Description
THIS CONTRACT MODIFICATION IS TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FOR CONTINUED CONTRACT PERIOD SERVICES FOR PH E, CONTRACT VA101CFM-P-0088 MOD A00071, STOCKTON CBOC, CA.
Base award description: ARCHITECTURAL ENGINEERING SERVICES
Modification chain · 131 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-07-01+$5,025,355= $5,025,355
- Mod SA0012011-11-22+$19,939= $5,045,294
- Mod SA0022011-11-22+$50,378= $5,095,672
- Mod SA0032011-11-22+$58,561= $5,154,233
- Mod SA0052011-11-22+$43,815= $5,198,048
- Mod SA0092011-12-02+$0= $5,198,048
- Mod SA0062011-12-08+$41,655= $5,239,703
- Mod SA0042011-12-14+$85,481= $5,325,184
- Mod SA0072012-04-09+$48,016= $5,373,200
- Mod SA0082012-05-31+$4,854,050= $10,227,250
- Mod P000022013-04-23+$11,885= $10,239,135
- Mod P000012013-08-07+$8,356= $10,247,491
- Mod P000032013-08-07+$5,942= $10,253,433
- Mod P000042013-10-07+$26,326= $10,279,760
- Mod P000052014-02-26+$173,162= $10,452,922
- Mod P000062014-04-14+$0= $10,452,922
- Mod P000072014-05-12+$0= $10,452,922
- Mod P000082014-08-19+$450,985= $10,903,907
- Mod P000092014-10-07+$24,359= $10,928,266
- Mod P000102014-10-07+$28,584= $10,956,850
- Mod P000112014-11-17+$99,324= $11,056,174
- Mod P000122014-11-17+$90,000= $11,146,174
- Mod P000142014-12-29+$5,517= $11,151,691
- Mod P000132015-01-08+$90,000= $11,241,691
- Mod P000152015-03-30+$5,706,228= $16,947,919
- Mod P000162015-04-07+$95,000= $17,042,919
- Mod P000182015-08-03+$5,469= $17,048,388
- Mod P000202015-08-03+$84,668= $17,133,056
- Mod P000212015-08-05+$99,588= $17,232,644
- Mod P000192015-08-07+$237,258= $17,469,902
- Mod P000222015-08-10+$67,163= $17,537,065
- Mod P000172015-08-18+$0= $17,537,065
- Mod P000242015-09-17+$413,619= $17,950,684
- Mod P000232015-11-18+$29,864= $17,980,548
- Mod P000252015-12-14+$121,154= $18,101,702
- Mod P000262015-12-15+$132,788= $18,234,490
- Mod P000272015-12-21+$350,425= $18,584,915
- Mod P000292016-02-26+$95,000= $18,679,915
- Mod P000312016-06-07+$155,368= $18,835,283
- Mod P000302016-06-10+$281,572= $19,116,855
- Mod P000322016-08-29+$60,222= $19,177,077
- Mod P000332016-09-16+$177,513= $19,354,590
- Mod P000342016-10-04+$137,787= $19,492,377
- Mod P000352017-01-06+$11,732= $19,504,109
- Mod P000362017-01-17+$78,729= $19,582,838
- Mod P000372017-02-13+$18,662= $19,601,500
- Mod P000382017-02-13+$0= $19,601,500
- Mod P000392017-04-03+$0= $19,601,500
- Mod P000402017-05-15+$345,580= $19,947,080
- Mod P000412017-05-15+$215,713= $20,162,793
- Mod P000422017-05-17+$0= $20,162,793
- Mod P000432017-05-31+$136,387= $20,299,180
- Mod P000442017-05-31+$381,884= $20,681,064
- Mod P000452017-06-14+$0= $20,681,064
- Mod A000012017-09-01+$0= $20,681,064
- Mod A000022017-11-07+$47,700= $20,728,764
- Mod A000032017-11-07+$0= $20,728,764
- Mod A000042018-02-20+$7,400= $20,736,164
- Mod P000462018-02-23+$0= $20,736,164
- Mod A000052018-03-02+$56,625= $20,792,789
- Mod A000062018-04-09+$122,375= $20,915,164
- Mod A000092018-04-12+$21,467= $20,936,631
- Mod A000072018-04-16+$30,851= $20,967,482
- Mod A000082018-04-16+$12,968= $20,980,450
- Mod A000102018-04-24+$0= $20,980,450
- Mod A000112018-05-02+$6,679= $20,987,129
- Mod A000122018-05-04+$116,022= $21,103,151
- Mod A000132018-05-15+$40,880= $21,144,031
- Mod A000142018-05-15+$16,216= $21,160,247
- Mod A000152018-05-15+$25,628= $21,185,875
- Mod A000162018-06-11+$0= $21,185,875
- Mod A000172018-07-25+$0= $21,185,875
- Mod A000182018-08-15+$10,510= $21,196,385
- Mod A000192018-09-07+$7,354= $21,203,739
- Mod A000202018-09-25+$0= $21,203,739
- Mod A000212018-10-04+$30,880= $21,234,619
- Mod A000222018-10-04+$7,354= $21,241,974
- Mod A000232018-10-04+$16,756= $21,258,730
- Mod A000242018-10-04+$959= $21,259,689
- Mod A000252018-10-31-$24,799= $21,234,890
- Mod A000262018-11-06-$2,251= $21,232,638
- Mod A000272018-11-07-$5,056= $21,227,582
- Mod A000282018-11-07-$3,033= $21,224,549
- Mod A000292018-12-13+$6,710= $21,231,259
- Mod A000302018-12-19+$0= $21,231,259
- Mod A000312019-01-17+$24,248= $21,255,507
- Mod A000322019-02-04+$48,894= $21,304,401
- Mod A000332019-02-26+$36,687= $21,341,088
- Mod A000342019-02-26+$0= $21,341,088
- Mod A000352019-03-21+$38,591= $21,379,679
- Mod P000472019-05-09+$0= $21,379,679
- Mod A000372019-08-06+$96,311= $21,475,990
- Mod A000382019-10-07+$17,385= $21,493,375
- Mod A000392019-12-05+$113,037= $21,606,413
- Mod A000402019-12-06+$0= $21,606,413
- Mod A000412020-04-27+$50,961= $21,657,373
- Mod A000422020-06-16+$0= $21,657,373
- Mod A000432020-07-27+$258,658= $21,916,032
- Mod P000482020-11-10+$0= $21,916,032
- Mod A000442021-04-07+$165,905= $22,081,937
- Mod P000492021-09-27+$0= $22,081,937
- Mod A000452021-12-08+$527,051= $22,608,988
- Mod A000472022-08-08+$905,689= $23,514,677
- Mod A000462022-09-15-$28,678= $23,485,999
- Mod A000482023-05-17+$49,040= $23,535,039
- Mod A000492023-08-01+$600,477= $24,135,516
- Mod A000502023-08-14-$33,105= $24,102,411
- Mod A000512023-08-22+$0= $24,102,411
- Mod A000522023-09-14-$190,942= $23,911,469
- Mod P000502023-10-18-$97,503= $23,813,966
- Mod A000532023-12-21+$0= $23,813,966
- Mod A000542023-12-21+$0= $23,813,966
- Mod A000552024-01-31+$262,227= $24,076,193
- Mod A000562024-03-04+$20,255= $24,096,448
- Mod A000572024-03-04+$0= $24,096,448
- Mod A000582024-03-07-$40,510= $24,055,938
- Mod A000592024-04-24+$0= $24,055,938
- Mod A000602024-05-01+$989,335= $25,045,273
- Mod A000612024-05-08+$16,420= $25,061,693
- Mod A000622024-06-20+$242,821= $25,304,513
- Mod P000512024-07-10+$0= $25,304,513
- Mod A000632024-08-26+$0= $25,304,513
- Mod A000642025-01-14+$1,859,311= $27,163,824
- Mod A000652025-01-21+$3,850= $27,167,674
- Mod A000662025-03-18-$39,594= $27,128,081
- Mod A000672025-05-15-$161,957= $26,966,124
- Mod A000682025-07-14+$0= $26,966,124
- Mod A000692025-09-17+$3,368= $26,969,492
- Mod A000702026-04-17+$1,407,663= $28,377,154
- Mod A000712026-04-24+$0= $28,377,154
- Mod A000722026-08-06+$0= $28,377,154
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-07-01 | +$5,025,355 | $5,025,355 | ARCHITECTURAL ENGINEERING SERVICES |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$19,939 | $5,045,294 | CRITICAL FUNCTION: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CL… |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$50,378 | $5,095,672 | OTHER FUNCTION: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CLOSU… |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$58,561 | $5,154,233 | OTHER FUNCTIONS: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CLOS… |
| Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$43,815 | $5,198,048 | CRITICAL FUNCTION: PROVIDE ADDITIONAL PROGRAMMING/ VALIDATION MEETINGS FOR LIVERMORE REALIGNMENT AND CLOSURE… |
| Mod SA009· OTHER ADMINISTRATIVE ACTION | 2011-12-02 | +$0 | $5,198,048 | OTHER FUNCTIONS: ADMINISTRATIVE CHANGE TO CORRECT CLIN DOLLAR VALUE TO MATCH AGREED UPON OBLIGATED DOLLAR VALU… |
| Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$41,655 | $5,239,703 | OTHER FUNCTION: PROVIDE PROFESSIONAL VERTICAL TRANSPORT CONSULTANT SERVICES |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-14 | +$85,481 | $5,325,184 | CRITICAL FUNCTION: EXERCISES CLIN 21: FRENCH CAMP SITE PARKING AND TRAFFIC SURVEY AND CLIN 34: FREMONT SITE P… |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-09 | +$48,016 | $5,373,200 | CRITICAL FUNCTION: PROVIDE SCHEMATIC AND DESIGN DEVELOPMENT DOCUMENTS FOR PART A CLC, PART B CBOC AND PART C C… |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$4,854,050 | $10,227,250 | CRITICAL FUNCTION: EXERCISING OPTIONS FOR DD'S AND EXECUTIVE OVERVIEWS ON PART A CLC, PART B CBOC AND PART C C… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-23 | +$11,885 | $10,239,135 | ATTEND PACT MEETINGS ON APRIL 24-26 AS PART OF THE LIVERMORE REALIGNMENT PROJECT 640-423. |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$8,356 | $10,247,491 | SERVICES FOR LIFE CYCLE COST ANALYSIS FOR HOT WATER SYSTEMS FOR THE LIVERMORE REALIGNMENT AND CLOSURE, PROJECT… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$5,942 | $10,253,433 | MODIFICATION PROVIDES FOR PARTICIPATION IN PACT MEETINGS ON JANUARY 23 AND 24 TO DETERMINE COMPLIANCE WITH SD-… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-07 | +$26,326 | $10,279,760 | MODIFICATION PROVIDES FOR EFFORTS ASSOCIATED WITH PERFORMING A CO-GEN LIFE CYCLE COST ANALYSIS FOR THE FRENCH… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-26 | +$173,162 | $10,452,922 | MODIFICATION PROVIDES FOR EFFORTS ASSOCIATED WITH REDESIGN OF THE 2 COMMUNITY BASED OUTPATIENT CLINICS TO INTE… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-14 | +$0 | $10,452,922 | CRITICAL FUNCTION: CHANGE KEY PERSONNEL FOR FIVE POSITIONS. |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-12 | +$0 | $10,452,922 | CRITICAL FUNCTION: CHANGE KEY PERSONNEL FOR FIVE POSITIONS. |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-19 | +$450,985 | $10,903,907 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-07 | +$24,359 | $10,928,266 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-07 | +$28,584 | $10,956,850 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-17 | +$99,324 | $11,056,174 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-17 | +$90,000 | $11,146,174 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-29 | +$5,517 | $11,151,691 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-08 | +$90,000 | $11,241,691 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$5,706,228 | $16,947,919 | EXERCISE CD OPTIONS FOR PART A, B&C |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-07 | +$95,000 | $17,042,919 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-03 | +$5,469 | $17,048,388 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-03 | +$84,668 | $17,133,056 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-05 | +$99,588 | $17,232,644 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-07 | +$237,258 | $17,469,902 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-10 | +$67,163 | $17,537,065 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00017· OTHER ADMINISTRATIVE ACTION | 2015-08-18 | +$0 | $17,537,065 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$413,619 | $17,950,684 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$29,864 | $17,980,548 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$121,154 | $18,101,702 | CRITICAL FUNCTION: PROVIDE FOR CENTRAL HOT WATER SYSTEM FOR CBOC AND CLC IN CUP FOR THE LIVERMORE REALIGNMENT… |
| Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-15 | +$132,788 | $18,234,490 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-21 | +$350,425 | $18,584,915 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-26 | +$95,000 | $18,679,915 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-07 | +$155,368 | $18,835,283 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-10 | +$281,572 | $19,116,855 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$60,222 | $19,177,077 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-16 | +$177,513 | $19,354,590 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-04 | +$137,787 | $19,492,377 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIG… |
| Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-06 | +$11,732 | $19,504,109 | TO PAY FOR A TRIP TO MONTERREY VAMC FOR THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT… |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-17 | +$78,729 | $19,582,838 | PROFESSIONAL SERVICES TO ATTEND USACE PDRI AND CSRA REVIEW |
| Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-13 | +$18,662 | $19,601,500 | ADDITIONAL SERVICE FOR STOCKTON SURVEY CONVERSION ANALYSIS |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-13 | +$0 | $19,601,500 | REVISE ECCA |
| Mod P00039· OTHER ADMINISTRATIVE ACTION | 2017-04-03 | +$0 | $19,601,500 | US ARMY CORPS OF ENGINEERS IS DESIGNATED AS CONTRACT ADMINISTRATOR FOR DESIGN ACTIVITIES. |
| Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-15 | +$345,580 | $19,947,080 | CRITICAL FUNCTION: PROVIDE FOR BIM PREPAID OPTIONS FOR CLINS 3, 11 AND 24 FOR THE DESIGN DEVELOPMENT DOCUMENTS… |
| Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-15 | +$215,713 | $20,162,793 | CRITICAL FUNCTION: TO EXERCISE PREPRICED OPTION FOR CLIN 37 FOR THE CONSTRUCTION DOCUMENTS FOR THE ENGINEERING… |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-17 | +$0 | $20,162,793 | CRITICAL FUNCTION: PROVIDE CORRECTED ACCOUNTING DATA LINE FOR P00040 FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-31 | +$136,387 | $20,299,180 | REQUEST FOR EQUITABLE ADJUSTMENT FOR DD-2 ESCALATION FOR LABOR |
| Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-31 | +$381,884 | $20,681,064 | TO DEFINITIZE CHANGE ORDERS FOR OFF-SITE UTILITY WORK. |
| Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-14 | +$0 | $20,681,064 | SUPPLEMENTAL AGREEMENT ISSUED TO CORRECT FUNDING LINE OF P00043 ONLY. |
| Mod A00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-01 | +$0 | $20,681,064 | CHANGE ORDER TO PROVIDE NO COST USER (VAPAHCS) DESIRED CHANGES TO DESIGN. |
| Mod A00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-07 | +$47,700 | $20,728,764 | CHANGE ORDER TO PROVIDE USACE DIVISION 01 SPECIFICATIONS IN PLACE OF VA DIVISION 01 SPECIFICATIONS. |
| Mod A00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-07 | +$0 | $20,728,764 | ADMINISTRATIVE MODIFICATION TO CORRECT ACCOUNTING DATA AND OBLIGATION NUMBER. |
| Mod A00004· CHANGE ORDER | 2018-02-20 | +$7,400 | $20,736,164 | CHANGE ORDER FOR STOCKTON TRAFFIC STUDY (USACE). |
| Mod P00046· OTHER ADMINISTRATIVE ACTION | 2018-02-23 | +$0 | $20,736,164 | MODIFICATION TO EXTEND OBLIGATION END DATE. |
| Mod A00005· CHANGE ORDER | 2018-03-02 | +$56,625 | $20,792,789 | CHANGE ORDER FOR STOCKTON CBOC BLOOD BANK, RADIOLOGY OFFICE, AND PROSTHETICS PT/OT. |
| Mod A00006· CHANGE ORDER | 2018-04-09 | +$122,375 | $20,915,164 | CHANGE ORDER FOR STOCKTON CBOC BLOOD BANK, RADIOLOGY OFFICE, AND PROSTHETICS PT/OT. |
| Mod A00009· CHANGE ORDER | 2018-04-12 | +$21,467 | $20,936,631 | CHANGE ORDER FOR STOCKTON CBOC URINALYSIS LABORATORY. |
| Mod A00007· CHANGE ORDER | 2018-04-16 | +$30,851 | $20,967,482 | CHANGE ORDER FOR STOCKTON CBOC POLICE ROOM REDESIGN. |
| Mod A00008· CHANGE ORDER | 2018-04-16 | +$12,968 | $20,980,450 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR PBX VS. VOIP. |
| Mod A00010· CHANGE ORDER | 2018-04-24 | +$0 | $20,980,450 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR BLOOD BAND, RADIOLOGY AND PROSTHETICS. |
| Mod A00011· CHANGE ORDER | 2018-05-02 | +$6,679 | $20,987,129 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR INCREASED TRAFFIC STUDY. |
| Mod A00012· CHANGE ORDER | 2018-05-04 | +$116,022 | $21,103,151 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR DIVISION 01 SPECIFICATIONS, UPDATE AE COST ESTIMATE AND CRE… |
| Mod A00013· CHANGE ORDER | 2018-05-15 | +$40,880 | $21,144,031 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR POLICE OPERATIONS. |
| Mod A00014· CHANGE ORDER | 2018-05-15 | +$16,216 | $21,160,247 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR VOIP VS PBX. |
| Mod A00015· CHANGE ORDER | 2018-05-15 | +$25,628 | $21,185,875 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR VOIP VS PBX. |
| Mod A00016· CHANGE ORDER | 2018-06-11 | +$0 | $21,185,875 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO REVISE LABOR AND OVERHEAD RATES. |
| Mod A00017· CHANGE ORDER | 2018-07-25 | +$0 | $21,185,875 | CHANGE ORDER FOR LIVERMORE AE CONTRACT TO INCORPORATE UPDATED LABOR AND OVERHEAD RATED FOR PRIME AND CONSULTAN… |
| Mod A00018· CHANGE ORDER | 2018-08-15 | +$10,510 | $21,196,385 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO SATISFY USACE PEER REVIEW POLICY. |
| Mod A00019· CHANGE ORDER | 2018-09-07 | +$7,354 | $21,203,739 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO INCORPORATE CD-1 BCOES PEER REVIEW COMMENTS INTO CD-2 DOCUME… |
| Mod A00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-09-25 | +$0 | $21,203,739 | SUPPLEMENTAL AGREEMENT FOR RESOLUTION OF PEER REVIEW AND BCOES OUTSTANDING COMMENTS. |
| Mod A00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-04 | +$30,880 | $21,234,619 | SUPPLEMENTAL AGREEMENT FOR ADDED A/E SERVICES TO CONDUCT A SURVEY CONVERSION FROM NGVD29 TO NAVD88 AT FREMONT… |
| Mod A00022· CHANGE ORDER | 2018-10-04 | +$7,354 | $21,241,974 | CHANGE ORDER FOR A/E SERVICES TO PROVIDE INCREASED WORK TO INCORPORATE CD-2A REVISIONS FOR PART B CBOC |
| Mod A00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-04 | +$16,756 | $21,258,730 | SUPPLEMENTAL; AGREEMENT TO DEFINITIZE A00005, A00006 AND A00010 FOR BLOOD BANK, RADIOLOGY OFFICE AND PROSTHETI… |
| Mod A00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-04 | +$959 | $21,259,689 | SUPPLEMENTAL AGREEMENT TO DEFINITIZE MODS A00008 AND A00014FOR ADDITIONAL DESIGN SERVICES FOR PBX VS VOIP FOR… |
| Mod A00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-31 | −$24,799 | $21,234,890 | SUPPLEMENTAL AGREEMENT TO DEFINITIZE DIVISION 01 MODIFICATIONS A00002, A00003, AND A00012. |
| Mod A00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-06 | −$2,251 | $21,232,638 | SUPPLEMENTAL AGREEMENT TO ADDITIONAL TRAFFIC STUDY SERVICES FOR STOCKTON FACILITY. |
| Mod A00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-07 | −$5,056 | $21,227,582 | SUPPLEMENTAL AGREEMENT TO COMPLETE DESIGN SERVICES FOR POLICE OPS FOR THE STOCKTON CBOC, PART B. |
| Mod A00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-07 | −$3,033 | $21,224,549 | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL DESIGN FOR UNRINALYSIS LABORATORY FOR THE STOCKTON CBOC, PART B. |
| Mod A00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-13 | +$6,710 | $21,231,259 | SUPPLEMENTAL AGREEMENT TO REVISE CD DOCUMENTS FOR CD-2A FOR THE STOCKTON CBOC, PART B. |
| Mod A00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-19 | +$0 | $21,231,259 | SUPPLEMENTAL AGREEMENT TO REVISE CD DOCUMENTS FOR CD-2A FOR THE STOCKTON CBOC, PART B. |
| Mod A00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-17 | +$24,248 | $21,255,507 | SUPPLEMENTAL AGREEMENT TO PROVIDE CX SERVICES FOR THE CD PHASE OF THE ELB. |
| Mod A00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-02-04 | +$48,894 | $21,304,401 | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL SERVICES FOR THE TRAFFIC STUDY AT STOCKTON CAMPUS. |
| Mod A00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-02-26 | +$36,687 | $21,341,088 | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL SERVICES TO PROVIDE FOR PBX VS VOIP FOR STOCKTON PART A CLC, AND… |
| Mod A00034· OTHER ADMINISTRATIVE ACTION | 2019-02-26 | +$0 | $21,341,088 | ADMINSTRATIVE MODIFICATION TO CORRECT LOA FOR A00032. |
| Mod A00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-21 | +$38,591 | $21,379,679 | ADDITIONAL DESIGN SERVICES TO RESPOND TO DR. CHECKS COMMENTS FOR PART A, CLC AND PART E, ELB. |
| Mod P00047· OTHER ADMINISTRATIVE ACTION | 2019-05-09 | +$0 | $21,379,679 | ADMINISTRATIVE MODIFICATION TO REVISE THE COA FROM KIM FORD TO CAROLYN MALLORY. |
| Mod A00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-06 | +$96,311 | $21,475,990 | DESIGN SERVICES TO DELETE A CLC NEIGHBORHOOD. |
| Mod A00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-07 | +$17,385 | $21,493,375 | A/E SERVICES TO PROVIDE ADDITIONAL COMMENTS RESOLUTION FOR THE CD-2A FOR PART A CLC |
| Mod A00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-05 | +$113,037 | $21,606,413 | LIVERMORE OFFSITE UTILITIES REA. |
| Mod A00040· OTHER ADMINISTRATIVE ACTION | 2019-12-06 | +$0 | $21,606,413 | LIVERMORE OFFSITE UTILITIES REA ADMINISTRATIVE MODIFICATION TO CORRECT THE LOA. |
| Mod A00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-27 | +$50,961 | $21,657,373 | A/E SERVICES TO PROVIDE PHASE B EQUIPMENT UPDATE |
| Mod A00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-16 | +$0 | $21,657,373 | A/E SERVICES TO PROVIDE PHASE B CBOC EQUIPMENT LIST REVISED UPDATE |
| Mod A00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-07-27 | +$258,658 | $21,916,032 | A/E SERVICES TO PROVIDE REVIEW, EVALUATE AND RESOLVE 258 PEER REVIEW COMMENTS |
| Mod P00048· OTHER ADMINISTRATIVE ACTION | 2020-11-10 | +$0 | $21,916,032 | EXTEND OBLIGATION END DATE TO DECEMBER 31, 2022 |
| Mod A00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-04-07 | +$165,905 | $22,081,937 | A/E SERVICES TO PROVIDE FOR MANTHEY ROAD IMPROVEMENTS AND ASSOCIATED UTILITY WORK DESIGN |
| Mod P00049· FUNDING ONLY ACTION | 2021-09-27 | +$0 | $22,081,937 | FUNDING ACTION TO SWAP FIVE YEAR FUNDS FOR ZERO YEAR FUNDS. |
| Mod A00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-12-08 | +$527,051 | $22,608,988 | FREMONT SITE, PHASE C, UTILITIES RELOCATION |
| Mod A00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-08-08 | +$905,689 | $23,514,677 | PART A CLC DESIGN, CD-2A, CLINS 0001 THROUGH 0006AC |
| Mod A00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-09-15 | −$28,678 | $23,485,999 | DEOBLIGATION OF EXCESS FUNDS DUE TO THE DOWNSIZING OF PART C, FREMONT CBOC. |
| Mod A00048· EXERCISE AN OPTION | 2023-05-17 | +$49,040 | $23,535,039 | AWARD FOR OPTIONS 5AB, 5AC, 5AC AND 6AB. |
| Mod A00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-08-01 | +$600,477 | $24,135,516 | ADDITIONAL DESIGN FOR CLC |
| Mod A00050· FUNDING ONLY ACTION | 2023-08-14 | −$33,105 | $24,102,411 | THIS MODIFICATION ISSUED TO DELETE FUNDING FOR UNEXERCISED OPTIONS. |
| Mod A00051· OTHER ADMINISTRATIVE ACTION | 2023-08-22 | +$0 | $24,102,411 | ALAMEDA CBOC AND COLUMBARIUM DESIGN - TO DE-OBLIGATE EXCESS FUNDS. |
| Mod A00052· OTHER ADMINISTRATIVE ACTION | 2023-09-14 | −$190,942 | $23,911,469 | THIS MODIFICATION ISSUED TO DELETE FUNDING FOR UNEXERCISED OPTIONS. |
| Mod P00050· OTHER ADMINISTRATIVE ACTION | 2023-10-18 | −$97,503 | $23,813,966 | ADMINISTRATIVE MODIFICATION FOR THE DEOBLIGATION OF EXCESS FUNDS DUE TO THE DOWNSIZING OF PART C, FREMONT CBOC… |
| Mod A00053· OTHER ADMINISTRATIVE ACTION | 2023-12-21 | +$0 | $23,813,966 | ADMINISTRATIVE MODIFICATION FOR THE REPLACEMENT OF SOME KEY PERSONNEL. |
| Mod A00054· OTHER ADMINISTRATIVE ACTION | 2023-12-21 | +$0 | $23,813,966 | ADMINISTRATIVE MODIFICATION FOR THE CHANGE IN OH AND WAGE RATES. |
| Mod A00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-01-31 | +$262,227 | $24,076,193 | ADMINISTRATIVE MODIFICATION TO REPLY TO BIDDER INQUIRIES. |
| Mod A00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-03-04 | +$20,255 | $24,096,448 | TO DEOBLIGATE REFUND FOR FREMONT UNIVERSAL PLANNING APPLICATION. |
| Mod A00057· OTHER ADMINISTRATIVE ACTION | 2024-03-04 | +$0 | $24,096,448 | NO COST ADMINISTRATIVE MODIFICATION. |
| Mod A00058· OTHER ADMINISTRATIVE ACTION | 2024-03-07 | −$40,510 | $24,055,938 | TO DE-OBLIGATE REFUND FOR FREMONT UNIVERSAL PLANNING APPLICATION. ADMINISTRATIVE MOD TO DE-OBLIGATE FUNDS FRO… |
| Mod A00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-04-24 | +$0 | $24,055,938 | PHASE E CLINS 0001 THROUGH 0007, WITH OPTIONAL CLINS 0008 THROUGH 0012 |
| Mod A00060· FUNDING ONLY ACTION | 2024-05-01 | +$989,335 | $25,045,273 | TO FUND A00059 PHASE E CLINS 0001 THROUGH 0007, WITH OPTIONAL CLINS 0008 THROUGH 0012 |
| Mod A00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-05-08 | +$16,420 | $25,061,693 | TO AWARD THE REA FOR LM PHASE A,B,C,E AND STOCKTON MASTER SITE LEED FEES, AGREED UPON AMOUNT ON 29 APR 24. |
| Mod A00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-06-20 | +$242,821 | $25,304,513 | TO AWARD THE REA FOR LM PHASE A,B,C,D (E) PER 1/9/2024 AGREEMENT |
| Mod P00051· OTHER ADMINISTRATIVE ACTION | 2024-07-10 | +$0 | $25,304,513 | NEW ACO DESIGNATION AWARD. |
| Mod A00063· OTHER ADMINISTRATIVE ACTION | 2024-08-26 | +$0 | $25,304,513 | A/E SERVICES, THIS ADMINISTRATIVE MODIFICATION WILL CORRECT CLINS 0012AA - 0012AE: FROM: $48,440.37, TO: $9,68… |
| Mod A00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-01-14 | +$1,859,311 | $27,163,824 | LIVERMORE STOCKTON A/E SERVICES TO PHASE A, CLC CONSTRUCTION PERIOD |
| Mod A00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-01-21 | +$3,850 | $27,167,674 | LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYENT |
| Mod A00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-03-18 | −$39,594 | $27,128,081 | DEOBLIGATION OF FUNDS FOR LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYMENT |
| Mod A00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-05-15 | −$161,957 | $26,966,124 | DEOBLIGATION OF FUNDS FOR LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYMENT |
| Mod A00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-07-14 | +$0 | $26,966,124 | THIS MODIFICATION IS FOR BLAST PROTECTION CONSULTANT REPLACEMENT, LIVERMORE VAMC REALIGNMENT AND CLOSURE, CONT… |
| Mod A00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-09-17 | +$3,368 | $26,969,492 | THIS CONTRACT MODIFICATION IS TO PROVIDE CONSTRUCTION PERIOD SERVICES (CPS) FOR THE USGBC LEED PLAQUE FEES FOR… |
| Mod A00070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-04-17 | +$1,407,663 | $28,377,154 | THIS CONTRACT MODIFICATION IS TO PROVIDE ADDITIONAL CONSTRUCTION PERIOD SERVICES (CPS) FOR LIVERMORE PHASE A,… |
| Mod A00071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-04-24 | +$0 | $28,377,154 | THIS CONTRACT MODIFICATION IS TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FOR CONTINUED CONTRACT PERIOD SERVI… |
| Mod A00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-08-06 | +$0 | $28,377,154 | THIS CONTRACT MODIFICATION IS TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FOR CONTINUED CONTRACT PERIOD SERVI… |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under C211 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F24C0011 | LEO A. DALY LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $611,175 | FY2024 |
| 36C10F24C0006 | FOURFRONT DESIGN INC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $4,887,814 | FY2024 |
| 36C10F24F0023 | STELL SIA SALAS O'BRIEN LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $475,190 | FY2024 |
| 36C10F24F0024 | STELL SIA SALAS O'BRIEN LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $344,450 | FY2024 |
| 36C10F23F0009 | NAGEL SERVICES LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $5,316,810 | FY2023 |