Award recordCONTRACT

ZIMMER GUNSUL FRASCA ARCHITECTS LLP

PIID VA101CFMP0053· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C114 · HOSPITAL BUILDINGS· FY2009· $7,877,979 net obligations· UEI VN35SXAP4F44· OR

Description

THE PURPOSE OF THIS MODIFICATION IS TO CORRECT PROCESSED OBLIGATIONS THAT USED INCORRECT FUNDS WHEN FUNDING MODIFICATION A00007 FY16/20 TO FY25 NO YEAR FUNDS FOR A/E CONTRACT VA101CFM-P-0053 ZGF LLP, AE SERVICES NEW MENTAL HEALTH BUILDING 101

Base award description: A/E SERVICES NEW MENTAL HEALTH BUILDING 101, PARKING STRUCTURE AND CORRECTION OF SEISMIC DEFICIENCIES BUILDING 100

First action · last action
2009-08-31 · 2025-09-08
Transactions
48
First transaction's obligation
$1,688,721
Base + all options value (sum of deltas)
$9,116,306
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
1
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 48 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$7,877,979$0Base award · 2009-08-31 · this action $1,688,721 · running total $1,688,721Modification 1 · 2009-10-12 · this action $293,303 · running total $1,982,024Modification SA002 · 2010-03-18 · this action $76,630 · running total $2,058,654Modification SA003 · 2010-07-30 · this action $90,305 · running total $2,148,959Modification SA004 · 2010-07-30 · this action $57,440 · running total $2,206,399Modification SA005 · 2011-01-12 · this action $44,815 · running total $2,251,214Modification SA006 · 2011-01-12 · this action $24,296 · running total $2,275,510Modification SA007 · 2011-06-07 · this action $6,191 · running total $2,281,701Modification SA008 · 2012-03-13 · this action $245,736 · running total $2,527,437Modification SA009 · 2012-05-07 · this action $8,807 · running total $2,536,243Modification P00001 · 2012-11-28 · this action $1,431,363 · running total $3,967,606Modification P00002 · 2013-01-11 · this action $63,821 · running total $4,031,427Modification P00004 · 2013-01-23 · this action $0 · running total $4,031,427Modification P00005 · 2013-03-14 · this action $0 · running total $4,031,427Modification P00006 · 2013-03-25 · this action $11,430 · running total $4,042,857Modification P00007 · 2013-04-10 · this action $5,500 · running total $4,048,357Modification P00008 · 2013-08-16 · this action $37,925 · running total $4,086,282Modification P00010 · 2013-08-16 · this action $1,765 · running total $4,088,047Modification P00013 · 2015-10-23 · this action $0 · running total $4,088,047Modification P00014 · 2017-02-17 · this action $26,705 · running total $4,114,752Modification P00015 · 2017-04-13 · this action $111,687 · running total $4,226,439Modification P00016 · 2017-11-14 · this action $59,870 · running total $4,286,309Modification P00017 · 2018-06-07 · this action $0 · running total $4,286,309Modification P00018 · 2018-08-01 · this action $0 · running total $4,286,309Modification A00001 · 2018-10-02 · this action $49,524 · running total $4,335,833Modification A00002 · 2019-02-13 · this action $629,776 · running total $4,965,610Modification A00003 · 2019-02-25 · this action $0 · running total $4,965,610Modification A00004 · 2019-06-11 · this action $52,675 · running total $5,018,284Modification A00005 · 2019-06-25 · this action $63,082 · running total $5,081,366Modification A00006 · 2020-02-04 · this action $93,298 · running total $5,174,664Modification A00007 · 2020-07-22 · this action $1,118,562 · running total $6,293,226Modification P00019 · 2020-09-11 · this action $0 · running total $6,293,226Modification A00008 · 2021-08-11 · this action $392,889 · running total $6,686,115Modification A00009 · 2022-01-19 · this action $22,508 · running total $6,708,623Modification P00020 · 2022-02-08 · this action $0 · running total $6,708,623Modification A00010 · 2022-08-16 · this action $75,297 · running total $6,783,920Modification A00011 · 2023-01-18 · this action $350,348 · running total $7,134,268Modification A00012 · 2023-02-01 · this action $638,719 · running total $7,772,987Modification A00013 · 2024-02-15 · this action $0 · running total $7,772,987Modification A00014 · 2024-04-18 · this action $11,281 · running total $7,784,268Modification A00015 · 2024-04-30 · this action $0 · running total $7,784,268Modification A00016 · 2024-05-16 · this action $0 · running total $7,784,268Modification A00017 · 2024-07-01 · this action $0 · running total $7,784,268Modification A00018 · 2024-07-15 · this action $42,242 · running total $7,826,511Modification A00019 · 2025-03-13 · this action $0 · running total $7,826,511Modification P00022 · 2025-03-28 · this action $0 · running total $7,826,511Modification P00023 · 2025-04-14 · this action $0 · running total $7,826,511Modification P00024 · 2025-09-08 · this action $51,469 · running total $7,877,979
  • Base2009-08-31+$1,688,721= $1,688,721
  • Mod 12009-10-12+$293,303= $1,982,024
  • Mod SA0022010-03-18+$76,630= $2,058,654
  • Mod SA0032010-07-30+$90,305= $2,148,959
  • Mod SA0042010-07-30+$57,440= $2,206,399
  • Mod SA0052011-01-12+$44,815= $2,251,214
  • Mod SA0062011-01-12+$24,296= $2,275,510
  • Mod SA0072011-06-07+$6,191= $2,281,701
  • Mod SA0082012-03-13+$245,736= $2,527,437
  • Mod SA0092012-05-07+$8,807= $2,536,243
  • Mod P000012012-11-28+$1,431,363= $3,967,606
  • Mod P000022013-01-11+$63,821= $4,031,427
  • Mod P000042013-01-23+$0= $4,031,427
  • Mod P000052013-03-14+$0= $4,031,427
  • Mod P000062013-03-25+$11,430= $4,042,857
  • Mod P000072013-04-10+$5,500= $4,048,357
  • Mod P000082013-08-16+$37,925= $4,086,282
  • Mod P000102013-08-16+$1,765= $4,088,047
  • Mod P000132015-10-23+$0= $4,088,047
  • Mod P000142017-02-17+$26,705= $4,114,752
  • Mod P000152017-04-13+$111,687= $4,226,439
  • Mod P000162017-11-14+$59,870= $4,286,309
  • Mod P000172018-06-07+$0= $4,286,309
  • Mod P000182018-08-01+$0= $4,286,309
  • Mod A000012018-10-02+$49,524= $4,335,833
  • Mod A000022019-02-13+$629,776= $4,965,610
  • Mod A000032019-02-25+$0= $4,965,610
  • Mod A000042019-06-11+$52,675= $5,018,284
  • Mod A000052019-06-25+$63,082= $5,081,366
  • Mod A000062020-02-04+$93,298= $5,174,664
  • Mod A000072020-07-22+$1,118,562= $6,293,226
  • Mod P000192020-09-11+$0= $6,293,226
  • Mod A000082021-08-11+$392,889= $6,686,115
  • Mod A000092022-01-19+$22,508= $6,708,623
  • Mod P000202022-02-08+$0= $6,708,623
  • Mod A000102022-08-16+$75,297= $6,783,920
  • Mod A000112023-01-18+$350,348= $7,134,268
  • Mod A000122023-02-01+$638,719= $7,772,987
  • Mod A000132024-02-15+$0= $7,772,987
  • Mod A000142024-04-18+$11,281= $7,784,268
  • Mod A000152024-04-30+$0= $7,784,268
  • Mod A000162024-05-16+$0= $7,784,268
  • Mod A000172024-07-01+$0= $7,784,268
  • Mod A000182024-07-15+$42,242= $7,826,511
  • Mod A000192025-03-13+$0= $7,826,511
  • Mod P000222025-03-28+$0= $7,826,511
  • Mod P000232025-04-14+$0= $7,826,511
  • Mod P000242025-09-08+$51,469= $7,877,979
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-08-31+$1,688,721$1,688,721A/E SERVICES NEW MENTAL HEALTH BUILDING 101, PARKING STRUCTURE AND CORRECTION OF SEISMIC DEFICIENCIES BUILDING…
Mod 1· EXERCISE AN OPTION2009-10-12+$293,303$1,982,024LEED CERTIFICATION AND EXECUTIVE OVERVIEW
Mod SA002· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-03-18+$76,630$2,058,654DESIGN REVIEW IN VANCOUVER, WA AND SD-1 AND DD-1 LEVEL REVIEWS IN WASHINGTON, DC
Mod SA003· EXERCISE AN OPTION2010-07-30+$90,305$2,148,959LEED CERTIFICATION AND EXECUTIVE OVERVIEW
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-30+$57,440$2,206,399GENERAL CONDUCTIVITY TEST, ADDITIONAL SITE SURVEY SERVICES, ADDITIONAL SERVICES FOR EXPANDED SECTION 106 SERVI…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-12+$44,815$2,251,214TO HAVE THE A/E PROVIDE ADDITIONAL PROFESSIONAL DESIGN AND ENGINEERING SERVICES TO MEET ADDITIONAL BLAST AND P…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-12+$24,296$2,275,510TO HAVE THE A/E PROVIDE ADDITIONAL PROFESSIONALDESIGN SERVICES TO ADD NEEDED DESIGN AND ENGINEERING SERVICES R…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-07+$6,191$2,281,701TO PROCESS 3 INVOICES FOR REIMBURSEMENT OF TRAVEL EXPENSES
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-13+$245,736$2,527,437A/E SHALL PROVIDE PROFESSIONAL DESIGN SERVICES FOR RING ROAD/EXPANDED PARKING LOT, AS DETAILED ON ZGF DRAWING…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-07+$8,807$2,536,243EXTEND DD-2 SUBMITTAL DATE TO MAY 17, 2012, OR ADDITIONAL 33 DAYS. THE REVISED ECA IS $49,200,000 BASED ON CO…
Mod P00001· EXERCISE AN OPTION2012-11-28+$1,431,363$3,967,606THIS MODIFICATION IS TO: ADJUST DESIGN FEE FOR CONSTRUCTION DOCUMENTS, CONSTRUCTION PERIOD SERVICES AND SITE V…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-11+$63,821$4,031,427ADDED SERVICES FOR ADDITIONAL MAPPING, ELEVATOR AND LIGHTING CONSULTANTS, UPDATED CODES AND STANDARDS REVIEWS,…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-23+$0$4,031,427THIS IS TO ADD CLASS DEVIATION OF FAR CLAUSE 52.232-99, PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCON…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-14+$0$4,031,427THIS IS TO ADD VAAR CLAUSE 852.232-72, ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV. 2012) AND FAR CLAUSE 52…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-25+$11,430$4,042,857THIS MODIFICATION IS TO ESCALATE REMAINING LEED SERVICES FOR CONSTRUCTION DOCUMENTS AND CONSTRUCTION PERIOD SE…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-10+$5,500$4,048,357THIS MODIFICATION IS ADD AN LED LIGHTING STUDY TO SHOW THE COST AND ENERGY USE DIFFERENTIATION FOR SUBSTITUTIN…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-08-16+$37,925$4,086,282THIS MODIFICATION IS TO PROVIDE AN EXTENSION OF CD-1 SUBMISSION AND REVIEW DATES, AND TO IMPLEMENT ENDOSCOPY S…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-08-16+$1,765$4,088,047THIS MODIFICATION IS TO INCREASE THE CONTRACT AMOUNT FOR REIMBURSABLE TRAVEL EXPENSES IN ACCORDANCE WITH SPECI…
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-23+$0$4,088,047THIS ADMINISTRATIVE CHANGE IS TO UPDATE THE END OF PURCHASE ORDER NO. 663X90184 FROM AUGUST 31, 2014 TO SEPTEM…
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-02-17+$26,705$4,114,752THIS ADMINISTRATIVE CHANGE IS TO UPDATE THE END OF PURCHASE ORDER NO. 663X90184 FROM AUGUST 31, 2014 TO SEPTEM…
Mod P00015· CHANGE ORDER2017-04-13+$111,687$4,226,439THIS ADMINISTRATIVE CHANGE IS TO UPDATE THE END OF PURCHASE ORDER NO. 663X90184 FROM AUGUST 31, 2014 TO SEPTEM…
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-14+$59,870$4,286,309THIS SUPPLEMENTAL AGREEMENT IS FOR ADDITIONAL SERVICE TO PROVIDE LEED V4 SLIVER ANALYSIS AND REGISTER WITH US…
Mod P00017· OTHER ADMINISTRATIVE ACTION2018-06-07+$0$4,286,309THIS SUPPLEMENTAL AGREEMENT IS TO MEMORIALIZE NO COST TIME EXTENSION 12/06/2013 UNTIL 02/17/2017
Mod P00018· OTHER ADMINISTRATIVE ACTION2018-08-01+$0$4,286,309THIS MOD IS FOR ACO DELEGATION TO USACE
Mod A00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-02+$49,524$4,335,833THIS MOD IS EXECUTED FOR USACE FOR REQUIRED VE, ITR AND BCOES STUDY
Mod A00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-02-13+$629,776$4,965,610THIS MOD IS EXECUTED FOR USACE TO IMPLEMENT REQUIRED VE, ITR AND BCOES STUDY
Mod A00003· OTHER ADMINISTRATIVE ACTION2019-02-25+$0$4,965,610THIS MOD IS EXECUTED FOR USACE TO IMPLEMENT VA101CFM CORRECTIONS TO MODIFICATION'S A00001 AND A00002
Mod A00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-11+$52,675$5,018,284THIS MOD IS EXECUTED FOR USACE TO IMPLEMENT VA101CFM CORRECTIONS TO MODIFICATION'S A00001 AND A00002
Mod A00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-25+$63,082$5,081,366THIS MOD IS EXECUTED FOR USACE TO IMPLEMENT MOD NO. A00005 FOR VE STUDY AND REVIEW SUPPORT FOR CONTRACT NO. V…
Mod A00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-04+$93,298$5,174,664THIS MOD IS EXECUTED FOR USACE TO IMPLEMENT MOD NO. A00005 FOR VE STUDY AND REVIEW SUPPORT FOR CONTRACT NO. V…
Mod A00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-07-22+$1,118,562$6,293,226SUBMIT UPDATED DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENT, FINAL CD AND BID PACKAGE FOR CONTRACT NO. VA101CFM-P…
Mod P00019· OTHER ADMINISTRATIVE ACTION2020-09-11+$0$6,293,226THIS MOD IS EXECUTED FOR REVISED ACO DELEGATION TO USACE CONTRACT NO. VA101CFM-P-0053, PHASE 2, AM LAKE WA.
Mod A00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-08-11+$392,889$6,686,115ADDITIONAL PROFESSIONAL AE SERVICES IN SUPPORT OF USACE SITE DEVELOPMENT PACKAGE CONTRACT NO. VA101CFM-P-0053,…
Mod A00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-01-19+$22,508$6,708,623ELECTRICAL METERING - DETERMINE EXISTING ELECTRICAL LOAD AT THE VA AMERICAN LAKE CAMPUS, CONTRACT NO. VA101CFM…
Mod P00020· OTHER ADMINISTRATIVE ACTION2022-02-08+$0$6,708,623CHANGE LOA FROM 2019 TO 2012 FUND AT THE VA AMERICAN LAKE CAMPUS, CONTRACT NO. VA101CFM-P-0053, PHASE 2, AM LA…
Mod A00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-08-16+$75,297$6,783,920EQUITABLE ADJUSTMENT TO MOD A00008, PROJECT 663-403 PHASE 2, AMERICAN LAKE VAMC, WA.
Mod A00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-18+$350,348$7,134,268PH2A CONSTRUCTION PERIOD SERVICES UNDER CONTRACT NUMBER VA101CFMP-0053 FOR BLDG. 201, PROJECT 663-403 PHASE 2,…
Mod A00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-02-01+$638,719$7,772,987BILATERAL MODIFICATION NO. A00012 ?VA PH2B DESIGN CODE & CRITERIA REVIEW? PHASE 2 BLDG. 201 UNDER CONTRACT NUM…
Mod A00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-02-15+$0$7,772,987REALLOCATE FUNDS IN MOD A00011 AND EXTEND POP SEISMIC REPLACEMENT OF BUILDING 81, PROJECT NUMBER 663-403 VA PU…
Mod A00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-04-18+$11,281$7,784,268REALLOCATE FUNDS IN MOD A00011 AND EXTEND POP SEISMIC REPLACEMENT OF BUILDING 81, PROJECT NUMBER 663-403 VA PU…
Mod A00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-04-30+$0$7,784,268THE PURPOSE OF THIS NO-COST, BILATERAL MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) FOR MODIFICAT…
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-05-16+$0$7,784,268MODIFICATION A00016, EXTEND THE POP FOR MODIFICATION A00015 VA PH2A CONSTRUCTION PERIOD SERVICES PROJECT NUMBE…
Mod A00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-07-01+$0$7,784,268THE PURPOSE OF THIS NO-COST, BILATERAL MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) FOR MODIFICAT…
Mod A00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-07-15+$42,242$7,826,511THE PURPOSE OF THIS MODIFICATION A00018, VA PH2A REVISED SOW - CONSTRUCTION DOCUMENTS AND CONSTRUCTION PERIOD…
Mod A00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-03-13+$0$7,826,511THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FOR MODIFICATION A00017 VA PH2A CONSTRUCTION PERIOD SERV…
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-03-28+$0$7,826,511THE PURPOSE OF THIS MODIFICATION IS NOT TO PROCEED PHASE 2B A/E SERVICES NEW MENTAL HEALTH BUILDING 201
Mod P00023· OTHER ADMINISTRATIVE ACTION2025-04-14+$0$7,826,511THE PURPOSE OF THIS MODIFICATION IS THE CHANGE OF USACE ACO DELEGATION FOR A/E CONTRACT VA101CFM-P-0053 ZGF LL…
Mod P00024· OTHER ADMINISTRATIVE ACTION2025-09-08+$51,469$7,877,979THE PURPOSE OF THIS MODIFICATION IS TO CORRECT PROCESSED OBLIGATIONS THAT USED INCORRECT FUNDS WHEN FUNDING MO…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI VN35SXAP4F44)

AwardOffice · PSC / listingNet obligationsFY
VA101F14J0079OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$150,493FY2014
VA101F13J0222OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$6,772FY2013
VA101F13J0157OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$43,215FY2013
VA101F13J0143OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$55,017FY2013
VA101F13J0001OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$97,160FY2013
VA101CFMP0160OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$0FY2012

Other recipients under C114 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VATODEC05LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$1,261FY2018
VATOJUL07LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$188,468FY2016
VA101CFMP0148CANNON DESIGN, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,571FY2011
VACFM05C0095E B A ERNEST BLAND ASSOCIATES, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$53,624FY2011
V101BP0249N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$0FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMP0053_3600_-NONE-_-NONE- · retrieved 2026-09-26.