPTION | 2013-10-01 | +$24,960 | $73,380 | FY 14 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS |
| Mod P00003· EXERCISE AN OPTION | 2014-10-01 | +$25,680 | $99,060 | FY 14 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS |
| Mod P00004· EXERCISE AN OPTION | 2015-10-01 | +$26,160 | $125,220 | FY 14 BOILER PLANT SAFETY DEVICE TESTING, PREVENTIVE MAINTENANCE&REPAIRS |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI D3E2MBU7MAZ5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24624P0120 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · H945 · OTHER QC/TEST/INSPECT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $21,780 | FY2024 |
| 36C24122C0054 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · H945 · OTHER QC/TEST/INSPECT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $70,200 | FY2022 |
| 36C24721C0088 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · H336 · INSPECTION- SPECIAL INDUSTRY MACHINERY | $19,000 | FY2021 |
| 36C24420P0823 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $0 | FY2020 |
| 36C24120P0663 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $193,120 | FY2020 |
| 36C25520P0455 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $0 | FY2020 |
Other recipients under H299 from 241-NETWORK CONTRACT OFFICE 01 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24114F0526 | HRP ASSOCIATES INC | 241-NETWORK CONTRACT OFFICE 01 | $1,135 | FY2014 |
| VA24113F0249 | BUREAU VERITAS NORTH AMERICA, INC. | 241-NETWORK CONTRACT OFFICE 01 | $9,990 | FY2013 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA241P2358_3600_-NONE-_-NONE- · retrieved 2026-09-26.