Award recordCONTRACT

MALDONADO, ADRIAN & ASSOCIATES

PIID VA101F12C0038· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES· FY2012· $62,554 net obligations· UEI RKSQJVGTBL33· OH

Description

USE CCTV CAMERA TO INSPECT UNDER DRAIN PIPES NEAR FLAG ASSEMBLY AREA FOR ANY DAMAGE. SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEMETERY JACKSONVILLE, FLORIDA

Base award description: SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEMETERY JACKSONVILLE, FLORIDA

First action · last action
2012-06-04 · 2012-09-25
Transactions
9
First transaction's obligation
$35,757
Base + all options value (sum of deltas)
$62,554
Extent competed
COMPETED UNDER SAP
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
2
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 9 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$62,554$0Base award · 2012-06-04 · this action $35,757 · running total $35,757Modification P00001 · 2012-07-20 · this action $12,061 · running total $47,818Modification P00002 · 2012-07-31 · this action $2,132 · running total $49,950Modification P00003 · 2012-08-06 · this action $5,438 · running total $55,387Modification P00004 · 2012-08-10 · this action $0 · running total $55,387Modification P00005 · 2012-08-24 · this action $5,685 · running total $61,072Modification P00006 · 2012-08-31 · this action -$1,945 · running total $59,127Modification P00007 · 2012-09-05 · this action $0 · running total $59,127Modification P00008 · 2012-09-25 · this action $3,426 · running total $62,554
  • Base2012-06-04+$35,757= $35,757
  • Mod P000012012-07-20+$12,061= $47,818
  • Mod P000022012-07-31+$2,132= $49,950
  • Mod P000032012-08-06+$5,438= $55,387
  • Mod P000042012-08-10+$0= $55,387
  • Mod P000052012-08-24+$5,685= $61,072
  • Mod P000062012-08-31-$1,945= $59,127
  • Mod P000072012-09-05+$0= $59,127
  • Mod P000082012-09-25+$3,426= $62,554
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2012-06-04+$35,757$35,757SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEMETERY JACKSONVILLE, FLORIDA
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$12,061$47,818ADJUSTMENT TO REPAIR UNDERDRAIN. ACTUAL CONDITIONS DO NOT MATCH THE AS BUILT PLANS. SECTION 2 CRYPT SUB-DRAIN…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-31+$2,132$49,950CHANGE IN DESIGN TO IMPROVE DRAINAGE. SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEMETERY JACKSON…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-06+$5,438$55,387ADDITIONAL SUB-DRAIN WORK NEAR FLAG ASSEMBLY AREA SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEME…
Mod P00004· OTHER ADMINISTRATIVE ACTION2012-08-10+$0$55,387TIME EXTENSION TO ASSESS PLUG REPAIR IN DRAINAGE SYSTEM SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONA…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-24+$5,685$61,072REMOVE PLUG IN RETENTION PLUG SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONVILLE NATIONAL CEMETERY JACKSONVILLE, F…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-31−$1,945$59,127ADDITIONAL WORK TO DEWATER CRYPTS AND CREDIT FOR WORK NOT PERFORMED SECTION 2 CRYPT SUB-DRAIN REPAIRS JACKSONV…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-05+$0$59,127TIME EXTENSION TO ALLOW FOR RFP ON ADDITIONAL UNDER DRAIN WORK WITHIN SCOPE IGF::OT::IGF
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-25+$3,426$62,554USE CCTV CAMERA TO INSPECT UNDER DRAIN PIPES NEAR FLAG ASSEMBLY AREA FOR ANY DAMAGE. SECTION 2 CRYPT SUB-DRAIN…

Related awards · 2

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other recipients under Y1PZ from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101F12C0051C & C CONTRACTORS LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$67,594FY2013
VA101F12C0012HERMAN CONSTRUCTION GROUP, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$282,600FY2012

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101F12C0038_3600_-NONE-_-NONE- · retrieved 2026-09-26.