Description
REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS.
Base award description: RENOVATIONS TO THE POLY TRAUMA UNIT
Modification chain · 11 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-06-19+$1,567,908= $1,567,908
- Mod 12010-03-17+$3,601= $1,571,509
- Mod 22010-04-06+$33,904= $1,605,413
- Mod 32010-04-27-$5,306= $1,600,107
- Mod 42010-08-12-$110,557= $1,489,550
- Mod 62010-08-12-$55,278= $1,434,272
- Mod 52010-11-19-$371,897= $1,062,375
- Mod 72010-11-19-$441,480= $620,895
- Mod 82010-11-23+$813,377= $1,434,272
- Mod 92010-11-23+$441,480= $1,875,752
- Mod 102011-08-23+$0= $1,875,752
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-06-19 | +$1,567,908 | $1,567,908 | RENOVATIONS TO THE POLY TRAUMA UNIT |
| Mod 1· CHANGE ORDER | 2010-03-17 | +$3,601 | $1,571,509 | REMOVE WALL COVERING IN ROOMS C216-218 |
| Mod 2· CHANGE ORDER | 2010-04-06 | +$33,904 | $1,605,413 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 3· CHANGE ORDER | 2010-04-27 | −$5,306 | $1,600,107 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 4· CHANGE ORDER | 2010-08-12 | −$110,557 | $1,489,550 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 6· CHANGE ORDER | 2010-08-12 | −$55,278 | $1,434,272 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 5· CHANGE ORDER | 2010-11-19 | −$371,897 | $1,062,375 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 7· CHANGE ORDER | 2010-11-19 | −$441,480 | $620,895 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 8· CHANGE ORDER | 2010-11-23 | +$813,377 | $1,434,272 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 9· CHANGE ORDER | 2010-11-23 | +$441,480 | $1,875,752 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
| Mod 10· CHANGE ORDER | 2011-08-23 | +$0 | $1,875,752 | REPLACE EXISTING MANUAL CONTROL VALVES AT EXISTING PERIMETER HEAT CONVECTORS. |
Related awards · 10
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI V8DKLMJPSB73)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA241C1419 | 523-BOSTON · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $2,619,606 | FY2009 |
| VA523Z95004 | 241-NETWORK CONTRACT OFFICE 01 · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $0 | FY2009 |
| VA523C97051 | 523-BOSTON · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $396,097 | FY2009 |
| VA523C97033 | 523-BOSTON · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $1,000 | FY2009 |
| VA241C1319 | 523-BOSTON · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $0 | FY2009 |
Other recipients under Y111 from 523-BOSTON (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| V523C17013 | ALARES LLC | 523-BOSTON | $147,529 | FY2011 |
| VA518C10013 | ATLANTIC DEFENSE CONSTRUCTORS, LLC | 523-BOSTON | $51,614 | FY2011 |
| VA523C17009 | LEGION CONSTRUCTION, INC. | 523-BOSTON | $85,700 | FY2011 |
| V523C07097 | IRONCLAD SERVICES INC | 523-BOSTON | $203,158 | FY2010 |
| VA523C07077 | THERMO DYNAMICS INC | 523-BOSTON | $236,493 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA241C1227_3600_-NONE-_-NONE- · retrieved 2026-09-26.