Description
IGF::OT::IGF DE-OBLIGATION OF FUNDS FOR CONTRACT CLOSEOUT
Base award description: PHASE 2 GRAVESITE DEVELOPMENT&CEMETERY IMPROVEMENTS TAHOMA NATIONAL CEMETERY KENT, WA
Modification chain · 64 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2012-05-02+$20,239,000= $20,239,000
- Mod P000012013-02-20+$22,045= $20,261,045
- Mod P000022013-02-20+$99,000= $20,360,045
- Mod P000032013-07-26+$11,142= $20,371,187
- Mod P000042013-07-26+$3,440= $20,374,627
- Mod P000052013-07-26+$2,328= $20,376,955
- Mod P000062013-07-26+$1,755= $20,378,710
- Mod P000072013-07-26+$614= $20,379,324
- Mod P000082013-07-26+$26,688= $20,406,012
- Mod P000092013-07-26+$11,131= $20,417,143
- Mod P000112013-07-26-$2,084= $20,415,059
- Mod P000122013-07-26+$4,400= $20,419,459
- Mod P000132013-07-26+$3,698= $20,423,157
- Mod P000102013-08-27+$2,139= $20,425,296
- Mod P000142013-08-27+$22,000= $20,447,296
- Mod P000152013-09-27+$6,300= $20,453,596
- Mod P000172013-10-21+$4,718= $20,458,314
- Mod P000182013-10-21+$18,396= $20,476,710
- Mod P000252013-10-21+$3,000= $20,479,710
- Mod P000192013-10-22+$2,814= $20,482,524
- Mod P000222013-10-22+$2,290= $20,484,814
- Mod P000232013-10-22+$3,757= $20,488,571
- Mod P000212013-10-25-$4,422= $20,484,150
- Mod P000162013-10-29+$2,000= $20,486,150
- Mod P000202013-10-29+$781= $20,486,930
- Mod P000262013-10-31+$5,909= $20,492,839
- Mod P000272013-10-31+$2,418= $20,495,257
- Mod P000282013-10-31+$1,321= $20,496,578
- Mod P000292013-10-31+$2,880= $20,499,458
- Mod P000302013-10-31+$3,209= $20,502,667
- Mod P000312013-10-31+$4,916= $20,507,583
- Mod P000242013-11-08+$6,590= $20,514,173
- Mod P000322013-11-08+$2,386= $20,516,559
- Mod P000332013-11-21+$3,607= $20,520,166
- Mod P000342013-11-21+$3,423= $20,523,589
- Mod P000352013-12-18+$1,650= $20,525,239
- Mod P000362013-12-18+$8,359= $20,533,598
- Mod P000392013-12-18+$13,596= $20,547,194
- Mod P000372013-12-19+$3,381= $20,550,575
- Mod P000382013-12-19+$5,221= $20,555,796
- Mod P000412013-12-30+$1,561= $20,557,357
- Mod P000402013-12-31+$65,232= $20,622,589
- Mod P000422014-01-31+$11,527= $20,634,117
- Mod P000432014-01-31+$4,757= $20,638,874
- Mod P000442014-01-31+$14,337= $20,653,211
- Mod P000452014-01-31+$40,340= $20,693,551
- Mod P000462014-02-21+$953= $20,694,504
- Mod P000472014-02-21+$13,273= $20,707,777
- Mod P000482014-02-21+$545= $20,708,322
- Mod P000492014-02-21+$2,414= $20,710,736
- Mod P000502014-02-21+$1,368= $20,712,104
- Mod P000512014-02-21+$44,396= $20,756,500
- Mod P000532014-04-17+$44,544= $20,801,044
- Mod P000542014-04-17+$3,968= $20,805,012
- Mod P000552014-04-17+$4,836= $20,809,848
- Mod P000522014-04-29+$11,500= $20,821,348
- Mod P000562014-04-29+$13,164= $20,834,512
- Mod P000572014-04-29+$2,750= $20,837,262
- Mod P000582014-11-13-$6,300= $20,830,962
- Mod P000592014-11-13+$2,064= $20,833,026
- Mod P000602014-11-14+$1,263= $20,834,289
- Mod P000612014-11-14+$15,164= $20,849,453
- Mod P000862015-08-06-$26,715= $20,822,738
- Mod P000872017-03-14-$576,000= $20,246,738
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2012-05-02 | +$20,239,000 | $20,239,000 | PHASE 2 GRAVESITE DEVELOPMENT&CEMETERY IMPROVEMENTS TAHOMA NATIONAL CEMETERY KENT, WA |
| Mod P00001· CHANGE ORDER | 2013-02-20 | +$22,045 | $20,261,045 | IGF::OT::IGF CO-01A, NORTHEAST WETLAND MITIGATION CONTOUR CHANGES AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00002· CHANGE ORDER | 2013-02-20 | +$99,000 | $20,360,045 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00003· CHANGE ORDER | 2013-07-26 | +$11,142 | $20,371,187 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00004· CHANGE ORDER | 2013-07-26 | +$3,440 | $20,374,627 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00005· CHANGE ORDER | 2013-07-26 | +$2,328 | $20,376,955 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00006· CHANGE ORDER | 2013-07-26 | +$1,755 | $20,378,710 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00007· CHANGE ORDER | 2013-07-26 | +$614 | $20,379,324 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00008· CHANGE ORDER | 2013-07-26 | +$26,688 | $20,406,012 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00009· CHANGE ORDER | 2013-07-26 | +$11,131 | $20,417,143 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00011· CHANGE ORDER | 2013-07-26 | −$2,084 | $20,415,059 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00012· CHANGE ORDER | 2013-07-26 | +$4,400 | $20,419,459 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00013· CHANGE ORDER | 2013-07-26 | +$3,698 | $20,423,157 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00010· CHANGE ORDER | 2013-08-27 | +$2,139 | $20,425,296 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00014· CHANGE ORDER | 2013-08-27 | +$22,000 | $20,447,296 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00015· CHANGE ORDER | 2013-09-27 | +$6,300 | $20,453,596 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00017· CHANGE ORDER | 2013-10-21 | +$4,718 | $20,458,314 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00018· CHANGE ORDER | 2013-10-21 | +$18,396 | $20,476,710 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00025· CHANGE ORDER | 2013-10-21 | +$3,000 | $20,479,710 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00019· CHANGE ORDER | 2013-10-22 | +$2,814 | $20,482,524 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00022· CHANGE ORDER | 2013-10-22 | +$2,290 | $20,484,814 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00023· CHANGE ORDER | 2013-10-22 | +$3,757 | $20,488,571 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00021· CHANGE ORDER | 2013-10-25 | −$4,422 | $20,484,150 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00016· CHANGE ORDER | 2013-10-29 | +$2,000 | $20,486,150 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00020· CHANGE ORDER | 2013-10-29 | +$781 | $20,486,930 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00026· CHANGE ORDER | 2013-10-31 | +$5,909 | $20,492,839 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00027· CHANGE ORDER | 2013-10-31 | +$2,418 | $20,495,257 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00028· CHANGE ORDER | 2013-10-31 | +$1,321 | $20,496,578 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00029· CHANGE ORDER | 2013-10-31 | +$2,880 | $20,499,458 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00030· CHANGE ORDER | 2013-10-31 | +$3,209 | $20,502,667 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00031· CHANGE ORDER | 2013-10-31 | +$4,916 | $20,507,583 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00024· CHANGE ORDER | 2013-11-08 | +$6,590 | $20,514,173 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00032· CHANGE ORDER | 2013-11-08 | +$2,386 | $20,516,559 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00033· CHANGE ORDER | 2013-11-21 | +$3,607 | $20,520,166 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00034· CHANGE ORDER | 2013-11-21 | +$3,423 | $20,523,589 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00035· CHANGE ORDER | 2013-12-18 | +$1,650 | $20,525,239 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00036· CHANGE ORDER | 2013-12-18 | +$8,359 | $20,533,598 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00039· CHANGE ORDER | 2013-12-18 | +$13,596 | $20,547,194 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00037· CHANGE ORDER | 2013-12-19 | +$3,381 | $20,550,575 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00038· CHANGE ORDER | 2013-12-19 | +$5,221 | $20,555,796 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00041· CHANGE ORDER | 2013-12-30 | +$1,561 | $20,557,357 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00040· CHANGE ORDER | 2013-12-31 | +$65,232 | $20,622,589 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00042· CHANGE ORDER | 2014-01-31 | +$11,527 | $20,634,117 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00043· CHANGE ORDER | 2014-01-31 | +$4,757 | $20,638,874 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00044· CHANGE ORDER | 2014-01-31 | +$14,337 | $20,653,211 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00045· CHANGE ORDER | 2014-01-31 | +$40,340 | $20,693,551 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00046· CHANGE ORDER | 2014-02-21 | +$953 | $20,694,504 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00047· CHANGE ORDER | 2014-02-21 | +$13,273 | $20,707,777 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00048· CHANGE ORDER | 2014-02-21 | +$545 | $20,708,322 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00049· CHANGE ORDER | 2014-02-21 | +$2,414 | $20,710,736 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00050· CHANGE ORDER | 2014-02-21 | +$1,368 | $20,712,104 | IGF::OT::IGF SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00051· CHANGE ORDER | 2014-02-21 | +$44,396 | $20,756,500 | IGF::OT::IGF P-00002, SECTION 25A CREMAINS ADDITION AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00053· CHANGE ORDER | 2014-04-17 | +$44,544 | $20,801,044 | IGF::OT::IGF SA-048, RAIN GARDEN SAFETY - ADDITIONAL STONE AND HANDRAILS, AT TAHOMA NATIONAL CEMETERY, KENT, W… |
| Mod P00054· CHANGE ORDER | 2014-04-17 | +$3,968 | $20,805,012 | IGF::OT::IGF SA-049, ADD LOCAL AREA REPAY CONTROLLER, AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00055· CHANGE ORDER | 2014-04-17 | +$4,836 | $20,809,848 | IGF::OT::IGF SA-050, PROVIDE NEW WATERING STATION AT OSSUARY AREA, AND PROVIDE MORTAR INSTEAD OF BACKER ROD AN… |
| Mod P00052· DEFINITIZE CHANGE ORDER | 2014-04-29 | +$11,500 | $20,821,348 | IGF::OT::IGF SA-047 DEF CO-01E, RELOCATE AND REWORK FRENCH DRAINS AT YOUNG MEMORIAL DRIVE AND AT OSSUARY ACCES… |
| Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | +$13,164 | $20,834,512 | IGF::OT::IGF SA-051, REMOVE AND RELOCATE TREES AT COLUMBARIUMS 3, 4 AND 5, AT TAHOMA NATIONAL CEMETERY, KENT,… |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | +$2,750 | $20,837,262 | IGF::OT::IGF SA-052 ADD STENCILING AT COLUMBARIUM #5, AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-13 | −$6,300 | $20,830,962 | IGF::OT::IGF SA-053 SA-058 TO CORRECT DOLLAR VALUE ISSUED ON SA-047, AT PHASE 2 GRAVESITE EXPANSION&CEMETERY I… |
| Mod P00059· OTHER ADMINISTRATIVE ACTION | 2014-11-13 | +$2,064 | $20,833,026 | IGF::OT::IGF SETTLEMENT BY DETERMINATION - ADD BRIDGE EXPANSION JOINTS, AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-14 | +$1,263 | $20,834,289 | IGF::OT::IGF SA-055 REMOVE MISC ITEMS ALONG CORTEGE RETAINING WALL, AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-14 | +$15,164 | $20,849,453 | IGF::OT::IGF SA-056 PROVIDE AND INSTALL INLINE PRESSURE REGULATOR, AT TAHOMA NATIONAL CEMETERY, KENT, WA |
| Mod P00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-06 | −$26,715 | $20,822,738 | IGF::OT::IGF. DUE TO U.S. BUILDERS GROUP INC. CEASED TO FUNCTION OR IN EXIST AS A CORPORATION DURING THE LATE… |
| Mod P00087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-14 | −$576,000 | $20,246,738 | IGF::OT::IGF DE-OBLIGATION OF FUNDS FOR CONTRACT CLOSEOUT |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI V9AXKY9KLVJ1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24514C0063 | 688-WASHINGTON DC · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2014 |
| VA24614C0013 | 246-NETWORK CONTRACTING OFFICE 6 · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $9,283 | FY2014 |
| VA24413C0103 | 540-CLARKSBURG · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $299,700 | FY2013 |
| VA655C00257 | 655-SAGINAW · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $11,614 | FY2010 |
| VA786AC0382 | NATIONAL CEMETERY ADMINISTRATION · Y216 · CONSTRUCTION OF DREDGING | $3,547,804 | FY2010 |
| VA246C0602 | 246-NETWORK CONTRACTING OFFICE 6 · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY | $1,646,980 | FY2010 |
Other recipients under Y1PC from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F26C0005 | GC & V CONSTRUCTION LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $59,890,000 | FY2026 |
| 36C10F25C0007 | HAMILTON PACIFIC CHAMBERLAIN LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $637,437 | FY2025 |
| 36C10F24C0007 | SEABEE CONSTRUCTION, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $79,106,191 | FY2024 |
| 36C10F24C0001 | RBVETCO, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $38,940,668 | FY2024 |
| 36C10F23C0008 | SGC SERVICES 2, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $42,010,850 | FY2023 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101F12C0030_3600_-NONE-_-NONE- · retrieved 2026-09-26.