Award recordCONTRACT

LEO A. DALY LLC

PIID VA101CFMP0102· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING· FY2010· $23,810,053 net obligations· UEI K3ZVY8RLBSJ8· CA

Description

DEOBLIGATION OF DESIGN DEVELOPMENT AS REQUIREMENT IS REMOVED FROM SCOPE.

Base award description: SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY)

First action · last action
2010-09-30 · 2025-09-30
Transactions
71
First transaction's obligation
$6,142,243
Base + all options value (sum of deltas)
$57,764,722
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
5
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 71 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$26,701,963$0Base award · 2010-09-30 · this action $6,142,243 · running total $6,142,243Modification SA001 · 2010-12-22 · this action $64,530 · running total $6,206,773Modification SA002 · 2011-02-23 · this action $15,512 · running total $6,222,285Modification SA003 · 2011-04-04 · this action $13,156 · running total $6,235,441Modification SA004 · 2011-06-27 · this action $48,702 · running total $6,284,143Modification SA005 · 2011-09-30 · this action $0 · running total $6,284,143Modification SA006 · 2011-09-30 · this action $37,142 · running total $6,321,286Modification SA007 · 2011-09-30 · this action $77,944 · running total $6,399,230Modification SA009 · 2011-09-30 · this action $368,722 · running total $6,767,952Modification SA008 · 2011-11-28 · this action $0 · running total $6,767,952Modification SA010 · 2011-12-05 · this action $266,935 · running total $7,034,887Modification SA012 · 2012-01-09 · this action $8,439 · running total $7,043,326Modification SA013 · 2012-01-31 · this action $31,626 · running total $7,074,952Modification P00002 · 2012-05-18 · this action $5,387 · running total $7,080,339Modification SA011 · 2012-06-22 · this action -$26,445 · running total $7,053,894Modification P00003 · 2012-07-13 · this action $388,223 · running total $7,442,117Modification P00004 · 2012-07-19 · this action $8,558 · running total $7,450,675Modification P00005 · 2012-07-26 · this action $38,992 · running total $7,489,667Modification P00006 · 2012-08-24 · this action $2,538 · running total $7,492,205Modification P00007 · 2012-11-19 · this action $35,120 · running total $7,527,325Modification P00008 · 2013-01-10 · this action $417,723 · running total $7,945,048Modification P00009 · 2013-01-16 · this action $37,255 · running total $7,982,303Modification P00010 · 2013-07-22 · this action $12,197 · running total $7,994,499Modification P00011 · 2013-09-30 · this action $877,382 · running total $8,871,881Modification P00012 · 2014-01-14 · this action $97,742 · running total $8,969,623Modification P00013 · 2014-01-14 · this action $70,343 · running total $9,039,966Modification P00015 · 2014-01-31 · this action $552,786 · running total $9,592,752Modification P00016 · 2014-02-26 · this action $80,596 · running total $9,673,348Modification P00017 · 2014-02-26 · this action $4,911 · running total $9,678,259Modification P00018 · 2014-03-19 · this action $12,846 · running total $9,691,105Modification P00019 · 2014-06-24 · this action $1,003,676 · running total $10,694,781Modification P00020 · 2014-08-14 · this action $80,547 · running total $10,775,328Modification P00021 · 2014-09-05 · this action $98,724 · running total $10,874,052Modification P00022 · 2014-09-16 · this action $11,829 · running total $10,885,882Modification P00014 · 2014-09-30 · this action $3,899,308 · running total $14,785,189Modification P00023 · 2014-10-22 · this action $9,727 · running total $14,794,916Modification P00025 · 2015-01-26 · this action $733,104 · running total $15,528,020Modification P00024 · 2015-02-04 · this action $60,154 · running total $15,588,174Modification P00026 · 2015-06-18 · this action $62,636 · running total $15,650,810Modification P00027 · 2015-09-15 · this action $86,366 · running total $15,737,176Modification P00028 · 2015-12-14 · this action $30,783 · running total $15,767,958Modification P00030 · 2016-09-02 · this action -$5,323 · running total $15,762,635Modification P00029 · 2016-09-21 · this action $37,606 · running total $15,800,241Modification P00031 · 2017-10-17 · this action $410,713 · running total $16,210,954Modification P00032 · 2017-11-06 · this action $577,742 · running total $16,788,696Modification P00033 · 2018-01-16 · this action $981,894 · running total $17,770,590Modification P00034 · 2018-04-13 · this action $2,396,584 · running total $20,167,174Modification P00035 · 2018-04-18 · this action $270,576 · running total $20,437,751Modification P00036 · 2018-04-20 · this action $392,385 · running total $20,830,136Modification P00037 · 2018-05-02 · this action $766,259 · running total $21,596,395Modification P00038 · 2018-05-11 · this action $0 · running total $21,596,395Modification P00039 · 2018-09-26 · this action $0 · running total $21,596,395Modification P00040 · 2018-10-30 · this action $400,580 · running total $21,996,974Modification P00042 · 2019-05-07 · this action $11,026 · running total $22,008,001Modification P00043 · 2019-08-03 · this action $529,770 · running total $22,537,771Modification P00041 · 2019-08-08 · this action $1,794,215 · running total $24,331,986Modification P0045 · 2020-07-16 · this action $0 · running total $24,331,986Modification P00046 · 2020-12-14 · this action $529,770 · running total $24,861,756Modification P00047 · 2021-10-01 · this action $0 · running total $24,861,756Modification P00049 · 2022-02-22 · this action $1,734,981 · running total $26,596,737Modification P00051 · 2022-06-10 · this action $30,156 · running total $26,626,894Modification P00050 · 2022-06-17 · this action $7,390 · running total $26,634,284Modification P00053 · 2022-09-16 · this action -$7,390 · running total $26,626,894Modification P00054 · 2022-09-16 · this action $7,390 · running total $26,634,284Modification P00055 · 2022-12-27 · this action $65,004 · running total $26,699,288Modification P00052 · 2023-05-01 · this action $2,675 · running total $26,701,963Modification P00056 · 2023-05-26 · this action -$505,113 · running total $26,196,850Modification P00058 · 2023-08-28 · this action -$1,573,314 · running total $24,623,536Modification P00057 · 2024-06-13 · this action $0 · running total $24,623,536Modification P00060 · 2024-10-25 · this action $0 · running total $24,623,536Modification P00059 · 2025-09-30 · this action -$813,482 · running total $23,810,053
  • Base2010-09-30+$6,142,243= $6,142,243
  • Mod SA0012010-12-22+$64,530= $6,206,773
  • Mod SA0022011-02-23+$15,512= $6,222,285
  • Mod SA0032011-04-04+$13,156= $6,235,441
  • Mod SA0042011-06-27+$48,702= $6,284,143
  • Mod SA0052011-09-30+$0= $6,284,143
  • Mod SA0062011-09-30+$37,142= $6,321,286
  • Mod SA0072011-09-30+$77,944= $6,399,230
  • Mod SA0092011-09-30+$368,722= $6,767,952
  • Mod SA0082011-11-28+$0= $6,767,952
  • Mod SA0102011-12-05+$266,935= $7,034,887
  • Mod SA0122012-01-09+$8,439= $7,043,326
  • Mod SA0132012-01-31+$31,626= $7,074,952
  • Mod P000022012-05-18+$5,387= $7,080,339
  • Mod SA0112012-06-22-$26,445= $7,053,894
  • Mod P000032012-07-13+$388,223= $7,442,117
  • Mod P000042012-07-19+$8,558= $7,450,675
  • Mod P000052012-07-26+$38,992= $7,489,667
  • Mod P000062012-08-24+$2,538= $7,492,205
  • Mod P000072012-11-19+$35,120= $7,527,325
  • Mod P000082013-01-10+$417,723= $7,945,048
  • Mod P000092013-01-16+$37,255= $7,982,303
  • Mod P000102013-07-22+$12,197= $7,994,499
  • Mod P000112013-09-30+$877,382= $8,871,881
  • Mod P000122014-01-14+$97,742= $8,969,623
  • Mod P000132014-01-14+$70,343= $9,039,966
  • Mod P000152014-01-31+$552,786= $9,592,752
  • Mod P000162014-02-26+$80,596= $9,673,348
  • Mod P000172014-02-26+$4,911= $9,678,259
  • Mod P000182014-03-19+$12,846= $9,691,105
  • Mod P000192014-06-24+$1,003,676= $10,694,781
  • Mod P000202014-08-14+$80,547= $10,775,328
  • Mod P000212014-09-05+$98,724= $10,874,052
  • Mod P000222014-09-16+$11,829= $10,885,882
  • Mod P000142014-09-30+$3,899,308= $14,785,189
  • Mod P000232014-10-22+$9,727= $14,794,916
  • Mod P000252015-01-26+$733,104= $15,528,020
  • Mod P000242015-02-04+$60,154= $15,588,174
  • Mod P000262015-06-18+$62,636= $15,650,810
  • Mod P000272015-09-15+$86,366= $15,737,176
  • Mod P000282015-12-14+$30,783= $15,767,958
  • Mod P000302016-09-02-$5,323= $15,762,635
  • Mod P000292016-09-21+$37,606= $15,800,241
  • Mod P000312017-10-17+$410,713= $16,210,954
  • Mod P000322017-11-06+$577,742= $16,788,696
  • Mod P000332018-01-16+$981,894= $17,770,590
  • Mod P000342018-04-13+$2,396,584= $20,167,174
  • Mod P000352018-04-18+$270,576= $20,437,751
  • Mod P000362018-04-20+$392,385= $20,830,136
  • Mod P000372018-05-02+$766,259= $21,596,395
  • Mod P000382018-05-11+$0= $21,596,395
  • Mod P000392018-09-26+$0= $21,596,395
  • Mod P000402018-10-30+$400,580= $21,996,974
  • Mod P000422019-05-07+$11,026= $22,008,001
  • Mod P000432019-08-03+$529,770= $22,537,771
  • Mod P000412019-08-08+$1,794,215= $24,331,986
  • Mod P00452020-07-16+$0= $24,331,986
  • Mod P000462020-12-14+$529,770= $24,861,756
  • Mod P000472021-10-01+$0= $24,861,756
  • Mod P000492022-02-22+$1,734,981= $26,596,737
  • Mod P000512022-06-10+$30,156= $26,626,894
  • Mod P000502022-06-17+$7,390= $26,634,284
  • Mod P000532022-09-16-$7,390= $26,626,894
  • Mod P000542022-09-16+$7,390= $26,634,284
  • Mod P000552022-12-27+$65,004= $26,699,288
  • Mod P000522023-05-01+$2,675= $26,701,963
  • Mod P000562023-05-26-$505,113= $26,196,850
  • Mod P000582023-08-28-$1,573,314= $24,623,536
  • Mod P000572024-06-13+$0= $24,623,536
  • Mod P000602024-10-25+$0= $24,623,536
  • Mod P000592025-09-30-$813,482= $23,810,053
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-09-30+$6,142,243$6,142,243SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY)
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-22+$64,530$6,206,773GOVERNMENT TO UNILATERALLY EXERCISE FIRM FIXED PRICED OPTION ITEM NO. 6, LEED CERTIFICATION - BLDG. 209 (SD AN…
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-23+$15,512$6,222,285SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) CONTRACTOR SHALL…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-04+$13,156$6,235,441SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) CONTRACTOR SHALL…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-27+$48,702$6,284,143SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) CONTRACTOR SHALL…
Mod SA005· OTHER ADMINISTRATIVE ACTION2011-09-30+$0$6,284,143SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) ADMINISTRATIVE CH…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$37,142$6,321,286SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) ADDITIONAL TIME I…
Mod SA007· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-09-30+$77,944$6,399,230SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) AE TO PROVIDE ADD…
Mod SA009· EXERCISE AN OPTION2011-09-30+$368,722$6,767,952SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) THIS IS TO EXERCI…
Mod SA008· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-11-28+$0$6,767,952SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 (SD AND DD ONLY) SA-008 IS TO ADD…
Mod SA010· EXERCISE AN OPTION2011-12-05+$266,935$7,034,887SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 THIS IS TO EXERCISE OPTION FOR LIN…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-09+$8,439$7,043,326SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 THIS IS TO PROVIDE ADDITIONAL TOPO…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-31+$31,626$7,074,952SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 THIS IS TO PROVIDE ADDITIONAL TOPO…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-18+$5,387$7,080,339SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. PUBLICATION OF NEPA FINDING OF NO…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22−$26,445$7,053,894SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209 THIS IS TO ADJUST THE DESIGN FEE F…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-13+$388,223$7,442,117SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. PUBLICATION OF NEPA FINDING OF NO…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-19+$8,558$7,450,675SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. PUBLICATION OF NEPA FINDING OF NO…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$38,992$7,489,667SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. PUBLICATION OF NEPA FINDING OF NO…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-24+$2,538$7,492,205SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. B209 CONSTRUCTION PRE-PROPOSAL CO…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-19+$35,120$7,527,325SEISMIC AND FCA CORRECTIONS OF 10 BUILDINGS AND RENOVATION OF BUILDING 209. B209 CONSTRUCTION PRE-PROPOSAL CO…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-10+$417,723$7,945,048B209 CONSTRUCTION PERIOD SERVICES, INCLUDING LEED CERTIFICATION FOR RENOVATION
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-16+$37,255$7,982,303TO ADD THIRD PARTY IH SERVICES
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-07-22+$12,197$7,994,499B209 ADDITIONAL DESIGN SERVICES INCLUDING ICEMAKER, LEED CERTIFICATION ADDED HOURS, ASBESTOS ABATEMENT OVERSIG…
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-09-30+$877,382$8,871,881IDIQAE TO PROVIDE AE SERVICES FOR SCHEMATIC DESIGN (SD) 2 FOR BLDGS 205 AND 208, VA WEST LOS ANGELES MEDICAL C…
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-14+$97,742$8,969,623IDIQAE TO MODIFICATION TO PROVIDE ADDITIONAL COMMISSIONING SERVICES NOT COVERED BY LEED COMMISSIONING FOR BLDG…
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-14+$70,343$9,039,966IDIQAE TO TO PROVIDE ADDITIONAL CONSTRUCTION PERIOD SERVICES FOR BLDG 209, VA WEST LOS ANGELES MEDICAL CENTER,…
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-31+$552,786$9,592,752FIFTY ADDITIONAL SITE VISITS DURING CONSTRUCTION PERIOD SERVICES FOR BUILDING 209.
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-26+$80,596$9,673,348B209 CPS 50 ADDITIONAL SITE VISITS.
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-26+$4,911$9,678,259B209 CPS 50 ADDITIONAL SITE VISITS.
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-03-19+$12,846$9,691,105B205 AND B208 SD2 ADDITIONAL PRINTING COSTS AND GBCI FEES.
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-06-24+$1,003,676$10,694,781B205 AND B208 SD2 DD DESIGN SERVICES.
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-14+$80,547$10,775,328B205 AND B208 SD2 DD DESIGN SERVICES, TO TAKE ADDITIONAL CONCRETE SAMPLES.
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-05+$98,724$10,874,052B205 AND B208 ELECTRICAL STUDY AND METERING SERVICES.
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-16+$11,829$10,885,882B205 AND B208 DD1 PEER REVIEW PRINTING AND DISTRIBUTION SERVICES.
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-30+$3,899,308$14,785,189IDIQAE TO PROVIDE AE SERVICES FOR SEISMIC AND FCA CORRECTIONS FOR BLDGS 156, 157 AND 258 AND DISPOSITION REPOR…
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-22+$9,727$14,794,916B205 AND B208 SD2 DD DESIGN SERVICES, TO TAKE ADDITIONAL CONCRETE SAMPLES AFTER HOURS.
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-26+$733,104$15,528,020B205 AND B208 CD DESIGN AWARD.
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-04+$60,154$15,588,174B205 AND B208 VARIOUS ADDITIONAL AE SERVICES. ELECTRICAL METERING, STORM DRAIN SYSTEM SURVEY, ADDITIONAL TOPOG…
Mod P00026· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2015-06-18+$62,636$15,650,810B205 AND B208 CD DESIGN AWARD.
Mod P00027· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2015-09-15+$86,366$15,737,176B205 AND B208 CD DESIGN AWARD.
Mod P00028· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2015-12-14+$30,783$15,767,958B205 AND B208 CD DESIGN AWARD.
Mod P00030· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2016-09-02−$5,323$15,762,635B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00029· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2016-09-21+$37,606$15,800,241B205 AND B208 CD DESIGN AWARD.
Mod P00031· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2017-10-17+$410,713$16,210,954B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00032· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2017-11-06+$577,742$16,788,696B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00033· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-01-16+$981,894$17,770,590B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00034· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-04-13+$2,396,584$20,167,174B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00035· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-04-18+$270,576$20,437,751B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00036· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-04-20+$392,385$20,830,136B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00037· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-05-02+$766,259$21,596,395B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00038· OTHER ADMINISTRATIVE ACTION2018-05-11+$0$21,596,395B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00039· FUNDING ONLY ACTION2018-09-26+$0$21,596,395B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00040· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-10-30+$400,580$21,996,974B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00042· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-05-07+$11,026$22,008,001B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00043· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-08-03+$529,770$22,537,771B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00041· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-08-08+$1,794,215$24,331,986B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P0045· OTHER ADMINISTRATIVE ACTION2020-07-16+$0$24,331,986B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00046· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-12-14+$529,770$24,861,756B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00047· OTHER ADMINISTRATIVE ACTION2021-10-01+$0$24,861,756B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00049· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-02-22+$1,734,981$26,596,737B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00051· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-06-10+$30,156$26,626,894B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00050· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-06-17+$7,390$26,634,284B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00053· OTHER ADMINISTRATIVE ACTION2022-09-16−$7,390$26,626,894B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00054· OTHER ADMINISTRATIVE ACTION2022-09-16+$7,390$26,634,284B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00055· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-12-27+$65,004$26,699,288B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00052· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2023-05-01+$2,675$26,701,963B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00056· CHANGE ORDER2023-05-26−$505,113$26,196,850B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00058· OTHER ADMINISTRATIVE ACTION2023-08-28−$1,573,314$24,623,536B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00057· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2024-06-13+$0$24,623,536B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00060· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2024-10-25+$0$24,623,536B205 AND B208 CD DESIGN AWARD. DEOBLIGATION OF EXCESS FUNDS.
Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-09-30−$813,482$23,810,053DEOBLIGATION OF DESIGN DEVELOPMENT AS REQUIREMENT IS REMOVED FROM SCOPE.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI K3ZVY8RLBSJ8)

AwardOffice · PSC / listingNet obligationsFY
36C10F24C0011OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$611,175FY2024
36C10F20C0012OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$6,484,310FY2020
VA26216J7764262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS$295,104FY2016
VA26216J7279262-NETWORK CONTRACT OFFICE 22 (36C262) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$10,000FY2016
VA101F16J2658OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$163,546FY2016
VA26216J3151262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$960,070FY2016

Other recipients under C215 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F25C50004ABOVE GROUP INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,083,926FY2025
36C10F24C50028BLUE TRIDENT, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,689,012FY2024
36C10F20N0089FFE ENVIRONMENTAL SERVICES INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$1,258,508FY2020
36C10F20N0062ALESIA ARCHITECTURE PCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$695,134FY2020
36C10F20N0020ALESIA ARCHITECTURE PCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$206,560FY2020

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMP0102_3600_-NONE-_-NONE- · retrieved 2026-09-26.