Description
IGF::OT::IGF, P00080 MOD TO COMPLETE CLOSEOUT, VAMC MANHATTAN. HURRICANE SANDY
Base award description: IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH THE RENOVATION OF THE 9TH FLOOR OF BUILDING 1 AT THE VAMC MANHATTAN, NY. CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, SUPPLIES, SUPERVISION, EQUIPMENT AND TRANSPORTATION FOR CONSTRUCTION SERVICES FOR SELECTIVE DEMOLITION AND THE COMPLETE RENOVATION AND CONSTRUCTION ON THE 9TH FLOOR AS WELL AS SELECTIVE DEMOLITION AND ASBESTOS ABATEMENT ON THE 8TH AND 10TH FLOOR OF BUILDING 1, PRIMARY CARE CLINIC AT THE VA MEDICAL CENTER, MANHATTAN, NY.
Modification chain · 76 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-12-23+$14,560,000= $14,560,000
- Mod P000012014-01-30+$13,000= $14,573,000
- Mod P000022014-03-10+$3,267= $14,576,267
- Mod P000042014-04-21+$13,335= $14,589,602
- Mod P000062014-04-21+$5,000= $14,594,602
- Mod P000052014-04-22+$4,500= $14,599,102
- Mod P000082014-04-28+$90,000= $14,689,102
- Mod P000092014-05-20+$720= $14,689,822
- Mod P000142014-09-03+$79,496= $14,769,318
- Mod P000152014-09-03+$44,038= $14,813,357
- Mod P000072014-09-11+$9,043= $14,822,400
- Mod P000122014-09-11+$3,379= $14,825,779
- Mod P000182014-09-11+$54,684= $14,880,463
- Mod P000272014-10-28+$0= $14,880,463
- Mod P000032014-11-06+$95,000= $14,975,463
- Mod P000172014-11-06+$10,000= $14,985,463
- Mod P000262014-11-10+$4,500= $14,989,963
- Mod P000242014-12-02+$61,875= $15,051,838
- Mod P000282014-12-24+$5,500= $15,057,338
- Mod P000222015-02-04+$5,200= $15,062,538
- Mod P000232015-02-04+$19,400= $15,081,938
- Mod P000322015-02-04+$5,500= $15,087,438
- Mod P000332015-02-04+$7,300= $15,094,738
- Mod P000342015-02-05+$6,400= $15,101,138
- Mod P000252015-02-25+$5,500= $15,106,638
- Mod P000292015-02-25+$40,000= $15,146,638
- Mod P000302015-02-25+$36,725= $15,183,363
- Mod P000312015-02-25+$1,950= $15,185,313
- Mod P000192015-02-27+$8,835= $15,194,148
- Mod P000362015-03-04+$90,000= $15,284,148
- Mod P000382015-03-04+$74,000= $15,358,148
- Mod P000372015-03-12+$95,000= $15,453,148
- Mod P000392015-03-30+$7,307= $15,460,455
- Mod P000202015-03-31+$15,000= $15,475,455
- Mod P000102015-05-14+$23,000= $15,498,455
- Mod P000112015-05-14+$10,000= $15,508,455
- Mod P000402015-05-14+$70,000= $15,578,455
- Mod P000412015-05-14+$1,000= $15,579,455
- Mod P000422015-05-14+$19,000= $15,598,455
- Mod P000352015-07-14+$2,200= $15,600,655
- Mod P000432015-07-14+$13,250= $15,613,905
- Mod P000442015-07-14+$5,600= $15,619,505
- Mod P000492015-09-21+$0= $15,619,505
- Mod P000452015-09-24+$34,724= $15,654,229
- Mod P000462015-09-24+$99,062= $15,753,291
- Mod P000472015-09-24+$31,180= $15,784,471
- Mod P000482015-09-24+$71,785= $15,856,256
- Mod P000512015-09-30+$22,500= $15,878,756
- Mod P000522015-09-30+$144,000= $16,022,756
- Mod P000532015-09-30+$36,000= $16,058,756
- Mod P000502015-10-19+$94,495= $16,153,251
- Mod P000542016-02-12+$34,000= $16,187,251
- Mod P000552016-07-19+$0= $16,187,251
- Mod P000562016-08-01+$0= $16,187,251
- Mod P000572016-09-28+$0= $16,187,251
- Mod P000592016-10-13+$14,039= $16,201,290
- Mod P000602016-10-13+$1,202= $16,202,492
- Mod P000582016-10-20-$1,124= $16,201,368
- Mod P000612016-11-14+$10,000= $16,211,368
- Mod P000632016-11-16+$16,769= $16,228,137
- Mod P000622016-11-22+$0= $16,228,137
- Mod P000642017-01-17+$34,381= $16,262,517
- Mod P000652017-01-23+$0= $16,262,517
- Mod P000662017-02-07+$2,968= $16,265,485
- Mod P000672017-02-14+$70,500= $16,335,985
- Mod P000722017-03-06+$1,089= $16,337,074
- Mod P000682017-03-07+$800= $16,337,874
- Mod P000732017-03-07+$11,662= $16,349,536
- Mod P000692017-03-12+$3,926= $16,353,462
- Mod P000702017-03-12+$9,872= $16,363,334
- Mod P000712017-03-12+$4,893= $16,368,227
- Mod P000742017-03-17+$11,942= $16,380,169
- Mod P000762017-03-17+$4,315= $16,384,484
- Mod P000752017-03-18+$13,073= $16,397,557
- Mod P000772017-03-21-$6,022= $16,391,535
- Mod P000802017-09-27+$0= $16,391,535
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-12-23 | +$14,560,000 | $14,560,000 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00001· CHANGE ORDER | 2014-01-30 | +$13,000 | $14,573,000 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-10 | +$3,267 | $14,576,267 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00004· CHANGE ORDER | 2014-04-21 | +$13,335 | $14,589,602 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00006· CHANGE ORDER | 2014-04-21 | +$5,000 | $14,594,602 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00005· CHANGE ORDER | 2014-04-22 | +$4,500 | $14,599,102 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00008· CHANGE ORDER | 2014-04-28 | +$90,000 | $14,689,102 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00009· CHANGE ORDER | 2014-05-20 | +$720 | $14,689,822 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00014· CHANGE ORDER | 2014-09-03 | +$79,496 | $14,769,318 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-03 | +$44,038 | $14,813,357 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-11 | +$9,043 | $14,822,400 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-11 | +$3,379 | $14,825,779 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-11 | +$54,684 | $14,880,463 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-28 | +$0 | $14,880,463 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, |
| Mod P00003· CHANGE ORDER | 2014-11-06 | +$95,000 | $14,975,463 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00017· CHANGE ORDER | 2014-11-06 | +$10,000 | $14,985,463 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00026· CHANGE ORDER | 2014-11-10 | +$4,500 | $14,989,963 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00024· CHANGE ORDER | 2014-12-02 | +$61,875 | $15,051,838 | IGF::OT::IGF, P00024 ISSUED TO REMOVE ASBESTOS TILE AND MASTIC AND REPLACE WITH NEW VINYL PLANK FLOORING ON TH… |
| Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-24 | +$5,500 | $15,057,338 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$5,200 | $15,062,538 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$19,400 | $15,081,938 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$5,500 | $15,087,438 | IGF::OT::IGF, P00024 ISSUED TO REMOVE ASBESTOS TILE AND MASTIC AND REPLACE WITH NEW VINYL PLANK FLOORING ON TH… |
| Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$7,300 | $15,094,738 | IGF::OT::IGF, P00033 ACT TILE REPLACEMENT |
| Mod P00034· CHANGE ORDER | 2015-02-05 | +$6,400 | $15,101,138 | IGF::OT::IGF, P00034 BULLETIN #5 WORK |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-25 | +$5,500 | $15,106,638 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00029· CHANGE ORDER | 2015-02-25 | +$40,000 | $15,146,638 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00030· CHANGE ORDER | 2015-02-25 | +$36,725 | $15,183,363 | IGF::OT::IGF, P00024 ISSUED TO REMOVE ASBESTOS TILE AND MASTIC AND REPLACE WITH NEW VINYL PLANK FLOORING ON TH… |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-25 | +$1,950 | $15,185,313 | IGF::OT::IGF, P00024 ISSUED TO REMOVE ASBESTOS TILE AND MASTIC AND REPLACE WITH NEW VINYL PLANK FLOORING ON TH… |
| Mod P00019· DEFINITIZE CHANGE ORDER | 2015-02-27 | +$8,835 | $15,194,148 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-04 | +$90,000 | $15,284,148 | IGF::OT::IGF, P00036 INSTALL CONDUIT FOR PUBLIC ADDRESS SYSTEM WIRING IN CONCEALED AREAS. |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-04 | +$74,000 | $15,358,148 | IGF::OT::IGF, P00034 BULLETIN #5 WORK |
| Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-12 | +$95,000 | $15,453,148 | IGF::OT::IGF, P00037 INSTALL EMT CONDUIT FOR VOICE/DATA WIRING WHERE WIRING ARE CONCEALED. |
| Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$7,307 | $15,460,455 | IGF::OT::IGF, P00034 BULLETIN #5 WORK |
| Mod P00020· CHANGE ORDER | 2015-03-31 | +$15,000 | $15,475,455 | IGF::OT::IGF, CONTRACTOR WILL REPLACE HVAC PIPING |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | +$23,000 | $15,498,455 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | +$10,000 | $15,508,455 | IGF::OT::IGF, CONTRACT WILL BE AWARDED TO CALCEDO CONSTRUCTION CORPORATION, A SMALL BUSINESS, TO PROCEED WITH… |
| Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | +$70,000 | $15,578,455 | IGF::OT::IGF, P00040 |
| Mod P00041· DEFINITIZE CHANGE ORDER | 2015-05-14 | +$1,000 | $15,579,455 | IGF::OT::IGF, P00041 PIPING CHANGE |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | +$19,000 | $15,598,455 | IGF::OT::IGF, P00042 |
| Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$2,200 | $15,600,655 | IGF::OT::IGF, P00035 INSTALL ADDITIONAL RECEPTACLES |
| Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$13,250 | $15,613,905 | IGF::OT::IGF, P00043 |
| Mod P00044· DEFINITIZE CHANGE ORDER | 2015-07-14 | +$5,600 | $15,619,505 | IGF::OT::IGF, P00044 BULLETIN #5 WORK |
| Mod P00049· DEFINITIZE CHANGE ORDER | 2015-09-21 | +$0 | $15,619,505 | IGF::OT::IGF, P00049 ISSUED FOR $0.00 AND (36) DAYS ADDITIONAL CONTRACT TIME |
| Mod P00045· DEFINITIZE CHANGE ORDER | 2015-09-24 | +$34,724 | $15,654,229 | IGF::OT::IGF, P00045 DEFINITIZES P00003 BULLETIN #1 WORK |
| Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$99,062 | $15,753,291 | IGF::OT::IGF, P00046 SA FOR COR 20,49,56,ETC |
| Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$31,180 | $15,784,471 | IGF::OT::IGF, P00047 SA FOR COR #75,76 |
| Mod P00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$71,785 | $15,856,256 | IGF::OT::IGF, P00048 ISSUED FOR ADDITIONAL WORK ON THE ELECTRICAL RISER |
| Mod P00051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$22,500 | $15,878,756 | IGF::OT::IGF, P00051 ISSUED FOR IT DELAYS CAUSED BY THE MEDICAL CENTER |
| Mod P00052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$144,000 | $16,022,756 | IGF::OT::IGF, P00052 ISSUED FOR HVAC SHUTDOWN DELAY |
| Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$36,000 | $16,058,756 | IGF::OT::IGF, P00053 ISSUED FOR THE DELAY CAUSED BY THE AE NOT PROVIDING THE DIGITAL FILE FOR PRINTS |
| Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-19 | +$94,495 | $16,153,251 | IGF::OT::IGF, P00050 ISSUED FOR THE DELAY CAUSED BY THE VAMC NOT SCHEDULING THE WORK IN A TIMELY MANNER PLUS A… |
| Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-12 | +$34,000 | $16,187,251 | IGF::OT::IGF, P00054 ISSUED FOR THE DELAY CAUSED BY THE VAMC NOT SCHEDULING THE WORK IN A TIMELY MANNER PLUS A… |
| Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-19 | +$0 | $16,187,251 | IGF::OT::IGF, P00055 ISSUED AS NO COST TIME EXTENSION AS COORDINATION ISSUES TO COMPLETE PUNCH LIST ITEMS CONT… |
| Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$0 | $16,187,251 | IGF::OT::IGF, P00056 ISSUED AS NO COST TIME EXTENSION AS COORDINATION ISSUES TO COMPLETE PUNCH LIST ITEMS CONT… |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-28 | +$0 | $16,187,251 | IGF::OT::IGF, P00056 ISSUED AS NO COST TIME EXTENSION AS COORDINATION ISSUES TO COMPLETE PUNCH LIST ITEMS CONT… |
| Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$14,039 | $16,201,290 | IGF::OT::IGF, P00060 |
| Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$1,202 | $16,202,492 | IGF::OT::IGF, P00060 |
| Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-20 | −$1,124 | $16,201,368 | IGF::OT::IGF, P00058 CONTINUES |
| Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-14 | +$10,000 | $16,211,368 | IGF::OT::IGF, P00061 |
| Mod P00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$16,769 | $16,228,137 | IGF::OT::IGF, P00063 |
| Mod P00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-22 | +$0 | $16,228,137 | IGF::OT::IGF, P00062 NO COST TIME EXTENSION 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-17 | +$34,381 | $16,262,517 | IGF::OT::IGF, P00064 |
| Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-23 | +$0 | $16,262,517 | IGF::OT::IGF, P00065 NO COST TIME EXTENSION 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-07 | +$2,968 | $16,265,485 | IGF::OT::IGF, P00066 9TH FLOOR RENOVATION, VAMC MANHATTAN |
| Mod P00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-14 | +$70,500 | $16,335,985 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-06 | +$1,089 | $16,337,074 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-07 | +$800 | $16,337,874 | IGF::OT::IGF, P00068 9TH FLOOR RENOVATION, VAMC MANHATTAN. |
| Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-07 | +$11,662 | $16,349,536 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-12 | +$3,926 | $16,353,462 | IGF::OT::IGF, P00069 9TH FLOOR RENOVATION, VAMC MANHATTAN. |
| Mod P00070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-12 | +$9,872 | $16,363,334 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. |
| Mod P00071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-12 | +$4,893 | $16,368,227 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. |
| Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-17 | +$11,942 | $16,380,169 | IGF::OT::IGF,9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-17 | +$4,315 | $16,384,484 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-18 | +$13,073 | $16,397,557 | IGF::OT::IGF,9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-21 | −$6,022 | $16,391,535 | IGF::OT::IGF, 9TH FLOOR RENOVATION, VAMC MANHATTAN. HURRICANE SANDY |
| Mod P00080· FUNDING ONLY ACTION | 2017-09-27 | +$0 | $16,391,535 | IGF::OT::IGF, P00080 MOD TO COMPLETE CLOSEOUT, VAMC MANHATTAN. HURRICANE SANDY |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI R37VE6WCJGW5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA101F15C0034 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $24,364,242 | FY2015 |
Other recipients under C1DB from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F23N0060 | TOLAND MIZELL MOLNAR LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $128,491 | FY2023 |
| 36C10F22N0059 | FFE ENVIRONMENTAL SERVICES INC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $914,288 | FY2022 |
| 36C10F22N0054 | GUIDON DESIGN INC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $1,183,216 | FY2022 |
| 36C10F18N3158 | TOLAND MIZELL MOLNAR LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $158,299 | FY2018 |