Award recordCONTRACT

ASSOCIATED BOILER LINE EQUIPMENT CO., INC.

PIID VA241P1675· VHA· 689-WEST HAVEN· J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT· FY2010· $330,481 net obligations· UEI J7R2DTL3CU93· CT

Description

PM SERVICES FOR BOILERS

First action · last action
2010-01-19 · 2014-11-19
Transactions
6
First transaction's obligation
$50,841
Base + all options value (sum of deltas)
$330,481
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
1
SDVOSB flag on record
No
NAICS
811310 · COMMERCIAL AND INDUSTRIAL MACHINERY AND EQUIPMENT (EXCEPT AUTOMOTIVE AND ELECTRONIC) REPAIR AND MAINTENANCE

Modification chain · 6 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$330,481$0Base award · 2010-01-19 · this action $50,841 · running total $50,841Modification 2 · 2010-12-01 · this action $62,839 · running total $113,680Modification 3 · 2011-11-10 · this action $64,724 · running total $178,404Modification 4 · 2012-10-31 · this action $66,667 · running total $245,071Modification P00004 · 2013-11-29 · this action $68,328 · running total $313,399Modification P00005 · 2014-11-19 · this action $17,082 · running total $330,481
  • Base2010-01-19+$50,841= $50,841
  • Mod 22010-12-01+$62,839= $113,680
  • Mod 32011-11-10+$64,724= $178,404
  • Mod 42012-10-31+$66,667= $245,071
  • Mod P000042013-11-29+$68,328= $313,399
  • Mod P000052014-11-19+$17,082= $330,481
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-01-19+$50,841$50,841PM SERVICES FOR BOILERS
Mod 2· EXERCISE AN OPTION2010-12-01+$62,839$113,680PM SERVICES FOR BOILERS
Mod 3· EXERCISE AN OPTION2011-11-10+$64,724$178,404PM SERVICES FOR BOILERS
Mod 4· EXERCISE AN OPTION2012-10-31+$66,667$245,071PM SERVICES FOR BOILER BURNERS&CONTROLS
Mod P00004· EXERCISE AN OPTION2013-11-29+$68,328$313,399PM SERVICES FOR BOILERS
Mod P00005· EXERCISE AN OPTION2014-11-19+$17,082$330,481PM SERVICES FOR BOILERS

Related awards · 10

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI J7R2DTL3CU93)

AwardOffice · PSC / listingNet obligationsFY
36C24225N0789242-NETWORK CONTRACT OFFICE 02 (36C242) · H344 · INSPECTION- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS$196,770FY2025
36C24224P1535242-NETWORK CONTRACT OFFICE 02 (36C242) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS$53,282FY2024
36C24124P1034241-NETWORK CONTRACT OFFICE 01 (36C241) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT$99,101FY2024
36C24224P1307242-NETWORK CONTRACT OFFICE 02 (36C242) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS$236,281FY2024
36C24224P1413242-NETWORK CONTRACT OFFICE 02 (36C242) · H399 · INSPECTION- MISCELLANEOUS$6,728FY2024
36C24524P0256245-NETWORK CONTRACT OFFICE 5 (36C245) · 4520 · SPACE AND WATER HEATING EQUIPMENT$14,018FY2024

Other recipients under J045 from 689-WEST HAVEN (most recent first)

AwardRecipientOfficeNet obligationsFY
V689C99220JOHNSON CONTROLS, INC689-WEST HAVEN$274,431FY2009
VA241P0875PIPEOLOGY L.L.C.689-WEST HAVEN$46,500FY2009
V689C89193JOHNSON CONTROLS, INC689-WEST HAVEN$367,313FY2008
V00241P00826BOILER INSPECTION & ENGINEERING INC689-WEST HAVEN$11,940FY2008

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA241P1675_3600_-NONE-_-NONE- · retrieved 2026-09-26.