Description
IGF::OT::IGF REPLACEMENT OF BOILERS BLDG 6-8 NEWINGTON CT. MODIFICATION P00001 IS AN EXTENSION OF THE COMPLETION DATE.P0001 WAS TO EXTEND COMPLETION DATE TO FEBRUARY 28, 2014 AND POOOO2 IS TO EXTEND COMPLETION DATE TO APRIL 04, 2014 DUE TO NEEDING MORE TIME TO REVIEW ON BOTH SIDES THE 100% CONSTRUCTION DOCUMENTS.
Base award description: IGF::OT::IGF REPLACEMENT OF BOILERS BLDG 6-8 NEWINGTON CT.
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-09-27+$60,889= $60,889
- Mod P000012014-02-12+$0= $60,889
- Mod P000022014-03-10+$0= $60,889
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-09-27 | +$60,889 | $60,889 | IGF::OT::IGF REPLACEMENT OF BOILERS BLDG 6-8 NEWINGTON CT. |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2014-02-12 | +$0 | $60,889 | IGF::OT::IGF REPLACEMENT OF BOILERS BLDG 6-8 NEWINGTON CT. MODIFICATION P00001 IS AN EXTENSION OF THE COMPLET… |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2014-03-10 | +$0 | $60,889 | IGF::OT::IGF REPLACEMENT OF BOILERS BLDG 6-8 NEWINGTON CT. MODIFICATION P00001 IS AN EXTENSION OF THE COMPLET… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI MGAMDQ198AV8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24121C0061 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1GC · ARCHITECT AND ENGINEERING- CONSTRUCTION: FUEL STORAGE BUILDINGS | $591,659 | FY2021 |
| 36C24121C0027 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $46,700 | FY2021 |
| 36C24121P0182 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $7,117 | FY2021 |
| 36C24119N0268 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1DB · ARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS | $153,277 | FY2019 |
| 36C24118N9900 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $82,922 | FY2018 |
| 36C24118N0547 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $36,930 | FY2018 |
Other recipients under C1DA from 241-NETWORK CONTRACT OFFICE 01 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24116C0006 | E4H - ENVIRONMENTS FOR HEALTH, LLC | 241-NETWORK CONTRACT OFFICE 01 | $0 | FY2016 |
| VA24115J2135 | MOSER, PILON, NELSON ARCHITECTS LLC | 241-NETWORK CONTRACT OFFICE 01 | $82,034 | FY2015 |
| VA24115C0107 | HDR ARCHITECTURE INC | 241-NETWORK CONTRACT OFFICE 01 | $233,913 | FY2015 |
| VA24115C0075 | SMRT INC | 241-NETWORK CONTRACT OFFICE 01 | $43,510 | FY2015 |
| VA24115C0007 | DEWBERRY ENGINEERS INC. | 241-NETWORK CONTRACT OFFICE 01 | $84,776 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24113P1445_3600_-NONE-_-NONE- · retrieved 2026-09-26.