Description
IGF::OT::IGF CHANGE ORDER TO PROVIDE MATERIALS AND LABOR TO INSTALL NEW PRV STATION. DEMO OUT THE EXISTING STEAM PRV STATION AND CONTINUE PIPING THROUGH. INSTALL NEW PRV AT THE SAME HEIGHT AS THE EXISTING PIPING ROUTED EAST AND WEST NEXT TO THE AIR HANDLING UNIT. RELOCATE FLASH TANK OVER BY THE NEW HEAT EXCHANGER AND ROUTE THE HIGH PRESSURE CONDENSATE LINE FROM STEAM TRAP BEFORE STATION TO IT. INSTALL 1 BYPASS LINE.
Base award description: IGF::OT::IGF REGIONAL OFFICE MINOR CONSTRUCTION PROJECT FOR DESIGN-BUILD HVAC REPLACEMENT SIOUX FALLS.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-04-15+$1,875,387= $1,875,387
- Mod P000012014-11-04+$0= $1,875,387
- Mod P000022014-11-06+$18,268= $1,893,655
- Mod P000032015-03-12+$24,947= $1,918,602
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-04-15 | +$1,875,387 | $1,875,387 | IGF::OT::IGF REGIONAL OFFICE MINOR CONSTRUCTION PROJECT FOR DESIGN-BUILD HVAC REPLACEMENT SIOUX FALLS. |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2014-11-04 | +$0 | $1,875,387 | IGF::OT::IGF NO COST TIME EXTENSION. |
| Mod P00002· CHANGE ORDER | 2014-11-06 | +$18,268 | $1,893,655 | IGF::OT::IGF CHANGE ORDER TO ADD (3) CUH S TWO TO FRONT VESTIBULE AND ONE IN THE SOUTH VESTIBULE, REPLACE 3 TR… |
| Mod P00003· CHANGE ORDER | 2015-03-12 | +$24,947 | $1,918,602 | IGF::OT::IGF CHANGE ORDER TO PROVIDE MATERIALS AND LABOR TO INSTALL NEW PRV STATION. DEMO OUT THE EXISTING STE… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JV6AKUMZU1S3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26320C0200 | NETWORK CONTRACT OFFICE 23 (36C263) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $57,299 | FY2020 |
| 36C26318C0056 | NETWORK CONTRACT OFFICE 23 (36C263) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $8,500 | FY2018 |
| VA26317P0605 | 437-FARGO VA MEDICAL CENTER (00437) · 4120 · AIR CONDITIONING EQUIPMENT | $14,436 | FY2017 |
| VA26316P0819 | 656-ST CLOUD VA MEDICAL CTR (00656) · 4120 · AIR CONDITIONING EQUIPMENT | $18,421 | FY2016 |
| VA26316C0089 | 568-VA BLK HILLS HLTH CARE (00568P) · N041 · INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $48,065 | FY2016 |
| VA26316P0493 | 437-FARGO VA MEDICAL CENTER (00437) · 4120 · AIR CONDITIONING EQUIPMENT | $12,436 | FY2016 |
Other recipients under Z2AA from VBA FIELD CONTRACTING (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101V16P2570 | ESA SOUTH, INC. | VBA FIELD CONTRACTING | $81,569 | FY2016 |
| VA101V16P0013 | BILLY W. JARRETT CONSTRUCTION COMPANY, INC. | VBA FIELD CONTRACTING | $93,892 | FY2016 |
| VA101V15P1188 | PARAMOUNT CONSTRUCTION GROUP, LLC | VBA FIELD CONTRACTING | $8,796 | FY2015 |
| VA101V15J1107 | AMELANG PARTNERS INC | VBA FIELD CONTRACTING | $10,192 | FY2015 |
| VA101V15J1110 | AMELANG PARTNERS INC | VBA FIELD CONTRACTING | $5,000 | FY2015 |