Award recordCONTRACT

HELLMUTH, OBATA & KASSABAUM, INC.

PIID VA101CFMP0043· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C114 · HOSPITAL BUILDINGS· FY2009· $58,422,395 net obligations· UEI PX6CQE8DM8K3· CA

Description

EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052, A00055, A00056.

Base award description: AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA

First action · last action
2009-07-31 · 2026-09-04
Transactions
96
First transaction's obligation
$5,362,239
Base + all options value (sum of deltas)
$62,082,957
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
7
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 96 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$58,422,395$0Base award · 2009-07-31 · this action $5,362,239 · running total $5,362,239Modification SA001 · 2010-03-26 · this action $61,725 · running total $5,423,964Modification SA002 · 2010-03-26 · this action -$12,854 · running total $5,411,110Modification SA003 · 2010-03-26 · this action $10,400 · running total $5,421,510Modification SA004 · 2010-09-21 · this action $66,346 · running total $5,487,856Modification SA005 · 2010-10-04 · this action $57,500 · running total $5,545,356Modification SA006 · 2010-11-09 · this action $96,650 · running total $5,642,006Modification SA007 · 2010-11-09 · this action $14,140 · running total $5,656,146Modification CO01A · 2011-02-14 · this action $95,000 · running total $5,751,146Modification SA008 · 2011-11-14 · this action $646,331 · running total $6,397,477Modification P00001 · 2014-07-31 · this action $7,677,156 · running total $14,074,633Modification P00003 · 2014-12-10 · this action $126,464 · running total $14,201,097Modification P00004 · 2015-02-19 · this action $0 · running total $14,201,097Modification P00005 · 2015-03-30 · this action $20,016 · running total $14,221,113Modification P00006 · 2015-11-02 · this action $67,968 · running total $14,289,081Modification P00007 · 2015-12-04 · this action $27,907 · running total $14,316,988Modification P00008 · 2016-01-22 · this action $2,220 · running total $14,319,208Modification P00010 · 2016-02-19 · this action $77,255 · running total $14,396,463Modification P00009 · 2016-02-26 · this action $43,512 · running total $14,439,975Modification P00011 · 2016-03-21 · this action $54,887 · running total $14,494,862Modification P00012 · 2016-03-21 · this action $16,278 · running total $14,511,140Modification P00013 · 2016-06-23 · this action $15,343 · running total $14,526,483Modification P00014 · 2016-07-07 · this action $12,137 · running total $14,538,620Modification P00015 · 2016-07-29 · this action $276,497 · running total $14,815,117Modification P00016 · 2016-10-06 · this action $60,000 · running total $14,875,117Modification P00017 · 2016-10-06 · this action $67,000 · running total $14,942,117Modification P00018 · 2016-10-06 · this action $98,000 · running total $15,040,117Modification P00019 · 2017-03-10 · this action $46,238 · running total $15,086,355Modification P00020 · 2017-05-10 · this action $7,525 · running total $15,093,880Modification P00021 · 2017-05-14 · this action $121,497 · running total $15,215,377Modification P00022 · 2017-06-01 · this action $152,480 · running total $15,367,857Modification P00023 · 2017-06-01 · this action $16,410 · running total $15,384,267Modification P00024 · 2017-06-14 · this action $45,000 · running total $15,429,267Modification P00025 · 2017-08-08 · this action $65,717 · running total $15,494,984Modification P00026 · 2017-08-08 · this action $35,474 · running total $15,530,458Modification P00027 · 2018-02-07 · this action $0 · running total $15,530,458Modification A00004 · 2018-07-19 · this action $0 · running total $15,530,458Modification A00006 · 2018-08-28 · this action $0 · running total $15,530,458Modification A00007 · 2018-10-26 · this action $3,478,409 · running total $19,008,867Modification A00008 · 2018-11-28 · this action $969,959 · running total $19,978,826Modification P00029 · 2018-12-17 · this action $32,259 · running total $20,011,085Modification A00005 · 2019-03-12 · this action $70,402 · running total $20,081,487Modification A00002 · 2019-03-20 · this action $86,228 · running total $20,167,715Modification A00009 · 2019-05-07 · this action $319,628 · running total $20,487,343Modification A00010 · 2019-06-13 · this action $2,135,310 · running total $22,622,653Modification A00011 · 2019-06-13 · this action $119,021 · running total $22,741,674Modification A00013 · 2019-07-11 · this action $31,364 · running total $22,773,038Modification A00003 · 2019-07-19 · this action $8,156 · running total $22,781,194Modification A00014 · 2019-09-12 · this action $25,954 · running total $22,807,148Modification A00016 · 2019-12-17 · this action $219,478 · running total $23,026,626Modification A00015 · 2020-04-27 · this action $1,141,188 · running total $24,167,814Modification A00018 · 2020-06-18 · this action $34,432 · running total $24,202,246Modification A00019 · 2020-06-20 · this action $81,579 · running total $24,283,825Modification A00021 · 2020-06-30 · this action $3,786 · running total $24,287,611Modification A00020 · 2020-07-02 · this action $74,437 · running total $24,362,048Modification A00023 · 2020-08-24 · this action $16,476 · running total $24,378,524Modification A00024 · 2020-09-14 · this action $249,478 · running total $24,628,002Modification A00025 · 2020-11-03 · this action $130,891 · running total $24,758,893Modification P00030 · 2020-11-03 · this action $16,074 · running total $24,774,967Modification A00022 · 2020-12-03 · this action $58,667 · running total $24,833,634Modification A00012 · 2021-03-03 · this action $64,808 · running total $24,898,442Modification A00028 · 2021-04-27 · this action $95,752 · running total $24,994,194Modification A00029 · 2021-05-04 · this action $249,478 · running total $25,243,672Modification A00026 · 2021-05-14 · this action $51,420 · running total $25,295,092Modification A00027 · 2021-06-01 · this action $198,733 · running total $25,493,825Modification A00033 · 2021-06-28 · this action $99,505 · running total $25,593,330Modification A00031 · 2021-06-29 · this action $34,837 · running total $25,628,167Modification A00034 · 2021-08-10 · this action $21,617 · running total $25,649,784Modification A00037 · 2021-10-25 · this action $10,616 · running total $25,660,400Modification A00039 · 2022-01-06 · this action $122,185 · running total $25,782,585Modification A00040 · 2022-03-02 · this action $121,449 · running total $25,904,034Modification A00038 · 2022-07-19 · this action $84,000 · running total $25,988,034Modification A00036 · 2022-10-11 · this action $150,000 · running total $26,138,034Modification A00042 · 2022-12-09 · this action $31,300,632 · running total $57,438,666Modification A00043 · 2023-05-05 · this action $0 · running total $57,438,666Modification A00044 · 2023-08-31 · this action $31,506 · running total $57,470,172Modification A00045 · 2023-11-01 · this action $0 · running total $57,470,172Modification A00047 · 2023-11-16 · this action $0 · running total $57,470,172Modification A00048 · 2024-02-02 · this action $0 · running total $57,470,172Modification A00049 · 2024-03-14 · this action $0 · running total $57,470,172Modification A00050 · 2024-04-23 · this action $30,573 · running total $57,500,746Modification A00051 · 2024-06-20 · this action $0 · running total $57,500,746Modification A00052 · 2025-03-25 · this action $0 · running total $57,500,746Modification A00055 · 2025-04-14 · this action $0 · running total $57,500,746Modification A00056 · 2025-07-01 · this action $0 · running total $57,500,746Modification A00053 · 2026-02-03 · this action $40,869 · running total $57,541,615Modification A00054 · 2026-02-03 · this action $54,048 · running total $57,595,663Modification A00057 · 2026-02-03 · this action $43,615 · running total $57,639,278Modification A00058 · 2026-02-03 · this action $24,863 · running total $57,664,141Modification A00046 · 2026-02-12 · this action $140,143 · running total $57,804,284Modification A00059 · 2026-03-05 · this action $377,105 · running total $58,181,389Modification P00031 · 2026-03-09 · this action $31,506 · running total $58,212,895Modification A00060 · 2026-09-04 · this action $0 · running total $58,212,895Modification A00061 · 2026-09-04 · this action $0 · running total $58,212,895Modification A00062 · 2026-09-04 · this action $209,500 · running total $58,422,395Modification A00063 · 2026-09-04 · this action $0 · running total $58,422,395
  • Base2009-07-31+$5,362,239= $5,362,239
  • Mod SA0012010-03-26+$61,725= $5,423,964
  • Mod SA0022010-03-26-$12,854= $5,411,110
  • Mod SA0032010-03-26+$10,400= $5,421,510
  • Mod SA0042010-09-21+$66,346= $5,487,856
  • Mod SA0052010-10-04+$57,500= $5,545,356
  • Mod SA0062010-11-09+$96,650= $5,642,006
  • Mod SA0072010-11-09+$14,140= $5,656,146
  • Mod CO01A2011-02-14+$95,000= $5,751,146
  • Mod SA0082011-11-14+$646,331= $6,397,477
  • Mod P000012014-07-31+$7,677,156= $14,074,633
  • Mod P000032014-12-10+$126,464= $14,201,097
  • Mod P000042015-02-19+$0= $14,201,097
  • Mod P000052015-03-30+$20,016= $14,221,113
  • Mod P000062015-11-02+$67,968= $14,289,081
  • Mod P000072015-12-04+$27,907= $14,316,988
  • Mod P000082016-01-22+$2,220= $14,319,208
  • Mod P000102016-02-19+$77,255= $14,396,463
  • Mod P000092016-02-26+$43,512= $14,439,975
  • Mod P000112016-03-21+$54,887= $14,494,862
  • Mod P000122016-03-21+$16,278= $14,511,140
  • Mod P000132016-06-23+$15,343= $14,526,483
  • Mod P000142016-07-07+$12,137= $14,538,620
  • Mod P000152016-07-29+$276,497= $14,815,117
  • Mod P000162016-10-06+$60,000= $14,875,117
  • Mod P000172016-10-06+$67,000= $14,942,117
  • Mod P000182016-10-06+$98,000= $15,040,117
  • Mod P000192017-03-10+$46,238= $15,086,355
  • Mod P000202017-05-10+$7,525= $15,093,880
  • Mod P000212017-05-14+$121,497= $15,215,377
  • Mod P000222017-06-01+$152,480= $15,367,857
  • Mod P000232017-06-01+$16,410= $15,384,267
  • Mod P000242017-06-14+$45,000= $15,429,267
  • Mod P000252017-08-08+$65,717= $15,494,984
  • Mod P000262017-08-08+$35,474= $15,530,458
  • Mod P000272018-02-07+$0= $15,530,458
  • Mod A000042018-07-19+$0= $15,530,458
  • Mod A000062018-08-28+$0= $15,530,458
  • Mod A000072018-10-26+$3,478,409= $19,008,867
  • Mod A000082018-11-28+$969,959= $19,978,826
  • Mod P000292018-12-17+$32,259= $20,011,085
  • Mod A000052019-03-12+$70,402= $20,081,487
  • Mod A000022019-03-20+$86,228= $20,167,715
  • Mod A000092019-05-07+$319,628= $20,487,343
  • Mod A000102019-06-13+$2,135,310= $22,622,653
  • Mod A000112019-06-13+$119,021= $22,741,674
  • Mod A000132019-07-11+$31,364= $22,773,038
  • Mod A000032019-07-19+$8,156= $22,781,194
  • Mod A000142019-09-12+$25,954= $22,807,148
  • Mod A000162019-12-17+$219,478= $23,026,626
  • Mod A000152020-04-27+$1,141,188= $24,167,814
  • Mod A000182020-06-18+$34,432= $24,202,246
  • Mod A000192020-06-20+$81,579= $24,283,825
  • Mod A000212020-06-30+$3,786= $24,287,611
  • Mod A000202020-07-02+$74,437= $24,362,048
  • Mod A000232020-08-24+$16,476= $24,378,524
  • Mod A000242020-09-14+$249,478= $24,628,002
  • Mod A000252020-11-03+$130,891= $24,758,893
  • Mod P000302020-11-03+$16,074= $24,774,967
  • Mod A000222020-12-03+$58,667= $24,833,634
  • Mod A000122021-03-03+$64,808= $24,898,442
  • Mod A000282021-04-27+$95,752= $24,994,194
  • Mod A000292021-05-04+$249,478= $25,243,672
  • Mod A000262021-05-14+$51,420= $25,295,092
  • Mod A000272021-06-01+$198,733= $25,493,825
  • Mod A000332021-06-28+$99,505= $25,593,330
  • Mod A000312021-06-29+$34,837= $25,628,167
  • Mod A000342021-08-10+$21,617= $25,649,784
  • Mod A000372021-10-25+$10,616= $25,660,400
  • Mod A000392022-01-06+$122,185= $25,782,585
  • Mod A000402022-03-02+$121,449= $25,904,034
  • Mod A000382022-07-19+$84,000= $25,988,034
  • Mod A000362022-10-11+$150,000= $26,138,034
  • Mod A000422022-12-09+$31,300,632= $57,438,666
  • Mod A000432023-05-05+$0= $57,438,666
  • Mod A000442023-08-31+$31,506= $57,470,172
  • Mod A000452023-11-01+$0= $57,470,172
  • Mod A000472023-11-16+$0= $57,470,172
  • Mod A000482024-02-02+$0= $57,470,172
  • Mod A000492024-03-14+$0= $57,470,172
  • Mod A000502024-04-23+$30,573= $57,500,746
  • Mod A000512024-06-20+$0= $57,500,746
  • Mod A000522025-03-25+$0= $57,500,746
  • Mod A000552025-04-14+$0= $57,500,746
  • Mod A000562025-07-01+$0= $57,500,746
  • Mod A000532026-02-03+$40,869= $57,541,615
  • Mod A000542026-02-03+$54,048= $57,595,663
  • Mod A000572026-02-03+$43,615= $57,639,278
  • Mod A000582026-02-03+$24,863= $57,664,141
  • Mod A000462026-02-12+$140,143= $57,804,284
  • Mod A000592026-03-05+$377,105= $58,181,389
  • Mod P000312026-03-09+$31,506= $58,212,895
  • Mod A000602026-09-04+$0= $58,212,895
  • Mod A000612026-09-04+$0= $58,212,895
  • Mod A000622026-09-04+$209,500= $58,422,395
  • Mod A000632026-09-04+$0= $58,422,395
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-07-31+$5,362,239$5,362,239AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26+$61,725$5,423,964AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26−$12,854$5,411,110AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26+$10,400$5,421,510AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-21+$66,346$5,487,856AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-04+$57,500$5,545,356AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-09+$96,650$5,642,006NEW SITE LOCATION (WEST OF CAMPUS) FOR MENTAL HEALTH FACILITIES. AN ADDITIONAL 5 ACRES ADDED TO ORIGINAL SCOP…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-09+$14,140$5,656,146TO COMPLETE REQUIREMENT FOR BSO RECORDS.
Mod CO01A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-14+$95,000$5,751,146AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-14+$646,331$6,397,477AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-31+$7,677,156$14,074,633AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-12-10+$126,464$14,201,097AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1, COMMISSIONING SERVICES…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-19+$0$14,201,097AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-30+$20,016$14,221,113AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-11-02+$67,968$14,289,081AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-04+$27,907$14,316,988AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-01-22+$2,220$14,319,208AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-02-19+$77,255$14,396,463AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-02-26+$43,512$14,439,975AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-21+$54,887$14,494,862AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-21+$16,278$14,511,140AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-23+$15,343$14,526,483AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-07-07+$12,137$14,538,620AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-07-29+$276,497$14,815,117AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-06+$60,000$14,875,117AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-06+$67,000$14,942,117AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-06+$98,000$15,040,117AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-03-10+$46,238$15,086,355AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-10+$7,525$15,093,880AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-14+$121,497$15,215,377AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-01+$152,480$15,367,857AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-01+$16,410$15,384,267AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-14+$45,000$15,429,267AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-08+$65,717$15,494,984AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-08+$35,474$15,530,458AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-02-07+$0$15,530,458AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-07-19+$0$15,530,458AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-28+$0$15,530,458AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00007· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-10-26+$3,478,409$19,008,867AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00008· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2018-11-28+$969,959$19,978,826AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-12-17+$32,259$20,011,085AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00005· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-03-12+$70,402$20,081,487AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00002· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-03-20+$86,228$20,167,715AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00009· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-05-07+$319,628$20,487,343AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00010· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2019-06-13+$2,135,310$22,622,653AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00011· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2019-06-13+$119,021$22,741,674AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00013· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2019-07-11+$31,364$22,773,038AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00003· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2019-07-19+$8,156$22,781,194AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00014· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2019-09-12+$25,954$22,807,148AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00016· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2019-12-17+$219,478$23,026,626AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00015· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-04-27+$1,141,188$24,167,814AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00018· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-06-18+$34,432$24,202,246AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00019· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-06-20+$81,579$24,283,825AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00021· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-06-30+$3,786$24,287,611AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00020· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-07-02+$74,437$24,362,048AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00023· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-08-24+$16,476$24,378,524AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00024· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-09-14+$249,478$24,628,002AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00025· DEFINITIZE CHANGE ORDER2020-11-03+$130,891$24,758,893AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod P00030· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2020-11-03+$16,074$24,774,967AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-12-03+$58,667$24,833,634AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00012· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-03-03+$64,808$24,898,442AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN…
Mod A00028· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-04-27+$95,752$24,994,194AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00029· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-05-04+$249,478$25,243,672AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00026· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-05-14+$51,420$25,295,092AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00027· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-06-01+$198,733$25,493,825AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00033· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-06-28+$99,505$25,593,330AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00031· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-06-29+$34,837$25,628,167AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00034· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-08-10+$21,617$25,649,784AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00037· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2021-10-25+$10,616$25,660,400AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00039· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-01-06+$122,185$25,782,585AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00040· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2022-03-02+$121,449$25,904,034AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00038· DEFINITIZE CHANGE ORDER2022-07-19+$84,000$25,988,034AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00036· CHANGE ORDER2022-10-11+$150,000$26,138,034AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00042· CHANGE ORDER2022-12-09+$31,300,632$57,438,666AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-05-05+$0$57,438,666POP EXTENSION FOR GEOTECH SITE VISITS - AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLA…
Mod A00044· OTHER ADMINISTRATIVE ACTION2023-08-31+$31,506$57,470,172NOT TO EXCEED - EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE R…
Mod A00045· OTHER ADMINISTRATIVE ACTION2023-11-01+$0$57,470,172EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE.…
Mod A00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-11-16+$0$57,470,172EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE.…
Mod A00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-02-02+$0$57,470,172EXTENSION OF PERIOD OF PERFORMANCE TO 31 MAR 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND C…
Mod A00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-03-14+$0$57,470,172EXTENSION OF PERIOD OF PERFORMANCE TO 31 JUL 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CH…
Mod A00050· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED)2024-04-23+$30,573$57,500,746AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-06-20+$0$57,500,746EXTENSION OF PERIOD OF PERFORMANCE TO 30 NOV 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND C…
Mod A00052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-03-25+$0$57,500,746EXTENSION OF PERIOD OF PERFORMANCE TO 28 FEB 2025 - AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND C…
Mod A00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-04-14+$0$57,500,746EXTENSION OF PERIOD OF PERFORMANCE TO 30 JUN 2025. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CH…
Mod A00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-07-01+$0$57,500,746EXTENSION OF PERIOD OF PERFORMANCE FROM 30 JUN 2025 TO 30 SEP 2025. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL H…
Mod A00053· CHANGE ORDER2026-02-03+$40,869$57,541,615AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00054· CHANGE ORDER2026-02-03+$54,048$57,595,663AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00057· CHANGE ORDER2026-02-03+$43,615$57,639,278AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00058· CHANGE ORDER2026-02-03+$24,863$57,664,141AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-02-12+$140,143$57,804,284AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH,…
Mod A00059· CHANGE ORDER2026-03-05+$377,105$58,181,389EXTENSION OF CONSTRUCTION PHASE SERVICES FOR PARKING STRUCTURE. POP FOR CPS FOR PARKING STRUCTURE EXTENDED UNT…
Mod P00031· CHANGE ORDER2026-03-09+$31,506$58,212,895EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTAT…
Mod A00060· CHANGE ORDER2026-09-04+$0$58,212,895EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052,…
Mod A00061· CHANGE ORDER2026-09-04+$0$58,212,895EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052,…
Mod A00062· CHANGE ORDER2026-09-04+$209,500$58,422,395EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052,…
Mod A00063· CHANGE ORDER2026-09-04+$0$58,422,395EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052,…

Related awards · 8

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI PX6CQE8DM8K3)

AwardOffice · PSC / listingNet obligationsFY
36C26225C0285262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$37,653FY2025
36C26225C0290262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$38,551FY2025
VA26215C0144262-NETWORK CONTRACT OFFICE 22 · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL$1,571,118FY2015

Other recipients under C114 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VATODEC05LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$1,261FY2018
VATOJUL07LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$188,468FY2016
VA101CFMP0148CANNON DESIGN, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,571FY2011
VACFM05C0095E B A ERNEST BLAND ASSOCIATES, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$53,624FY2011
V101BP0249N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$0FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMP0043_3600_-NONE-_-NONE- · retrieved 2026-09-26.