Award recordCONTRACT

LEO A. DALY LLC

PIID VA101F12J0004· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING· FY2012· $3,655,832 net obligations· UEI K3ZVY8RLBSJ8· CA

Description

LONG BEACH DEMO BUILDING 8 DESIGN, THIS MODIFICATION DEOBLIGATES THE FINAL RESIDUAL FUNDS FROM THIS PROJECT.

Base award description: LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II.

First action · last action
2012-04-30 · 2022-03-25
Transactions
38
First transaction's obligation
$694,012
Base + all options value (sum of deltas)
$4,528,656
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
—
Offers received
—
SDVOSB flag on record
No
Parent IDV
VA101CFMP0147
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 38 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$3,743,593$0Base award · 2012-04-30 · this action $694,012 · running total $694,012Modification P00002 · 2013-01-16 · this action $37,623 · running total $731,635Modification P00003 · 2013-04-24 · this action $12,788 · running total $744,423Modification P00004 · 2013-05-20 · this action $58,345 · running total $802,768Modification P00001 · 2013-06-17 · this action $872,824 · running total $1,675,592Modification P00005 · 2013-06-18 · this action $11,971 · running total $1,687,563Modification P00006 · 2013-06-28 · this action $58,345 · running total $1,745,908Modification P00007 · 2014-07-23 · this action $99,858 · running total $1,845,765Modification P00008 · 2014-07-23 · this action $44,532 · running total $1,890,297Modification P00009 · 2014-07-23 · this action $76,527 · running total $1,966,824Modification P00010 · 2014-08-01 · this action $62,039 · running total $2,028,863Modification P00011 · 2014-08-05 · this action $23,434 · running total $2,052,297Modification P00012 · 2014-08-21 · this action $14,142 · running total $2,066,439Modification P00013 · 2014-09-23 · this action $8,208 · running total $2,074,646Modification P00014 · 2014-10-22 · this action $18,411 · running total $2,093,058Modification P00015 · 2015-01-15 · this action $17,380 · running total $2,110,438Modification P00016 · 2015-01-29 · this action $70,560 · running total $2,180,998Modification P00017 · 2015-01-29 · this action $96,730 · running total $2,277,728Modification P00018 · 2015-09-16 · this action $12,629 · running total $2,290,358Modification P00019 · 2015-12-21 · this action $127,224 · running total $2,417,582Modification P00020 · 2016-03-08 · this action $3,016 · running total $2,420,597Modification P00021 · 2016-10-26 · this action $2,523 · running total $2,423,121Modification P00022 · 2016-12-29 · this action $662 · running total $2,423,782Modification P00023 · 2017-01-12 · this action $18,899 · running total $2,442,681Modification P00026 · 2017-07-12 · this action $32,202 · running total $2,474,883Modification P00025 · 2017-08-15 · this action $20,705 · running total $2,495,588Modification P00027 · 2017-09-18 · this action -$11,487 · running total $2,484,101Modification P00028 · 2017-10-12 · this action $5,572 · running total $2,489,673Modification P00029 · 2019-03-15 · this action $16,246 · running total $2,505,919Modification P00030 · 2019-05-03 · this action $15,000 · running total $2,520,919Modification P00032 · 2019-09-25 · this action $1,071,178 · running total $3,592,097Modification P00031 · 2020-02-05 · this action $129,144 · running total $3,721,241Modification P00033 · 2020-04-15 · this action $15,000 · running total $3,736,241Modification P00034 · 2020-07-21 · this action $7,353 · running total $3,743,593Modification P00035 · 2020-08-28 · this action -$156,285 · running total $3,587,309Modification P00036 · 2021-02-23 · this action $0 · running total $3,587,309Modification P00037 · 2022-03-09 · this action $98,556 · running total $3,685,865Modification P00038 · 2022-03-25 · this action -$30,033 · running total $3,655,832
  • Base2012-04-30+$694,012= $694,012
  • Mod P000022013-01-16+$37,623= $731,635
  • Mod P000032013-04-24+$12,788= $744,423
  • Mod P000042013-05-20+$58,345= $802,768
  • Mod P000012013-06-17+$872,824= $1,675,592
  • Mod P000052013-06-18+$11,971= $1,687,563
  • Mod P000062013-06-28+$58,345= $1,745,908
  • Mod P000072014-07-23+$99,858= $1,845,765
  • Mod P000082014-07-23+$44,532= $1,890,297
  • Mod P000092014-07-23+$76,527= $1,966,824
  • Mod P000102014-08-01+$62,039= $2,028,863
  • Mod P000112014-08-05+$23,434= $2,052,297
  • Mod P000122014-08-21+$14,142= $2,066,439
  • Mod P000132014-09-23+$8,208= $2,074,646
  • Mod P000142014-10-22+$18,411= $2,093,058
  • Mod P000152015-01-15+$17,380= $2,110,438
  • Mod P000162015-01-29+$70,560= $2,180,998
  • Mod P000172015-01-29+$96,730= $2,277,728
  • Mod P000182015-09-16+$12,629= $2,290,358
  • Mod P000192015-12-21+$127,224= $2,417,582
  • Mod P000202016-03-08+$3,016= $2,420,597
  • Mod P000212016-10-26+$2,523= $2,423,121
  • Mod P000222016-12-29+$662= $2,423,782
  • Mod P000232017-01-12+$18,899= $2,442,681
  • Mod P000262017-07-12+$32,202= $2,474,883
  • Mod P000252017-08-15+$20,705= $2,495,588
  • Mod P000272017-09-18-$11,487= $2,484,101
  • Mod P000282017-10-12+$5,572= $2,489,673
  • Mod P000292019-03-15+$16,246= $2,505,919
  • Mod P000302019-05-03+$15,000= $2,520,919
  • Mod P000322019-09-25+$1,071,178= $3,592,097
  • Mod P000312020-02-05+$129,144= $3,721,241
  • Mod P000332020-04-15+$15,000= $3,736,241
  • Mod P000342020-07-21+$7,353= $3,743,593
  • Mod P000352020-08-28-$156,285= $3,587,309
  • Mod P000362021-02-23+$0= $3,587,309
  • Mod P000372022-03-09+$98,556= $3,685,865
  • Mod P000382022-03-25-$30,033= $3,655,832
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2012-04-30+$694,012$694,012LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II.
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-16+$37,623$731,635IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II, BLDG 126OP SECOND FLOOR REDESIGN.
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-24+$12,788$744,423IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II SD-2 PEER REVIEW PRESENTATION FOR VACO CSS…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-05-20+$58,345$802,768IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, BUILDING 8 DEMOLITION PRE-DESIGN.
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-17+$872,824$1,675,592IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II. EXERCISE THE PRE-PRICED AND APPROVED CD…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-18+$11,971$1,687,563IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, PHASE II. EVALUATION OF HVAC EFFECT ON DESIGN.
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-28+$58,345$1,745,908IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, BUILDING 8 DEMOLITION PRE-DESIGN. STRUCTURAL STUDY…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-23+$99,858$1,845,765IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, BUILDING 8 DEMOLITION PRE-DESIGN. STRUCTURAL STUDY…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-23+$44,532$1,890,297IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, BUILDING 8 DEMOLITION PRE-DESIGN. STRUCTURAL STUDY…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-23+$76,527$1,966,824IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, BUILDING 8 DEMOLITION PRE-DESIGN. STRUCTURAL STUDY…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-01+$62,039$2,028,863IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, B126 RENOVATE ENTRYWAY, CORRIDORS AND ELEVATOR LOBB…
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-05+$23,434$2,052,297IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, INSTALL FOUR BARIATRIC LIFTS IN B126 AND 126OP.
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-21+$14,142$2,066,439IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PROJECT 600-402B, RENOVATE THE OPTOMETRY CLINIC IN ACCORDANCE WITH PA…
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-23+$8,208$2,074,646IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, DD1 PEER REVIEW PRINTING COSTS.
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-22+$18,411$2,093,058IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, DD1 VACO TRIP FOR 5 CONTRACTOR PERSONNEL.
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-15+$17,380$2,110,438IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, ELECTRICAL METERING.
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-29+$70,560$2,180,998IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, DIGITAL SECURITY DESIGN SERVICES.
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-29+$96,730$2,277,728IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, DIGITAL IT DESIGN.
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-16+$12,629$2,290,358IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, SD-1 REVIEW PRINTING
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-21+$127,224$2,417,582IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, PROJECT 600-402B, ADDITIONAL CONSTRUCTION PHASING
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-08+$3,016$2,420,597IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD PRINTING AWARD PROJECT 600-402B
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-26+$2,523$2,423,121IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD2 PRINTING AWARD PROJECT 600-402B
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-12-29+$662$2,423,782IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL CD2 PRINTING AND DISTRIBUTION AWARD PROJECT 600-…
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-12+$18,899$2,442,681IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL CD2 PRINTING AND DISTRIBUTION AWARD PROJECT 600-…
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-12+$32,202$2,474,883IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD2 PRINTING AWARD PROJECT 600-402B
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-15+$20,705$2,495,588IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD2 PRINTING AWARD PROJECT 600-402B
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-18−$11,487$2,484,101IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD2 PRINTING AWARD PROJECT 600-402B
Mod P00028· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2017-10-12+$5,572$2,489,673IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, CD2 PRINTING AWARD PROJECT 600-402B
Mod P00029· CHANGE ORDER2019-03-15+$16,246$2,505,919IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL DESIGN SERVICES FOR INSTALLATION OF AUDIOLOGY BO…
Mod P00030· CHANGE ORDER2019-05-03+$15,000$2,520,919IGF::OT::IGF LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL FUNDS FOR ADDED DESIGN SERVICES FOR INSTALLATION…
Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-25+$1,071,178$3,592,097LONG BEACH SEISMIC DESIGN, PHASE II, BUILDING 8 DEMOLITION DESIGN THROUGH CD'S.
Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-05+$129,144$3,721,241LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL FUNDS FOR ADDED DESIGN SERVICES FOR INSTALLATION OF AUDIOLOGY…
Mod P00033· CHANGE ORDER2020-04-15+$15,000$3,736,241LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL FUNDS FOR ADDED DESIGN SERVICES FOR INSTALLATION OF AUDIOLOGY…
Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-07-21+$7,353$3,743,593LONG BEACH SEISMIC DESIGN, PHASE II, ADDITIONAL FUNDS FOR ADDED DESIGN SERVICES/SITE VISITS FOR COMMISSIONING…
Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-08-28−$156,285$3,587,309LONG BEACH DEMO BUILDING 8 DESIGN, CHANGE TO DESIGN BUILD BRIDGING DOCUMENTS DESIGN
Mod P00036· OTHER ADMINISTRATIVE ACTION2021-02-23+$0$3,587,309LONG BEACH DEMO BUILDING 8 DESIGN, CHANGE TO DESIGN BUILD BRIDGING DOCUMENTS DESIGN EXTENSION OF OBLIGATION EN…
Mod P00037· OTHER ADMINISTRATIVE ACTION2022-03-09+$98,556$3,685,865CLOSEOUT FOR TASK ORDERS VA101F-12-J-0002 AND VA101F-12-J-0004, PER BUDGET ANALYST AUDIT OF ACCOUNTS.
Mod P00038· OTHER ADMINISTRATIVE ACTION2022-03-25−$30,033$3,655,832LONG BEACH DEMO BUILDING 8 DESIGN, THIS MODIFICATION DEOBLIGATES THE FINAL RESIDUAL FUNDS FROM THIS PROJECT.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI K3ZVY8RLBSJ8)

AwardOffice · PSC / listingNet obligationsFY
36C10F24C0011OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$611,175FY2024
36C10F20C0012OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$6,484,310FY2020
VA26216J7764262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS$295,104FY2016
VA26216J7279262-NETWORK CONTRACT OFFICE 22 (36C262) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$10,000FY2016
VA101F16J2658OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$163,546FY2016
VA26216J3151262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$960,070FY2016

Other recipients under C215 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F25C50004ABOVE GROUP INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,083,926FY2025
36C10F24C50028BLUE TRIDENT, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,689,012FY2024
36C10F20N0089FFE ENVIRONMENTAL SERVICES INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$1,258,508FY2020
36C10F20N0062ALESIA ARCHITECTURE PCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$695,134FY2020
36C10F20N0020ALESIA ARCHITECTURE PCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$206,560FY2020

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101F12J0004_3600_VA101CFMP0147_3600 · retrieved 2026-09-26.