Award recordCONTRACT

GKKWORKS CONSTRUCTION SERVICES

PIID VA101CFMP0044· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C114 · HOSPITAL BUILDINGS· FY2009· $20,728,634 net obligations· UEI VMA9KU45CDZ3· CA

Description

EXTENSION FOR CPS SERVICES TO MARCH 31, 2026.

Base award description: AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA. SEISMIC SCI AND CLC.

First action · last action
2009-08-31 · 2026-04-16
Transactions
50
First transaction's obligation
$4,597,485
Base + all options value (sum of deltas)
$27,665,768
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
5
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 50 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$20,728,634$0Base award · 2009-08-31 · this action $4,597,485 · running total $4,597,485Modification SA001 · 2010-03-26 · this action $13,421 · running total $4,610,906Modification 2 · 2010-05-03 · this action $16,737 · running total $4,627,643Modification SA003 · 2010-06-29 · this action $64,205 · running total $4,691,848Modification SA004 · 2010-10-04 · this action $90,197 · running total $4,782,045Modification SA005 · 2010-11-30 · this action $39,399 · running total $4,821,444Modification SA006 · 2010-12-09 · this action $35,000 · running total $4,856,444Modification SA007 · 2011-02-08 · this action $19,000 · running total $4,875,444Modification SA008 · 2012-01-31 · this action $97,000 · running total $4,972,444Modification P00001 · 2013-06-11 · this action $6,762 · running total $4,979,206Modification P00002 · 2014-05-02 · this action $1,800 · running total $4,981,006Modification P00003 · 2014-09-30 · this action $5,000,000 · running total $9,981,006Modification P00004 · 2015-02-25 · this action $26,928 · running total $10,007,934Modification P00005 · 2015-04-02 · this action $16,500 · running total $10,024,434Modification P00006 · 2015-04-03 · this action $600,000 · running total $10,624,434Modification P00007 · 2015-04-15 · this action $200,000 · running total $10,824,434Modification P00008 · 2015-04-24 · this action $0 · running total $10,824,434Modification P00009 · 2015-05-07 · this action $700,000 · running total $11,524,434Modification P00010 · 2015-06-25 · this action $320,000 · running total $11,844,434Modification P00011 · 2015-10-26 · this action $200,000 · running total $12,044,434Modification P00012 · 2016-09-30 · this action $99,869 · running total $12,144,303Modification P00013 · 2017-08-25 · this action $213,254 · running total $12,357,557Modification A00002 · 2018-03-20 · this action $86,228 · running total $12,443,785Modification P00014 · 2018-05-01 · this action $0 · running total $12,443,785Modification P00015 · 2018-11-29 · this action $137,434 · running total $12,581,219Modification P00016 · 2019-06-05 · this action $90,000 · running total $12,671,219Modification P00017 · 2019-08-15 · this action $0 · running total $12,671,219Modification P00018 · 2021-03-12 · this action $169,099 · running total $12,840,318Modification P00019 · 2021-04-06 · this action $70,000 · running total $12,910,318Modification P00020 · 2021-04-21 · this action $200,200 · running total $13,110,518Modification P00021 · 2021-06-22 · this action $250,000 · running total $13,360,518Modification P00022 · 2021-08-19 · this action $75,103 · running total $13,435,621Modification P00023 · 2021-08-27 · this action $150,000 · running total $13,585,621Modification P00024 · 2021-09-15 · this action $4,405,024 · running total $17,990,645Modification P00025 · 2021-09-30 · this action $0 · running total $17,990,645Modification A00004 · 2022-06-30 · this action -$277,823 · running total $17,712,822Modification A00003 · 2022-08-15 · this action $130,981 · running total $17,843,803Modification P00026 · 2022-10-24 · this action $0 · running total $17,843,803Modification A00005 · 2023-05-01 · this action $36,654 · running total $17,880,457Modification A00006 · 2023-07-28 · this action $15,500 · running total $17,895,957Modification A00007 · 2023-07-28 · this action $68,454 · running total $17,964,411Modification A00008 · 2024-04-26 · this action $500,000 · running total $18,464,411Modification A00010 · 2024-07-18 · this action $725,045 · running total $19,189,456Modification A00011 · 2025-01-07 · this action $1,019,207 · running total $20,208,663Modification P00027 · 2025-06-05 · this action $0 · running total $20,208,663Modification A00012 · 2025-08-22 · this action $282,299 · running total $20,490,962Modification A00013 · 2025-09-15 · this action $158,448 · running total $20,649,410Modification A00014 · 2025-11-28 · this action $79,224 · running total $20,728,634Modification A00015 · 2026-04-16 · this action $0 · running total $20,728,634Modification A00016 · 2026-04-16 · this action $0 · running total $20,728,634
  • Base2009-08-31+$4,597,485= $4,597,485
  • Mod SA0012010-03-26+$13,421= $4,610,906
  • Mod 22010-05-03+$16,737= $4,627,643
  • Mod SA0032010-06-29+$64,205= $4,691,848
  • Mod SA0042010-10-04+$90,197= $4,782,045
  • Mod SA0052010-11-30+$39,399= $4,821,444
  • Mod SA0062010-12-09+$35,000= $4,856,444
  • Mod SA0072011-02-08+$19,000= $4,875,444
  • Mod SA0082012-01-31+$97,000= $4,972,444
  • Mod P000012013-06-11+$6,762= $4,979,206
  • Mod P000022014-05-02+$1,800= $4,981,006
  • Mod P000032014-09-30+$5,000,000= $9,981,006
  • Mod P000042015-02-25+$26,928= $10,007,934
  • Mod P000052015-04-02+$16,500= $10,024,434
  • Mod P000062015-04-03+$600,000= $10,624,434
  • Mod P000072015-04-15+$200,000= $10,824,434
  • Mod P000082015-04-24+$0= $10,824,434
  • Mod P000092015-05-07+$700,000= $11,524,434
  • Mod P000102015-06-25+$320,000= $11,844,434
  • Mod P000112015-10-26+$200,000= $12,044,434
  • Mod P000122016-09-30+$99,869= $12,144,303
  • Mod P000132017-08-25+$213,254= $12,357,557
  • Mod A000022018-03-20+$86,228= $12,443,785
  • Mod P000142018-05-01+$0= $12,443,785
  • Mod P000152018-11-29+$137,434= $12,581,219
  • Mod P000162019-06-05+$90,000= $12,671,219
  • Mod P000172019-08-15+$0= $12,671,219
  • Mod P000182021-03-12+$169,099= $12,840,318
  • Mod P000192021-04-06+$70,000= $12,910,318
  • Mod P000202021-04-21+$200,200= $13,110,518
  • Mod P000212021-06-22+$250,000= $13,360,518
  • Mod P000222021-08-19+$75,103= $13,435,621
  • Mod P000232021-08-27+$150,000= $13,585,621
  • Mod P000242021-09-15+$4,405,024= $17,990,645
  • Mod P000252021-09-30+$0= $17,990,645
  • Mod A000042022-06-30-$277,823= $17,712,822
  • Mod A000032022-08-15+$130,981= $17,843,803
  • Mod P000262022-10-24+$0= $17,843,803
  • Mod A000052023-05-01+$36,654= $17,880,457
  • Mod A000062023-07-28+$15,500= $17,895,957
  • Mod A000072023-07-28+$68,454= $17,964,411
  • Mod A000082024-04-26+$500,000= $18,464,411
  • Mod A000102024-07-18+$725,045= $19,189,456
  • Mod A000112025-01-07+$1,019,207= $20,208,663
  • Mod P000272025-06-05+$0= $20,208,663
  • Mod A000122025-08-22+$282,299= $20,490,962
  • Mod A000132025-09-15+$158,448= $20,649,410
  • Mod A000142025-11-28+$79,224= $20,728,634
  • Mod A000152026-04-16+$0= $20,728,634
  • Mod A000162026-04-16+$0= $20,728,634
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-08-31+$4,597,485$4,597,485AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA. SEISMIC SCI AND CLC.
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26+$13,421$4,610,906AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA.
Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-03+$16,737$4,627,643AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA. SA# 2 EMERGENCY POWER AND CHILLER STUDY
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-29+$64,205$4,691,848AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA.
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-04+$90,197$4,782,045AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA. SA# 2 EMERGENCY POWER AND CHILLER STUDY
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-30+$39,399$4,821,444TO HAVE THE A/E PROVIDE A BLAST CONSULTANT.
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-09+$35,000$4,856,444TO HAVE THE A/E PROVIDE A SPECIALTY LIGHTING CONSULTANT.
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-08+$19,000$4,875,444TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-31+$97,000$4,972,444TO HAVE AND A/E STUDY THE DESIGN IMPACT OF ADDING 5 BEDS TO THE LONG TERM SCI
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-11+$6,762$4,979,206AE CONTRACT FOR DESIGN SERVICES AT VAMC SAN DIEGO, CA. SEISMIC SCI AND CLC.
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-02+$1,800$4,981,006TO HAVE AND A/E STUDY THE DESIGN IMPACT OF ADDING 5 BEDS TO THE LONG TERM SCI
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-30+$5,000,000$9,981,006IGF:OT::IGF CHANGE ORDER FOR AE TO DESIGN VA SAN DIEGO MEDICAL CENTER NEW SPINAL CORD INJURY (SCI), COMMUNITY…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-25+$26,928$10,007,934TO HAVE THE A/E ADD COMMISSIONING SERVICES TO THE SOW
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-04-02+$16,500$10,024,434TO HAVE THE A/E ADD ATS ELECTRICAL TESTING SERVICES TO THE SOW
Mod P00006· CHANGE ORDER2015-04-03+$600,000$10,624,434IGF:OT::IGF CHANGE ORDER FOR AE TO DESIGN VA SAN DIEGO MEDICAL CENTER NEW SPINAL CORD INJURY (SCI), COMMUNITY…
Mod P00007· CHANGE ORDER2015-04-15+$200,000$10,824,434IGF:OT::IGF CHANGE ORDER FOR AE TO DESIGN VA SAN DIEGO MEDICAL CENTER NEW SPINAL CORD INJURY (SCI), COMMUNITY…
Mod P00008· CHANGE ORDER2015-04-24+$0$10,824,434IGF:OT::IGF CHANGE ORDER FOR AE TO DESIGN VA SAN DIEGO MEDICAL CENTER NEW SPINAL CORD INJURY (SCI), COMMUNITY…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-05-07+$700,000$11,524,434TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-06-25+$320,000$11,844,434TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-26+$200,000$12,044,434TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-09-30+$99,869$12,144,303TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-25+$213,254$12,357,557TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00002· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2018-03-20+$86,228$12,443,785TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00014· OTHER ADMINISTRATIVE ACTION2018-05-01+$0$12,443,785TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-11-29+$137,434$12,581,219TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00016· CHANGE ORDER2019-06-05+$90,000$12,671,219TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00017· CHANGE ORDER2019-08-15+$0$12,671,219TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00018· DEFINITIZE CHANGE ORDER2021-03-12+$169,099$12,840,318TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00019· CHANGE ORDER2021-04-06+$70,000$12,910,318TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00020· CHANGE ORDER2021-04-21+$200,200$13,110,518TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00021· CHANGE ORDER2021-06-22+$250,000$13,360,518TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00022· DEFINITIZE CHANGE ORDER2021-08-19+$75,103$13,435,621TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00023· CHANGE ORDER2021-08-27+$150,000$13,585,621TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00024· DEFINITIZE CHANGE ORDER2021-09-15+$4,405,024$17,990,645TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00025· ADD SUBCONTRACTING PLAN2021-09-30+$0$17,990,645TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00004· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-06-30−$277,823$17,712,822TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00003· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-08-15+$130,981$17,843,803TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00026· DEFINITIZE CHANGE ORDER2022-10-24+$0$17,843,803TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00005· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2023-05-01+$36,654$17,880,457TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00006· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2023-07-28+$15,500$17,895,957TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00007· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2023-07-28+$68,454$17,964,411TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00008· CHANGE ORDER2024-04-26+$500,000$18,464,411TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod A00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-07-18+$725,045$19,189,456TO DEFINITIZE NTE MOD A00008.
Mod A00011· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2025-01-07+$1,019,207$20,208,663TO HAVE AND A/E PROVIDE A POOL CONSULTANT.
Mod P00027· OTHER ADMINISTRATIVE ACTION2025-06-05+$0$20,208,663TO CORRECT EVERYTHING THAT WAS OUTLAID IN FY25 AND DE-OBLIGATE ALL INCORRECT FUNDING IN A UDO STATUS
Mod A00012· CHANGE ORDER2025-08-22+$282,299$20,490,962EXTENSION FOR CPS SERVICES.
Mod A00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-09-15+$158,448$20,649,410EXTENSION FOR CPS SERVICES TO NOVEMBER 30, 2025.
Mod A00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-11-28+$79,224$20,728,634EXTENSION FOR CPS SERVICES TO DECEMBER 31, 2025.
Mod A00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-04-16+$0$20,728,634EXTENSION FOR CPS SERVICES TO MARCH 31, 2026.
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-04-16+$0$20,728,634EXTENSION FOR CPS SERVICES TO MARCH 31, 2026.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI VMA9KU45CDZ3)

AwardOffice · PSC / listingNet obligationsFY
VA26216J0131262-NETWORK CONTRACT OFFICE 22 (36C262) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$0FY2016
VA26216P0107258-NETWORK CNTRCT OFF 22G (36C258) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$0FY2016
VA26216P0121262-NETWORK CONTRACT OFFICE 22 (36C262) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$70,000FY2016
VA26216P0013262-NETWORK CONTRACT OFFICE 22 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$77,267FY2016
VA26216P0014262-NETWORK CONTRACT OFFICE 22 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$43,138FY2016
VA26213J1526262-NETWORK CONTRACT OFFICE 22 · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS$129,893FY2013

Other recipients under C114 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VATODEC05LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$1,261FY2018
VATOJUL07LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$188,468FY2016
VA101CFMP0148CANNON DESIGN, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,571FY2011
VACFM05C0095E B A ERNEST BLAND ASSOCIATES, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$53,624FY2011
V101BP0249N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$0FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMP0044_3600_-NONE-_-NONE- · retrieved 2026-09-26.