Award recordCONTRACT

C & C CONTRACTORS LLC

PIID VA101F17C2869· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS· FY2017· $26,036,789 net obligations· UEI Z6ZVR3MXC9L4· AL

Description

THE WORK INCLUDES THE FOLLOWING ITEMS REVISED AND IN ADDITION TO THE ORIGINAL CONTRACT. CALCULATE ANY CHANGE IN THE CONTRACTOR?S CONTRACTUAL PERFORMANCE BOND BASED ON THE COST OF ADDITIONAL WORK.

Base award description: IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD

First action · last action
2017-03-02 · 2021-07-27
Transactions
43
First transaction's obligation
$24,384,574
Base + all options value (sum of deltas)
$26,036,789
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
4
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 43 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$27,771,731$0Base award · 2017-03-02 · this action $24,384,574 · running total $24,384,574Modification P00001 · 2017-12-20 · this action $180,632 · running total $24,565,206Modification P00002 · 2018-03-19 · this action $268,724 · running total $24,833,930Modification P00003 · 2018-09-05 · this action -$5,922 · running total $24,828,008Modification P00004 · 2018-10-17 · this action $28,300 · running total $24,856,308Modification P00005 · 2018-11-13 · this action -$28,397 · running total $24,827,911Modification P00006 · 2018-11-16 · this action $2,125,674 · running total $26,953,585Modification P00008 · 2018-12-19 · this action $23,459 · running total $26,977,044Modification P00009 · 2018-12-19 · this action $30,000 · running total $27,007,044Modification P00007 · 2019-01-09 · this action $117,316 · running total $27,124,360Modification P00010 · 2019-01-24 · this action $4,683 · running total $27,129,043Modification P00011 · 2019-01-28 · this action $5,500 · running total $27,134,543Modification P00012 · 2019-02-05 · this action $0 · running total $27,134,543Modification P00013 · 2019-03-06 · this action $3,210 · running total $27,137,753Modification P00014 · 2019-03-07 · this action $6,149 · running total $27,143,902Modification P00015 · 2019-03-07 · this action $1,500 · running total $27,145,402Modification P00016 · 2019-03-20 · this action -$7,133 · running total $27,138,269Modification P00017 · 2019-03-20 · this action -$1,371 · running total $27,136,898Modification P00018 · 2019-04-22 · this action $630,328 · running total $27,767,226Modification P00019 · 2019-05-01 · this action $4,505 · running total $27,771,731Modification P00022 · 2019-06-05 · this action -$1,897,138 · running total $25,874,593Modification P00021 · 2019-06-06 · this action -$122,452 · running total $25,752,141Modification P00020 · 2019-06-10 · this action $7,098 · running total $25,759,239Modification P00023 · 2019-06-18 · this action $25,000 · running total $25,784,239Modification P00024 · 2019-06-18 · this action $7,000 · running total $25,791,239Modification P00025 · 2019-07-30 · this action $28,539 · running total $25,819,778Modification P00026 · 2019-08-15 · this action $6,994 · running total $25,826,771Modification P00027 · 2019-08-15 · this action -$949 · running total $25,825,823Modification P00028 · 2019-11-07 · this action $51,229 · running total $25,877,052Modification P00029 · 2020-01-07 · this action $80,130 · running total $25,957,181Modification P00030 · 2020-02-11 · this action -$51,229 · running total $25,905,952Modification P00031 · 2020-04-09 · this action $19,018 · running total $25,924,970Modification P00032 · 2020-05-13 · this action $50,000 · running total $25,974,970Modification P00033 · 2020-06-10 · this action $25,534 · running total $26,000,504Modification P00034 · 2020-07-08 · this action $28,195 · running total $26,028,699Modification P00035 · 2020-07-28 · this action $6,636 · running total $26,035,335Modification A00036 · 2020-08-13 · this action -$1,191 · running total $26,034,144Modification A00037 · 2020-08-13 · this action -$3,063 · running total $26,031,081Modification A00038 · 2020-10-05 · this action $31,009 · running total $26,062,090Modification P00036 · 2020-12-08 · this action $0 · running total $26,062,090Modification A00039 · 2021-01-19 · this action -$37,367 · running total $26,024,722Modification P00037 · 2021-03-17 · this action $0 · running total $26,024,722Modification A00040 · 2021-07-27 · this action $12,067 · running total $26,036,789
  • Base2017-03-02+$24,384,574= $24,384,574
  • Mod P000012017-12-20+$180,632= $24,565,206
  • Mod P000022018-03-19+$268,724= $24,833,930
  • Mod P000032018-09-05-$5,922= $24,828,008
  • Mod P000042018-10-17+$28,300= $24,856,308
  • Mod P000052018-11-13-$28,397= $24,827,911
  • Mod P000062018-11-16+$2,125,674= $26,953,585
  • Mod P000082018-12-19+$23,459= $26,977,044
  • Mod P000092018-12-19+$30,000= $27,007,044
  • Mod P000072019-01-09+$117,316= $27,124,360
  • Mod P000102019-01-24+$4,683= $27,129,043
  • Mod P000112019-01-28+$5,500= $27,134,543
  • Mod P000122019-02-05+$0= $27,134,543
  • Mod P000132019-03-06+$3,210= $27,137,753
  • Mod P000142019-03-07+$6,149= $27,143,902
  • Mod P000152019-03-07+$1,500= $27,145,402
  • Mod P000162019-03-20-$7,133= $27,138,269
  • Mod P000172019-03-20-$1,371= $27,136,898
  • Mod P000182019-04-22+$630,328= $27,767,226
  • Mod P000192019-05-01+$4,505= $27,771,731
  • Mod P000222019-06-05-$1,897,138= $25,874,593
  • Mod P000212019-06-06-$122,452= $25,752,141
  • Mod P000202019-06-10+$7,098= $25,759,239
  • Mod P000232019-06-18+$25,000= $25,784,239
  • Mod P000242019-06-18+$7,000= $25,791,239
  • Mod P000252019-07-30+$28,539= $25,819,778
  • Mod P000262019-08-15+$6,994= $25,826,771
  • Mod P000272019-08-15-$949= $25,825,823
  • Mod P000282019-11-07+$51,229= $25,877,052
  • Mod P000292020-01-07+$80,130= $25,957,181
  • Mod P000302020-02-11-$51,229= $25,905,952
  • Mod P000312020-04-09+$19,018= $25,924,970
  • Mod P000322020-05-13+$50,000= $25,974,970
  • Mod P000332020-06-10+$25,534= $26,000,504
  • Mod P000342020-07-08+$28,195= $26,028,699
  • Mod P000352020-07-28+$6,636= $26,035,335
  • Mod A000362020-08-13-$1,191= $26,034,144
  • Mod A000372020-08-13-$3,063= $26,031,081
  • Mod A000382020-10-05+$31,009= $26,062,090
  • Mod P000362020-12-08+$0= $26,062,090
  • Mod A000392021-01-19-$37,367= $26,024,722
  • Mod P000372021-03-17+$0= $26,024,722
  • Mod A000402021-07-27+$12,067= $26,036,789
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2017-03-02+$24,384,574$24,384,574IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-12-20+$180,632$24,565,206IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-03-19+$268,724$24,833,930IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-05−$5,922$24,828,008IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00004· CHANGE ORDER2018-10-17+$28,300$24,856,308IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-11-13−$28,397$24,827,911IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-11-16+$2,125,674$26,953,585IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-12-19+$23,459$26,977,044IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00009· CHANGE ORDER2018-12-19+$30,000$27,007,044IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00007· CHANGE ORDER2019-01-09+$117,316$27,124,360BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD: FIELD 53 AND 54 IRRIGATION AND DRAINAGE CORRECTION
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-24+$4,683$27,129,043IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00011· CHANGE ORDER2019-01-28+$5,500$27,134,543IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD SATELLITE PUBLIC RESTROOM FACILITY ON THE HI…
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-02-05+$0$27,134,543BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-06+$3,210$27,137,753IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-07+$6,149$27,143,902IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00015· CHANGE ORDER2019-03-07+$1,500$27,145,402IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-20−$7,133$27,138,269IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-20−$1,371$27,136,898IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD STOP WORK NOTICE
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-04-22+$630,328$27,767,226IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-01+$4,505$27,771,731IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-05−$1,897,138$25,874,593IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD CREDIT FOR ALTERNATE WATER SOURCE
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-06−$122,452$25,752,141IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-10+$7,098$25,759,239IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00023· CHANGE ORDER2019-06-18+$25,000$25,784,239IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00024· CHANGE ORDER2019-06-18+$7,000$25,791,239IGF::OT::IGF BARRANCAS NATIONAL CEMETERY - TWO-PHASE DESIGN-BUILD ADDITIONAL IN-GROUND CREMAINS
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-07-30+$28,539$25,819,778BARRANCAS NATIONAL CEMETERY; TWO PHASE CONSTRUCTION; NEW WEATHER STATION INSTALLATION
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-08-15+$6,994$25,826,771BARRANCAS NATIONAL CEMETERY; TWO PHASE CONSTRUCTION; DEFINITIZE TRANSFORMER UPGRADE
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-08-15−$949$25,825,823BARRANCAS NATIONAL CEMETERY; TWO PHASE CONSTRUCTION; DEFINITIZE SECTION NUMBERING REVISION
Mod P00028· CHANGE ORDER2019-11-07+$51,229$25,877,052BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION PRECAST INLET TOPS REVISION
Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-01-07+$80,130$25,957,181BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION MAINTENANCE BUILDING DEFICIENCIES
Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-11−$51,229$25,905,952BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION DEFINITIZE P00028 PRECAST INLET TOP REVISION
Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-09+$19,018$25,924,970BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION DEFINITIZE P00031 HISTORIC MAINTENANCE BUILDING TREE REMOVA…
Mod P00032· OTHER ADMINISTRATIVE ACTION2020-05-13+$50,000$25,974,970BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION P00032 ASBESTOS ABATEMENT ACCOUNTING RECONFIGURATION
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-06-10+$25,534$26,000,504BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION P00033 ADDITIONAL COMMITTAL SHELTER IRRIGATION
Mod P00034· CHANGE ORDER2020-07-08+$28,195$26,028,699BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION P00033 ADDITIONAL COMMITTAL SHELTER IRRIGATION
Mod P00035· CHANGE ORDER2020-07-28+$6,636$26,035,335BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION P00035 GNSS SUBSCRIPTION SERVICE EXTENSION
Mod A00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-08-13−$1,191$26,034,144BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION A00036 DEFINITIZE P00035 GNSS SUBSCRIPTION SERVICE EXTENSI…
Mod A00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-08-13−$3,063$26,031,081BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION A00037 DEFINITIZE P00034 INSTALLATION OF HVAC SYSTEM AT SA…
Mod A00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-10-05+$31,009$26,062,090BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION A00037 DEFINITIZE P00034 INSTALLATION OF HVAC SYSTEM AT SA…
Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-12-08+$0$26,062,090BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION CHANGE CONTRACTING OFFICER
Mod A00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-01-19−$37,367$26,024,722BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION A00037 DEFINITIZE P00034 INSTALLATION OF HVAC SYSTEM AT SA…
Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-03-17+$0$26,024,722BARRANCAS NATIONAL CEMETERY TWO PHASE CONSTRUCTION P00037 TIME EXTENSION
Mod A00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-07-27+$12,067$26,036,789THE WORK INCLUDES THE FOLLOWING ITEMS REVISED AND IN ADDITION TO THE ORIGINAL CONTRACT. CALCULATE ANY CHANGE I…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI Z6ZVR3MXC9L4)

AwardOffice · PSC / listingNet obligationsFY
36C78626C0020NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$31,145,450FY2026
36C24726C0055247-NETWORK CONTRACT OFFICE 7 (36C247) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$9,079,864FY2026
36C78626N0338NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$122,570FY2026
36C78626N0342NATIONAL CEMETERY ADMIN (36C786) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS$361,151FY2026
36C78625C0042NATIONAL CEMETERY ADMIN (36C786) · Y1JZ · CONSTRUCTION OF MISCELLANEOUS BUILDINGS$24,203,981FY2025
36C78625N0565NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$281,750FY2025

Other recipients under Y1AZ from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0002SANDOW CONSTRUCTION INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$783,108FY2026
36C10F24C0002RICHARD GROUP LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$42,737,190FY2024
36C10F22C0007RANDY KINDER EXCAVATING INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$1,663,765FY2022
36C10F21C0001SPEES-HERNANDEZ JV LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$19,726,379FY2021
36C10F21F0004HAMILTON PACIFIC CHAMBERLAIN LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$406,155FY2021

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101F17C2869_3600_-NONE-_-NONE- · retrieved 2026-09-26.