Award recordCONTRACT

MANHATTAN CONSTRUCTION (FLORIDA) LLC

PIID VA101CFMC0058· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y142 · CONSTRUCT/LABORATORIES & CLINICS· FY2009· $59,250,565 net obligations· UEI CLMLAQA7UR59· FL

Description

SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS. THE A/E HAS PROVIDED DESIGN RECOMMENDATIONS TO ACHIEVE COMPLIANCE. THE VAMC HAS REQUESTED THAT THESE CHANGES AND MODIFICATIONS BE IMPLEMENTED ON AN EXPEDITED BASIS TO SUPPORT CLINIC OPENING AT YEAR-END. THE GENERAL CONTRACTOR HAS AGREED TO ACCEPT THE CONTRACT CHANGE ORDER TO PERFORM THE WORK.

Base award description: CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC

First action · last action
2009-09-25 · 2013-10-22
Transactions
362
First transaction's obligation
$53,144,925
Base + all options value (sum of deltas)
$59,260,579
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
10
SDVOSB flag on record
No
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 362 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$59,250,565$0Base award · 2009-09-25 · this action $53,144,925 · running total $53,144,925Modification CO01A · 2010-03-05 · this action $211,115 · running total $53,356,040Modification CO01B · 2010-03-31 · this action $6,738 · running total $53,362,778Modification SA001 · 2010-09-30 · this action $20,868 · running total $53,383,646Modification SA002 · 2010-09-30 · this action $43,598 · running total $53,427,244Modification SA003 · 2010-09-30 · this action $52,974 · running total $53,480,218Modification SA004 · 2010-09-30 · this action $38,216 · running total $53,518,434Modification SA005 · 2010-09-30 · this action $42,629 · running total $53,561,063Modification SA006 · 2010-09-30 · this action $18,660 · running total $53,579,723Modification SA007 · 2010-09-30 · this action $5,732 · running total $53,585,455Modification SA008 · 2010-09-30 · this action $5,621 · running total $53,591,076Modification SA009 · 2010-09-30 · this action $39,370 · running total $53,630,446Modification SA010 · 2010-09-30 · this action $39,774 · running total $53,670,220Modification SA011 · 2010-09-30 · this action $1,477 · running total $53,671,697Modification SA012 · 2010-09-30 · this action $88,454 · running total $53,760,151Modification SA013 · 2010-10-04 · this action $21,877 · running total $53,782,028Modification SA014 · 2010-10-06 · this action $50,531 · running total $53,832,559Modification SA015 · 2010-12-29 · this action $440 · running total $53,832,999Modification SA016 · 2010-12-29 · this action $20,000 · running total $53,852,999Modification SA017 · 2010-12-29 · this action $2,310 · running total $53,855,309Modification SA018 · 2010-12-29 · this action $3,134 · running total $53,858,443Modification SA020 · 2010-12-29 · this action $3,218 · running total $53,861,661Modification SA021 · 2010-12-29 · this action $9,468 · running total $53,871,129Modification SA022 · 2010-12-29 · this action $5,022 · running total $53,876,151Modification SA023 · 2010-12-29 · this action $18,692 · running total $53,894,843Modification SA024 · 2010-12-29 · this action $54,528 · running total $53,949,371Modification SA025 · 2010-12-29 · this action $7,645 · running total $53,957,016Modification SA027 · 2011-01-06 · this action $43,601 · running total $54,000,617Modification SA031 · 2011-02-06 · this action $10,484 · running total $54,011,101Modification SA032 · 2011-02-06 · this action $16,126 · running total $54,027,227Modification SA033 · 2011-02-06 · this action $2,769 · running total $54,029,996Modification SA039 · 2011-02-07 · this action $5,379 · running total $54,035,375Modification SA029 · 2011-02-20 · this action -$36,128 · running total $53,999,247Modification SA030 · 2011-02-20 · this action $3,189 · running total $54,002,436Modification SA040 · 2011-03-11 · this action $99,639 · running total $54,102,075Modification SA041 · 2011-03-11 · this action $5,192 · running total $54,107,267Modification SA046 · 2011-03-21 · this action $24,850 · running total $54,132,117Modification SA047 · 2011-03-21 · this action $20,781 · running total $54,152,898Modification SA042 · 2011-03-22 · this action $5,070 · running total $54,157,968Modification SA043 · 2011-03-22 · this action $4,131 · running total $54,162,099Modification SA059 · 2011-04-07 · this action $66,478 · running total $54,228,577Modification SA054 · 2011-04-08 · this action $8,506 · running total $54,237,083Modification SA055 · 2011-04-08 · this action $3,119 · running total $54,240,202Modification SA048 · 2011-04-11 · this action $35,674 · running total $54,275,876Modification SA060 · 2011-04-11 · this action $9,367 · running total $54,285,243Modification SA062 · 2011-04-11 · this action $71,351 · running total $54,356,594Modification CO01C · 2011-04-12 · this action $4,813 · running total $54,361,407Modification CO01D · 2011-04-12 · this action $2,445 · running total $54,363,852Modification CO01E · 2011-04-12 · this action $66,000 · running total $54,429,852Modification SA044 · 2011-04-13 · this action $35,053 · running total $54,464,905Modification SA049 · 2011-04-13 · this action $17,923 · running total $54,482,828Modification SA050 · 2011-04-13 · this action $11,821 · running total $54,494,649Modification SA051 · 2011-04-13 · this action $28,912 · running total $54,523,561Modification SA052 · 2011-04-13 · this action $9,834 · running total $54,533,395Modification SA053 · 2011-04-13 · this action $6,688 · running total $54,540,083Modification SA061 · 2011-04-14 · this action $4,392 · running total $54,544,475Modification SA063 · 2011-04-14 · this action $1,982 · running total $54,546,457Modification SA064 · 2011-04-14 · this action $6,266 · running total $54,552,723Modification SA056 · 2011-05-03 · this action $32,805 · running total $54,585,528Modification SA057 · 2011-05-03 · this action $70,775 · running total $54,656,303Modification SA058 · 2011-05-03 · this action $4,321 · running total $54,660,624Modification SA065 · 2011-05-03 · this action $13,050 · running total $54,673,674Modification SA066 · 2011-05-03 · this action $3,991 · running total $54,677,665Modification SA067 · 2011-05-03 · this action $3,698 · running total $54,681,363Modification SA068 · 2011-05-09 · this action $4,925 · running total $54,686,288Modification SA069 · 2011-05-09 · this action $14,000 · running total $54,700,288Modification SA070 · 2011-05-09 · this action $8,320 · running total $54,708,608Modification SA071 · 2011-05-09 · this action $44,825 · running total $54,753,433Modification SA072 · 2011-05-09 · this action $1,308 · running total $54,754,741Modification SA026 · 2011-05-10 · this action $64,063 · running total $54,818,804Modification SA038 · 2011-05-10 · this action $938 · running total $54,819,742Modification SA045 · 2011-05-10 · this action $13,408 · running total $54,833,150Modification SA028 · 2011-05-18 · this action $1,317 · running total $54,834,467Modification SA081 · 2011-07-20 · this action $20,900 · running total $54,855,367Modification SA083 · 2011-07-20 · this action $36,321 · running total $54,891,688Modification SA086 · 2011-07-20 · this action $14,717 · running total $54,906,405Modification SA087 · 2011-07-20 · this action $22,733 · running total $54,929,138Modification SA089 · 2011-07-20 · this action $31,514 · running total $54,960,652Modification SA091 · 2011-07-20 · this action $385 · running total $54,961,037Modification SA092 · 2011-07-20 · this action $5,333 · running total $54,966,370Modification SA093 · 2011-07-20 · this action $1,711 · running total $54,968,081Modification SA094 · 2011-07-20 · this action $385 · running total $54,968,466Modification SA095 · 2011-07-20 · this action $5,749 · running total $54,974,215Modification SA096 · 2011-07-20 · this action $10,654 · running total $54,984,869Modification SA098 · 2011-07-20 · this action $22,439 · running total $55,007,308Modification SA099 · 2011-07-20 · this action $8,900 · running total $55,016,208Modification SA100 · 2011-07-20 · this action $2,074 · running total $55,018,282Modification SA101 · 2011-07-20 · this action $1,715 · running total $55,019,997Modification SA102 · 2011-07-20 · this action $5,900 · running total $55,025,897Modification SA103 · 2011-07-20 · this action $25,036 · running total $55,050,933Modification CO01F · 2011-07-25 · this action $97,079 · running total $55,148,012Modification SA097 · 2011-07-25 · this action $604 · running total $55,148,616Modification SA104 · 2011-07-25 · this action $4,069 · running total $55,152,685Modification SA105 · 2011-07-25 · this action $18,931 · running total $55,171,616Modification SA106 · 2011-07-25 · this action $8,091 · running total $55,179,707Modification SA107 · 2011-07-25 · this action $9,532 · running total $55,189,239Modification SA108 · 2011-07-25 · this action $20,540 · running total $55,209,779Modification SA109 · 2011-07-25 · this action $1,867 · running total $55,211,646Modification SA110 · 2011-07-25 · this action $7,432 · running total $55,219,078Modification SA111 · 2011-07-25 · this action $2,305 · running total $55,221,383Modification SA112 · 2011-07-25 · this action $1,419 · running total $55,222,802Modification SA113 · 2011-07-25 · this action $72,295 · running total $55,295,097Modification SA114 · 2011-07-25 · this action $47,429 · running total $55,342,526Modification SA115 · 2011-07-25 · this action $11,509 · running total $55,354,035Modification SA118 · 2011-07-25 · this action $10,521 · running total $55,364,556Modification SA120 · 2011-07-25 · this action $30,279 · running total $55,394,835Modification SA119 · 2011-07-26 · this action $39,289 · running total $55,434,124Modification SA130 · 2011-08-16 · this action $4,840 · running total $55,438,964Modification SA131 · 2011-08-16 · this action $11,334 · running total $55,450,298Modification SA132 · 2011-08-16 · this action $25,021 · running total $55,475,319Modification SA133 · 2011-08-16 · this action $2,124 · running total $55,477,443Modification SA134 · 2011-08-16 · this action $21,322 · running total $55,498,765Modification SA135 · 2011-08-16 · this action $2,821 · running total $55,501,586Modification SA136 · 2011-08-16 · this action $17,024 · running total $55,518,610Modification SA137 · 2011-08-16 · this action $12,222 · running total $55,530,832Modification SA138 · 2011-08-16 · this action $3,000 · running total $55,533,832Modification SA139 · 2011-08-16 · this action $12,848 · running total $55,546,680Modification SA079 · 2011-08-17 · this action $385 · running total $55,547,065Modification SA080 · 2011-08-17 · this action $20,723 · running total $55,567,788Modification SA084 · 2011-08-17 · this action $2,353 · running total $55,570,141Modification SA085 · 2011-08-17 · this action $2,818 · running total $55,572,959Modification SA088 · 2011-08-17 · this action $1,382 · running total $55,574,341Modification SA090 · 2011-08-17 · this action $6,332 · running total $55,580,673Modification SA122 · 2011-08-23 · this action $4,285 · running total $55,584,958Modification SA123 · 2011-08-23 · this action $98,118 · running total $55,683,076Modification SA124 · 2011-08-23 · this action $8,000 · running total $55,691,076Modification SA142 · 2011-08-30 · this action $87,975 · running total $55,779,051Modification SA144 · 2011-08-30 · this action $13,031 · running total $55,792,082Modification SA145 · 2011-08-30 · this action $10,332 · running total $55,802,414Modification SA146 · 2011-08-30 · this action $7,350 · running total $55,809,764Modification SA147 · 2011-08-30 · this action $1,460 · running total $55,811,224Modification SA148 · 2011-08-30 · this action $14,042 · running total $55,825,266Modification CO01G · 2011-09-06 · this action $33,962 · running total $55,859,228Modification CO01H · 2011-09-06 · this action $11,550 · running total $55,870,778Modification SA121 · 2011-09-06 · this action $5,817 · running total $55,876,595Modification SA125 · 2011-09-06 · this action $9,492 · running total $55,886,087Modification SA127 · 2011-09-06 · this action -$37,636 · running total $55,848,451Modification SA128 · 2011-09-06 · this action $7,581 · running total $55,856,032Modification SA129 · 2011-09-06 · this action $50,776 · running total $55,906,808Modification SA140 · 2011-09-06 · this action $2,694 · running total $55,909,502Modification SA019 · 2011-09-12 · this action $22,086 · running total $55,931,588Modification SA034 · 2011-09-12 · this action $15,825 · running total $55,947,413Modification SA035 · 2011-09-12 · this action $16,350 · running total $55,963,763Modification SA036 · 2011-09-12 · this action -$13,237 · running total $55,950,526Modification SA037 · 2011-09-12 · this action $15,289 · running total $55,965,815Modification SA073 · 2011-09-12 · this action $12,047 · running total $55,977,862Modification SA074 · 2011-09-12 · this action $3,740 · running total $55,981,602Modification SA075 · 2011-09-12 · this action $8,628 · running total $55,990,230Modification SA076 · 2011-09-12 · this action $9,183 · running total $55,999,413Modification SA077 · 2011-09-12 · this action $1,500 · running total $56,000,913Modification SA082 · 2011-09-12 · this action $33,782 · running total $56,034,695Modification SA117 · 2011-09-12 · this action $34,257 · running total $56,068,952Modification SA126 · 2011-09-12 · this action $1,746 · running total $56,070,698Modification SA141 · 2011-09-12 · this action $27,314 · running total $56,098,012Modification SA151 · 2011-09-12 · this action $56,661 · running total $56,154,673Modification SA152 · 2011-09-12 · this action $21,915 · running total $56,176,588Modification SA153 · 2011-09-12 · this action $5,508 · running total $56,182,096Modification SA154 · 2011-09-12 · this action -$37,547 · running total $56,144,549Modification SA156 · 2011-09-12 · this action $86,071 · running total $56,230,620Modification SA157 · 2011-09-12 · this action $3,388 · running total $56,234,008Modification SA158 · 2011-09-12 · this action $36,186 · running total $56,270,194Modification SA159 · 2011-09-12 · this action $6,229 · running total $56,276,423Modification SA160 · 2011-09-12 · this action $92,713 · running total $56,369,136Modification SA161 · 2011-09-12 · this action $4,822 · running total $56,373,958Modification SA162 · 2011-09-12 · this action $5,017 · running total $56,378,975Modification SA164 · 2011-09-23 · this action $14,640 · running total $56,393,615Modification SA168 · 2011-09-23 · this action $1,782 · running total $56,395,397Modification SA169 · 2011-10-06 · this action $8,726 · running total $56,404,123Modification SA170 · 2011-10-06 · this action $21,094 · running total $56,425,217Modification SA176 · 2011-10-06 · this action $35,458 · running total $56,460,675Modification SA171 · 2011-10-07 · this action $10,996 · running total $56,471,671Modification SA172 · 2011-10-07 · this action $14,670 · running total $56,486,341Modification SA173 · 2011-10-07 · this action $19,713 · running total $56,506,054Modification SA174 · 2011-10-07 · this action $10,918 · running total $56,516,972Modification SA175 · 2011-10-07 · this action $15,457 · running total $56,532,429Modification SA177 · 2011-10-11 · this action $9,877 · running total $56,542,306Modification SA178 · 2011-10-11 · this action $15,638 · running total $56,557,944Modification SA116 · 2011-10-14 · this action -$275,000 · running total $56,282,944Modification SA166 · 2011-10-24 · this action $6,557 · running total $56,289,501Modification SA149 · 2011-10-25 · this action $15,083 · running total $56,304,584Modification SA150 · 2011-10-25 · this action $16,295 · running total $56,320,879Modification SA163 · 2011-10-25 · this action $31,874 · running total $56,352,753Modification SA179 · 2011-10-25 · this action $59,050 · running total $56,411,803Modification SA180 · 2011-11-01 · this action $52,051 · running total $56,463,854Modification SA181 · 2011-11-01 · this action $54,254 · running total $56,518,108Modification SA078 · 2011-12-08 · this action $25,000 · running total $56,543,108Modification SA167 · 2011-12-08 · this action $27,579 · running total $56,570,687Modification CO01J · 2011-12-14 · this action $50,000 · running total $56,620,687Modification CO01L · 2011-12-14 · this action $15,000 · running total $56,635,687Modification CO01O · 2011-12-20 · this action $1,129 · running total $56,636,816Modification SA155 · 2011-12-23 · this action $205,569 · running total $56,842,385Modification SA165 · 2011-12-28 · this action $23,457 · running total $56,865,842Modification CO01I · 2012-01-03 · this action $95,424 · running total $56,961,266Modification SA182 · 2012-01-03 · this action $10,825 · running total $56,972,091Modification CO01M · 2012-01-16 · this action $35,000 · running total $57,007,091Modification CO01N · 2012-01-16 · this action $40,000 · running total $57,047,091Modification SA183 · 2012-01-16 · this action $14,440 · running total $57,061,531Modification CO01K · 2012-01-20 · this action -$49,033 · running total $57,012,498Modification CO01P · 2012-01-20 · this action $3,421 · running total $57,015,919Modification CO01Q · 2012-01-20 · this action $11,227 · running total $57,027,146Modification CO01R · 2012-01-20 · this action $12,538 · running total $57,039,684Modification CO01S · 2012-02-03 · this action $1,841 · running total $57,041,525Modification CO01T · 2012-02-13 · this action $20,459 · running total $57,061,984Modification CO01U · 2012-02-17 · this action $3,780 · running total $57,065,764Modification CO01V · 2012-02-17 · this action $1,898 · running total $57,067,662Modification CO01W · 2012-02-17 · this action $17,560 · running total $57,085,222Modification CO01X · 2012-02-17 · this action $25,454 · running total $57,110,676Modification CO01Y · 2012-02-17 · this action $5,265 · running total $57,115,941Modification CO01Z · 2012-02-17 · this action $3,646 · running total $57,119,587Modification CO02A · 2012-02-17 · this action $3,569 · running total $57,123,156Modification SA184 · 2012-02-17 · this action $4,964 · running total $57,128,120Modification SA185 · 2012-02-17 · this action $1,802 · running total $57,129,922Modification SA143 · 2012-02-29 · this action $73,709 · running total $57,203,631Modification SA186 · 2012-02-29 · this action $8,408 · running total $57,212,039Modification SA187 · 2012-02-29 · this action $59,947 · running total $57,271,986Modification CO02B · 2012-03-06 · this action $2,910 · running total $57,274,896Modification SA188 · 2012-03-07 · this action $46,475 · running total $57,321,371Modification SA189 · 2012-03-08 · this action $7,641 · running total $57,329,012Modification SA190 · 2012-03-08 · this action $79,589 · running total $57,408,601Modification SA191 · 2012-03-08 · this action $2,068 · running total $57,410,669Modification SA192 · 2012-03-08 · this action $56,832 · running total $57,467,501Modification SA193 · 2012-03-08 · this action $1,994 · running total $57,469,495Modification SA194 · 2012-03-08 · this action $3,185 · running total $57,472,680Modification CO02C · 2012-04-11 · this action $19,984 · running total $57,492,664Modification SA196 · 2012-04-11 · this action $6,021 · running total $57,498,685Modification CO02E · 2012-04-12 · this action $4,939 · running total $57,503,624Modification CO02D · 2012-04-16 · this action $19,297 · running total $57,522,921Modification CO02F · 2012-04-18 · this action $40,689 · running total $57,563,610Modification CO02G · 2012-04-18 · this action $14,138 · running total $57,577,748Modification CO02H · 2012-04-24 · this action $9,220 · running total $57,586,968Modification CO02I · 2012-04-24 · this action $19,844 · running total $57,606,812Modification CO02J · 2012-04-24 · this action $16,959 · running total $57,623,771Modification CO02K · 2012-04-24 · this action $15,027 · running total $57,638,798Modification CO02L · 2012-04-24 · this action $8,246 · running total $57,647,044Modification CO02M · 2012-04-24 · this action $15,065 · running total $57,662,109Modification SA198 · 2012-05-14 · this action $9,005 · running total $57,671,114Modification SA195 · 2012-05-16 · this action $3,691 · running total $57,674,805Modification SA197 · 2012-05-16 · this action $7,814 · running total $57,682,619Modification CO02N · 2012-05-24 · this action $11,061 · running total $57,693,680Modification CO02O · 2012-05-24 · this action $8,075 · running total $57,701,755Modification CO02P · 2012-05-25 · this action $3,914 · running total $57,705,669Modification SA199 · 2012-05-31 · this action $385 · running total $57,706,054Modification CO02Q · 2012-06-11 · this action $2,054 · running total $57,708,108Modification SA200 · 2012-06-19 · this action $4,569 · running total $57,712,677Modification SA201 · 2012-06-19 · this action $17,339 · running total $57,730,016Modification SA204 · 2012-06-19 · this action $298 · running total $57,730,314Modification SA205 · 2012-06-19 · this action $4,525 · running total $57,734,839Modification SA206 · 2012-06-19 · this action $1,080 · running total $57,735,919Modification SA207 · 2012-06-19 · this action $2,841 · running total $57,738,760Modification SA203 · 2012-06-20 · this action $1,586 · running total $57,740,346Modification SA212 · 2012-06-22 · this action $2,538 · running total $57,742,884Modification SA215 · 2012-06-22 · this action -$141 · running total $57,742,743Modification SA202 · 2012-07-19 · this action -$3,424 · running total $57,739,319Modification CO02R · 2012-07-20 · this action $8,469 · running total $57,747,788Modification SA210 · 2012-07-20 · this action $4,500 · running total $57,752,288Modification SA221 · 2012-07-20 · this action $25,966 · running total $57,778,254Modification SA209 · 2012-07-23 · this action $1,342 · running total $57,779,596Modification SA218 · 2012-07-23 · this action $9,637 · running total $57,789,233Modification SA219 · 2012-07-23 · this action -$252 · running total $57,788,981Modification SA211 · 2012-07-25 · this action $2,805 · running total $57,791,786Modification SA216 · 2012-07-25 · this action $6,000 · running total $57,797,786Modification SA220 · 2012-07-26 · this action $13,192 · running total $57,810,978Modification SA222 · 2012-07-26 · this action $7,055 · running total $57,818,033Modification SA223 · 2012-07-26 · this action $8,845 · running total $57,826,878Modification SA224 · 2012-07-26 · this action $6,478 · running total $57,833,356Modification SA225 · 2012-07-26 · this action $16,704 · running total $57,850,060Modification CO02S · 2012-07-27 · this action $2,000 · running total $57,852,060Modification SA226 · 2012-08-08 · this action $31,730 · running total $57,883,790Modification SA227 · 2012-08-22 · this action -$11,465 · running total $57,872,325Modification SA230 · 2012-08-22 · this action $1,608 · running total $57,873,933Modification SA231 · 2012-08-22 · this action $8,450 · running total $57,882,383Modification SA232 · 2012-08-22 · this action $13,192 · running total $57,895,575Modification SA233 · 2012-08-22 · this action $14,971 · running total $57,910,546Modification SA234 · 2012-08-27 · this action $19,213 · running total $57,929,759Modification SA235 · 2012-08-27 · this action $18,952 · running total $57,948,711Modification SA237 · 2012-08-27 · this action $9,853 · running total $57,958,564Modification SA239 · 2012-09-07 · this action $39,054 · running total $57,997,618Modification SA214 · 2012-09-17 · this action $14,074 · running total $58,011,692Modification SA217 · 2012-09-17 · this action $40,015 · running total $58,051,707Modification CO02T · 2012-09-24 · this action $95,518 · running total $58,147,225Modification SA213 · 2012-09-29 · this action $140,827 · running total $58,288,052Modification SA228 · 2012-10-04 · this action $75,354 · running total $58,363,406Modification CO02W · 2012-10-06 · this action $6,855 · running total $58,370,261Modification SA229 · 2012-10-06 · this action $25,177 · running total $58,395,438Modification SA240 · 2012-10-06 · this action $1,770 · running total $58,397,208Modification SA241 · 2012-10-06 · this action $17,213 · running total $58,414,421Modification SA242 · 2012-10-06 · this action $18,978 · running total $58,433,399Modification SA243 · 2012-10-06 · this action $5,665 · running total $58,439,064Modification SA244 · 2012-10-06 · this action $16,322 · running total $58,455,386Modification SA245 · 2012-10-06 · this action $1,708 · running total $58,457,094Modification SA246 · 2012-10-06 · this action $2,830 · running total $58,459,924Modification SA247 · 2012-10-06 · this action $2,346 · running total $58,462,270Modification SA249 · 2012-10-06 · this action $10,650 · running total $58,472,920Modification SA248 · 2012-10-10 · this action $4,793 · running total $58,477,713Modification SA251 · 2012-10-17 · this action $1,551 · running total $58,479,264Modification SA253 · 2012-10-17 · this action $2,047 · running total $58,481,311Modification SA254 · 2012-10-17 · this action $6,720 · running total $58,488,031Modification SA256 · 2012-10-22 · this action $2,882 · running total $58,490,913Modification SA257 · 2012-10-22 · this action $17,735 · running total $58,508,648Modification SA258 · 2012-10-22 · this action $10,269 · running total $58,518,917Modification SA238 · 2012-10-24 · this action $21,610 · running total $58,540,527Modification SA259 · 2012-10-25 · this action $28,277 · running total $58,568,804Modification SA255 · 2012-11-02 · this action $14,865 · running total $58,583,669Modification SA260 · 2012-11-02 · this action $12,291 · running total $58,595,960Modification SA261 · 2012-11-02 · this action $8,552 · running total $58,604,512Modification SA263 · 2012-11-27 · this action $12,500 · running total $58,617,012Modification SA264 · 2012-11-27 · this action $37,210 · running total $58,654,222Modification CO02V · 2012-11-28 · this action $5,660 · running total $58,659,882Modification CO02X · 2012-11-28 · this action $25,000 · running total $58,684,882Modification SA266 · 2012-12-05 · this action $7,589 · running total $58,692,471Modification SA269 · 2012-12-05 · this action $2,863 · running total $58,695,334Modification CO02Z · 2012-12-21 · this action $20,000 · running total $58,715,334Modification CO02Y · 2012-12-28 · this action $19,000 · running total $58,734,334Modification SA271 · 2013-01-07 · this action $2,621 · running total $58,736,955Modification P00003 · 2013-01-16 · this action $3,411 · running total $58,740,366Modification CO03A · 2013-01-17 · this action $5,351 · running total $58,745,717Modification SA267 · 2013-01-28 · this action $20,631 · running total $58,766,348Modification P00001 · 2013-01-31 · this action $2,206 · running total $58,768,554Modification P00004 · 2013-02-14 · this action $15,000 · running total $58,783,554Modification P00007 · 2013-02-14 · this action $16,321 · running total $58,799,875Modification P00008 · 2013-02-19 · this action $38,751 · running total $58,838,626Modification P00011 · 2013-02-20 · this action $19,171 · running total $58,857,797Modification P00005 · 2013-02-22 · this action $1,366 · running total $58,859,163Modification P00013 · 2013-03-12 · this action $10,000 · running total $58,869,163Modification SA262 · 2013-03-21 · this action $615 · running total $58,869,778Modification P00009 · 2013-04-05 · this action -$1,064 · running total $58,868,714Modification P00014 · 2013-04-15 · this action -$1,650 · running total $58,867,064Modification P00015 · 2013-04-15 · this action $6,370 · running total $58,873,434Modification P00018 · 2013-04-24 · this action $2,325 · running total $58,875,759Modification P00019 · 2013-04-24 · this action -$549 · running total $58,875,210Modification P00023 · 2013-04-29 · this action $5,400 · running total $58,880,610Modification P00016 · 2013-04-30 · this action $98,000 · running total $58,978,610Modification P00020 · 2013-04-30 · this action -$7,699 · running total $58,970,911Modification P00021 · 2013-04-30 · this action $1,007 · running total $58,971,918Modification P00022 · 2013-04-30 · this action -$6,406 · running total $58,965,512Modification P00017 · 2013-05-02 · this action $0 · running total $58,965,512Modification P00024 · 2013-05-03 · this action $7,454 · running total $58,972,966Modification P00025 · 2013-05-20 · this action $5,767 · running total $58,978,733Modification P00026 · 2013-05-31 · this action $81,895 · running total $59,060,628Modification P00031 · 2013-05-31 · this action $24,000 · running total $59,084,628Modification P00028 · 2013-06-03 · this action $2,539 · running total $59,087,167Modification P00029 · 2013-06-04 · this action $3,686 · running total $59,090,853Modification P00030 · 2013-06-04 · this action $3,905 · running total $59,094,758Modification P00027 · 2013-06-06 · this action $13,712 · running total $59,108,470Modification P00032 · 2013-06-06 · this action -$10,634 · running total $59,097,836Modification P00033 · 2013-06-06 · this action -$5,000 · running total $59,092,836Modification P00034 · 2013-06-06 · this action $4,241 · running total $59,097,077Modification P00036 · 2013-06-06 · this action $8,936 · running total $59,106,013Modification P00037 · 2013-06-06 · this action $28,533 · running total $59,134,546Modification P00035 · 2013-06-07 · this action $11,534 · running total $59,146,080Modification SA273 · 2013-07-17 · this action $12,786 · running total $59,158,866Modification P00039 · 2013-07-19 · this action $30,645 · running total $59,189,511Modification P00040 · 2013-07-19 · this action $0 · running total $59,189,511Modification P00041 · 2013-07-19 · this action $27,227 · running total $59,216,738Modification P00042 · 2013-07-19 · this action $0 · running total $59,216,738Modification P00043 · 2013-07-19 · this action $3,453 · running total $59,220,191Modification P00044 · 2013-08-01 · this action $3,678 · running total $59,223,869Modification P00045 · 2013-08-14 · this action $2,321 · running total $59,226,190Modification P00046 · 2013-08-14 · this action -$1,627 · running total $59,224,563Modification P00038 · 2013-09-20 · this action $14,482 · running total $59,239,045Modification SA252 · 2013-10-17 · this action $9,543 · running total $59,248,588Modification CO02U · 2013-10-22 · this action $1,977 · running total $59,250,565
  • Base2009-09-25+$53,144,925= $53,144,925
  • Mod CO01A2010-03-05+$211,115= $53,356,040
  • Mod CO01B2010-03-31+$6,738= $53,362,778
  • Mod SA0012010-09-30+$20,868= $53,383,646
  • Mod SA0022010-09-30+$43,598= $53,427,244
  • Mod SA0032010-09-30+$52,974= $53,480,218
  • Mod SA0042010-09-30+$38,216= $53,518,434
  • Mod SA0052010-09-30+$42,629= $53,561,063
  • Mod SA0062010-09-30+$18,660= $53,579,723
  • Mod SA0072010-09-30+$5,732= $53,585,455
  • Mod SA0082010-09-30+$5,621= $53,591,076
  • Mod SA0092010-09-30+$39,370= $53,630,446
  • Mod SA0102010-09-30+$39,774= $53,670,220
  • Mod SA0112010-09-30+$1,477= $53,671,697
  • Mod SA0122010-09-30+$88,454= $53,760,151
  • Mod SA0132010-10-04+$21,877= $53,782,028
  • Mod SA0142010-10-06+$50,531= $53,832,559
  • Mod SA0152010-12-29+$440= $53,832,999
  • Mod SA0162010-12-29+$20,000= $53,852,999
  • Mod SA0172010-12-29+$2,310= $53,855,309
  • Mod SA0182010-12-29+$3,134= $53,858,443
  • Mod SA0202010-12-29+$3,218= $53,861,661
  • Mod SA0212010-12-29+$9,468= $53,871,129
  • Mod SA0222010-12-29+$5,022= $53,876,151
  • Mod SA0232010-12-29+$18,692= $53,894,843
  • Mod SA0242010-12-29+$54,528= $53,949,371
  • Mod SA0252010-12-29+$7,645= $53,957,016
  • Mod SA0272011-01-06+$43,601= $54,000,617
  • Mod SA0312011-02-06+$10,484= $54,011,101
  • Mod SA0322011-02-06+$16,126= $54,027,227
  • Mod SA0332011-02-06+$2,769= $54,029,996
  • Mod SA0392011-02-07+$5,379= $54,035,375
  • Mod SA0292011-02-20-$36,128= $53,999,247
  • Mod SA0302011-02-20+$3,189= $54,002,436
  • Mod SA0402011-03-11+$99,639= $54,102,075
  • Mod SA0412011-03-11+$5,192= $54,107,267
  • Mod SA0462011-03-21+$24,850= $54,132,117
  • Mod SA0472011-03-21+$20,781= $54,152,898
  • Mod SA0422011-03-22+$5,070= $54,157,968
  • Mod SA0432011-03-22+$4,131= $54,162,099
  • Mod SA0592011-04-07+$66,478= $54,228,577
  • Mod SA0542011-04-08+$8,506= $54,237,083
  • Mod SA0552011-04-08+$3,119= $54,240,202
  • Mod SA0482011-04-11+$35,674= $54,275,876
  • Mod SA0602011-04-11+$9,367= $54,285,243
  • Mod SA0622011-04-11+$71,351= $54,356,594
  • Mod CO01C2011-04-12+$4,813= $54,361,407
  • Mod CO01D2011-04-12+$2,445= $54,363,852
  • Mod CO01E2011-04-12+$66,000= $54,429,852
  • Mod SA0442011-04-13+$35,053= $54,464,905
  • Mod SA0492011-04-13+$17,923= $54,482,828
  • Mod SA0502011-04-13+$11,821= $54,494,649
  • Mod SA0512011-04-13+$28,912= $54,523,561
  • Mod SA0522011-04-13+$9,834= $54,533,395
  • Mod SA0532011-04-13+$6,688= $54,540,083
  • Mod SA0612011-04-14+$4,392= $54,544,475
  • Mod SA0632011-04-14+$1,982= $54,546,457
  • Mod SA0642011-04-14+$6,266= $54,552,723
  • Mod SA0562011-05-03+$32,805= $54,585,528
  • Mod SA0572011-05-03+$70,775= $54,656,303
  • Mod SA0582011-05-03+$4,321= $54,660,624
  • Mod SA0652011-05-03+$13,050= $54,673,674
  • Mod SA0662011-05-03+$3,991= $54,677,665
  • Mod SA0672011-05-03+$3,698= $54,681,363
  • Mod SA0682011-05-09+$4,925= $54,686,288
  • Mod SA0692011-05-09+$14,000= $54,700,288
  • Mod SA0702011-05-09+$8,320= $54,708,608
  • Mod SA0712011-05-09+$44,825= $54,753,433
  • Mod SA0722011-05-09+$1,308= $54,754,741
  • Mod SA0262011-05-10+$64,063= $54,818,804
  • Mod SA0382011-05-10+$938= $54,819,742
  • Mod SA0452011-05-10+$13,408= $54,833,150
  • Mod SA0282011-05-18+$1,317= $54,834,467
  • Mod SA0812011-07-20+$20,900= $54,855,367
  • Mod SA0832011-07-20+$36,321= $54,891,688
  • Mod SA0862011-07-20+$14,717= $54,906,405
  • Mod SA0872011-07-20+$22,733= $54,929,138
  • Mod SA0892011-07-20+$31,514= $54,960,652
  • Mod SA0912011-07-20+$385= $54,961,037
  • Mod SA0922011-07-20+$5,333= $54,966,370
  • Mod SA0932011-07-20+$1,711= $54,968,081
  • Mod SA0942011-07-20+$385= $54,968,466
  • Mod SA0952011-07-20+$5,749= $54,974,215
  • Mod SA0962011-07-20+$10,654= $54,984,869
  • Mod SA0982011-07-20+$22,439= $55,007,308
  • Mod SA0992011-07-20+$8,900= $55,016,208
  • Mod SA1002011-07-20+$2,074= $55,018,282
  • Mod SA1012011-07-20+$1,715= $55,019,997
  • Mod SA1022011-07-20+$5,900= $55,025,897
  • Mod SA1032011-07-20+$25,036= $55,050,933
  • Mod CO01F2011-07-25+$97,079= $55,148,012
  • Mod SA0972011-07-25+$604= $55,148,616
  • Mod SA1042011-07-25+$4,069= $55,152,685
  • Mod SA1052011-07-25+$18,931= $55,171,616
  • Mod SA1062011-07-25+$8,091= $55,179,707
  • Mod SA1072011-07-25+$9,532= $55,189,239
  • Mod SA1082011-07-25+$20,540= $55,209,779
  • Mod SA1092011-07-25+$1,867= $55,211,646
  • Mod SA1102011-07-25+$7,432= $55,219,078
  • Mod SA1112011-07-25+$2,305= $55,221,383
  • Mod SA1122011-07-25+$1,419= $55,222,802
  • Mod SA1132011-07-25+$72,295= $55,295,097
  • Mod SA1142011-07-25+$47,429= $55,342,526
  • Mod SA1152011-07-25+$11,509= $55,354,035
  • Mod SA1182011-07-25+$10,521= $55,364,556
  • Mod SA1202011-07-25+$30,279= $55,394,835
  • Mod SA1192011-07-26+$39,289= $55,434,124
  • Mod SA1302011-08-16+$4,840= $55,438,964
  • Mod SA1312011-08-16+$11,334= $55,450,298
  • Mod SA1322011-08-16+$25,021= $55,475,319
  • Mod SA1332011-08-16+$2,124= $55,477,443
  • Mod SA1342011-08-16+$21,322= $55,498,765
  • Mod SA1352011-08-16+$2,821= $55,501,586
  • Mod SA1362011-08-16+$17,024= $55,518,610
  • Mod SA1372011-08-16+$12,222= $55,530,832
  • Mod SA1382011-08-16+$3,000= $55,533,832
  • Mod SA1392011-08-16+$12,848= $55,546,680
  • Mod SA0792011-08-17+$385= $55,547,065
  • Mod SA0802011-08-17+$20,723= $55,567,788
  • Mod SA0842011-08-17+$2,353= $55,570,141
  • Mod SA0852011-08-17+$2,818= $55,572,959
  • Mod SA0882011-08-17+$1,382= $55,574,341
  • Mod SA0902011-08-17+$6,332= $55,580,673
  • Mod SA1222011-08-23+$4,285= $55,584,958
  • Mod SA1232011-08-23+$98,118= $55,683,076
  • Mod SA1242011-08-23+$8,000= $55,691,076
  • Mod SA1422011-08-30+$87,975= $55,779,051
  • Mod SA1442011-08-30+$13,031= $55,792,082
  • Mod SA1452011-08-30+$10,332= $55,802,414
  • Mod SA1462011-08-30+$7,350= $55,809,764
  • Mod SA1472011-08-30+$1,460= $55,811,224
  • Mod SA1482011-08-30+$14,042= $55,825,266
  • Mod CO01G2011-09-06+$33,962= $55,859,228
  • Mod CO01H2011-09-06+$11,550= $55,870,778
  • Mod SA1212011-09-06+$5,817= $55,876,595
  • Mod SA1252011-09-06+$9,492= $55,886,087
  • Mod SA1272011-09-06-$37,636= $55,848,451
  • Mod SA1282011-09-06+$7,581= $55,856,032
  • Mod SA1292011-09-06+$50,776= $55,906,808
  • Mod SA1402011-09-06+$2,694= $55,909,502
  • Mod SA0192011-09-12+$22,086= $55,931,588
  • Mod SA0342011-09-12+$15,825= $55,947,413
  • Mod SA0352011-09-12+$16,350= $55,963,763
  • Mod SA0362011-09-12-$13,237= $55,950,526
  • Mod SA0372011-09-12+$15,289= $55,965,815
  • Mod SA0732011-09-12+$12,047= $55,977,862
  • Mod SA0742011-09-12+$3,740= $55,981,602
  • Mod SA0752011-09-12+$8,628= $55,990,230
  • Mod SA0762011-09-12+$9,183= $55,999,413
  • Mod SA0772011-09-12+$1,500= $56,000,913
  • Mod SA0822011-09-12+$33,782= $56,034,695
  • Mod SA1172011-09-12+$34,257= $56,068,952
  • Mod SA1262011-09-12+$1,746= $56,070,698
  • Mod SA1412011-09-12+$27,314= $56,098,012
  • Mod SA1512011-09-12+$56,661= $56,154,673
  • Mod SA1522011-09-12+$21,915= $56,176,588
  • Mod SA1532011-09-12+$5,508= $56,182,096
  • Mod SA1542011-09-12-$37,547= $56,144,549
  • Mod SA1562011-09-12+$86,071= $56,230,620
  • Mod SA1572011-09-12+$3,388= $56,234,008
  • Mod SA1582011-09-12+$36,186= $56,270,194
  • Mod SA1592011-09-12+$6,229= $56,276,423
  • Mod SA1602011-09-12+$92,713= $56,369,136
  • Mod SA1612011-09-12+$4,822= $56,373,958
  • Mod SA1622011-09-12+$5,017= $56,378,975
  • Mod SA1642011-09-23+$14,640= $56,393,615
  • Mod SA1682011-09-23+$1,782= $56,395,397
  • Mod SA1692011-10-06+$8,726= $56,404,123
  • Mod SA1702011-10-06+$21,094= $56,425,217
  • Mod SA1762011-10-06+$35,458= $56,460,675
  • Mod SA1712011-10-07+$10,996= $56,471,671
  • Mod SA1722011-10-07+$14,670= $56,486,341
  • Mod SA1732011-10-07+$19,713= $56,506,054
  • Mod SA1742011-10-07+$10,918= $56,516,972
  • Mod SA1752011-10-07+$15,457= $56,532,429
  • Mod SA1772011-10-11+$9,877= $56,542,306
  • Mod SA1782011-10-11+$15,638= $56,557,944
  • Mod SA1162011-10-14-$275,000= $56,282,944
  • Mod SA1662011-10-24+$6,557= $56,289,501
  • Mod SA1492011-10-25+$15,083= $56,304,584
  • Mod SA1502011-10-25+$16,295= $56,320,879
  • Mod SA1632011-10-25+$31,874= $56,352,753
  • Mod SA1792011-10-25+$59,050= $56,411,803
  • Mod SA1802011-11-01+$52,051= $56,463,854
  • Mod SA1812011-11-01+$54,254= $56,518,108
  • Mod SA0782011-12-08+$25,000= $56,543,108
  • Mod SA1672011-12-08+$27,579= $56,570,687
  • Mod CO01J2011-12-14+$50,000= $56,620,687
  • Mod CO01L2011-12-14+$15,000= $56,635,687
  • Mod CO01O2011-12-20+$1,129= $56,636,816
  • Mod SA1552011-12-23+$205,569= $56,842,385
  • Mod SA1652011-12-28+$23,457= $56,865,842
  • Mod CO01I2012-01-03+$95,424= $56,961,266
  • Mod SA1822012-01-03+$10,825= $56,972,091
  • Mod CO01M2012-01-16+$35,000= $57,007,091
  • Mod CO01N2012-01-16+$40,000= $57,047,091
  • Mod SA1832012-01-16+$14,440= $57,061,531
  • Mod CO01K2012-01-20-$49,033= $57,012,498
  • Mod CO01P2012-01-20+$3,421= $57,015,919
  • Mod CO01Q2012-01-20+$11,227= $57,027,146
  • Mod CO01R2012-01-20+$12,538= $57,039,684
  • Mod CO01S2012-02-03+$1,841= $57,041,525
  • Mod CO01T2012-02-13+$20,459= $57,061,984
  • Mod CO01U2012-02-17+$3,780= $57,065,764
  • Mod CO01V2012-02-17+$1,898= $57,067,662
  • Mod CO01W2012-02-17+$17,560= $57,085,222
  • Mod CO01X2012-02-17+$25,454= $57,110,676
  • Mod CO01Y2012-02-17+$5,265= $57,115,941
  • Mod CO01Z2012-02-17+$3,646= $57,119,587
  • Mod CO02A2012-02-17+$3,569= $57,123,156
  • Mod SA1842012-02-17+$4,964= $57,128,120
  • Mod SA1852012-02-17+$1,802= $57,129,922
  • Mod SA1432012-02-29+$73,709= $57,203,631
  • Mod SA1862012-02-29+$8,408= $57,212,039
  • Mod SA1872012-02-29+$59,947= $57,271,986
  • Mod CO02B2012-03-06+$2,910= $57,274,896
  • Mod SA1882012-03-07+$46,475= $57,321,371
  • Mod SA1892012-03-08+$7,641= $57,329,012
  • Mod SA1902012-03-08+$79,589= $57,408,601
  • Mod SA1912012-03-08+$2,068= $57,410,669
  • Mod SA1922012-03-08+$56,832= $57,467,501
  • Mod SA1932012-03-08+$1,994= $57,469,495
  • Mod SA1942012-03-08+$3,185= $57,472,680
  • Mod CO02C2012-04-11+$19,984= $57,492,664
  • Mod SA1962012-04-11+$6,021= $57,498,685
  • Mod CO02E2012-04-12+$4,939= $57,503,624
  • Mod CO02D2012-04-16+$19,297= $57,522,921
  • Mod CO02F2012-04-18+$40,689= $57,563,610
  • Mod CO02G2012-04-18+$14,138= $57,577,748
  • Mod CO02H2012-04-24+$9,220= $57,586,968
  • Mod CO02I2012-04-24+$19,844= $57,606,812
  • Mod CO02J2012-04-24+$16,959= $57,623,771
  • Mod CO02K2012-04-24+$15,027= $57,638,798
  • Mod CO02L2012-04-24+$8,246= $57,647,044
  • Mod CO02M2012-04-24+$15,065= $57,662,109
  • Mod SA1982012-05-14+$9,005= $57,671,114
  • Mod SA1952012-05-16+$3,691= $57,674,805
  • Mod SA1972012-05-16+$7,814= $57,682,619
  • Mod CO02N2012-05-24+$11,061= $57,693,680
  • Mod CO02O2012-05-24+$8,075= $57,701,755
  • Mod CO02P2012-05-25+$3,914= $57,705,669
  • Mod SA1992012-05-31+$385= $57,706,054
  • Mod CO02Q2012-06-11+$2,054= $57,708,108
  • Mod SA2002012-06-19+$4,569= $57,712,677
  • Mod SA2012012-06-19+$17,339= $57,730,016
  • Mod SA2042012-06-19+$298= $57,730,314
  • Mod SA2052012-06-19+$4,525= $57,734,839
  • Mod SA2062012-06-19+$1,080= $57,735,919
  • Mod SA2072012-06-19+$2,841= $57,738,760
  • Mod SA2032012-06-20+$1,586= $57,740,346
  • Mod SA2122012-06-22+$2,538= $57,742,884
  • Mod SA2152012-06-22-$141= $57,742,743
  • Mod SA2022012-07-19-$3,424= $57,739,319
  • Mod CO02R2012-07-20+$8,469= $57,747,788
  • Mod SA2102012-07-20+$4,500= $57,752,288
  • Mod SA2212012-07-20+$25,966= $57,778,254
  • Mod SA2092012-07-23+$1,342= $57,779,596
  • Mod SA2182012-07-23+$9,637= $57,789,233
  • Mod SA2192012-07-23-$252= $57,788,981
  • Mod SA2112012-07-25+$2,805= $57,791,786
  • Mod SA2162012-07-25+$6,000= $57,797,786
  • Mod SA2202012-07-26+$13,192= $57,810,978
  • Mod SA2222012-07-26+$7,055= $57,818,033
  • Mod SA2232012-07-26+$8,845= $57,826,878
  • Mod SA2242012-07-26+$6,478= $57,833,356
  • Mod SA2252012-07-26+$16,704= $57,850,060
  • Mod CO02S2012-07-27+$2,000= $57,852,060
  • Mod SA2262012-08-08+$31,730= $57,883,790
  • Mod SA2272012-08-22-$11,465= $57,872,325
  • Mod SA2302012-08-22+$1,608= $57,873,933
  • Mod SA2312012-08-22+$8,450= $57,882,383
  • Mod SA2322012-08-22+$13,192= $57,895,575
  • Mod SA2332012-08-22+$14,971= $57,910,546
  • Mod SA2342012-08-27+$19,213= $57,929,759
  • Mod SA2352012-08-27+$18,952= $57,948,711
  • Mod SA2372012-08-27+$9,853= $57,958,564
  • Mod SA2392012-09-07+$39,054= $57,997,618
  • Mod SA2142012-09-17+$14,074= $58,011,692
  • Mod SA2172012-09-17+$40,015= $58,051,707
  • Mod CO02T2012-09-24+$95,518= $58,147,225
  • Mod SA2132012-09-29+$140,827= $58,288,052
  • Mod SA2282012-10-04+$75,354= $58,363,406
  • Mod CO02W2012-10-06+$6,855= $58,370,261
  • Mod SA2292012-10-06+$25,177= $58,395,438
  • Mod SA2402012-10-06+$1,770= $58,397,208
  • Mod SA2412012-10-06+$17,213= $58,414,421
  • Mod SA2422012-10-06+$18,978= $58,433,399
  • Mod SA2432012-10-06+$5,665= $58,439,064
  • Mod SA2442012-10-06+$16,322= $58,455,386
  • Mod SA2452012-10-06+$1,708= $58,457,094
  • Mod SA2462012-10-06+$2,830= $58,459,924
  • Mod SA2472012-10-06+$2,346= $58,462,270
  • Mod SA2492012-10-06+$10,650= $58,472,920
  • Mod SA2482012-10-10+$4,793= $58,477,713
  • Mod SA2512012-10-17+$1,551= $58,479,264
  • Mod SA2532012-10-17+$2,047= $58,481,311
  • Mod SA2542012-10-17+$6,720= $58,488,031
  • Mod SA2562012-10-22+$2,882= $58,490,913
  • Mod SA2572012-10-22+$17,735= $58,508,648
  • Mod SA2582012-10-22+$10,269= $58,518,917
  • Mod SA2382012-10-24+$21,610= $58,540,527
  • Mod SA2592012-10-25+$28,277= $58,568,804
  • Mod SA2552012-11-02+$14,865= $58,583,669
  • Mod SA2602012-11-02+$12,291= $58,595,960
  • Mod SA2612012-11-02+$8,552= $58,604,512
  • Mod SA2632012-11-27+$12,500= $58,617,012
  • Mod SA2642012-11-27+$37,210= $58,654,222
  • Mod CO02V2012-11-28+$5,660= $58,659,882
  • Mod CO02X2012-11-28+$25,000= $58,684,882
  • Mod SA2662012-12-05+$7,589= $58,692,471
  • Mod SA2692012-12-05+$2,863= $58,695,334
  • Mod CO02Z2012-12-21+$20,000= $58,715,334
  • Mod CO02Y2012-12-28+$19,000= $58,734,334
  • Mod SA2712013-01-07+$2,621= $58,736,955
  • Mod P000032013-01-16+$3,411= $58,740,366
  • Mod CO03A2013-01-17+$5,351= $58,745,717
  • Mod SA2672013-01-28+$20,631= $58,766,348
  • Mod P000012013-01-31+$2,206= $58,768,554
  • Mod P000042013-02-14+$15,000= $58,783,554
  • Mod P000072013-02-14+$16,321= $58,799,875
  • Mod P000082013-02-19+$38,751= $58,838,626
  • Mod P000112013-02-20+$19,171= $58,857,797
  • Mod P000052013-02-22+$1,366= $58,859,163
  • Mod P000132013-03-12+$10,000= $58,869,163
  • Mod SA2622013-03-21+$615= $58,869,778
  • Mod P000092013-04-05-$1,064= $58,868,714
  • Mod P000142013-04-15-$1,650= $58,867,064
  • Mod P000152013-04-15+$6,370= $58,873,434
  • Mod P000182013-04-24+$2,325= $58,875,759
  • Mod P000192013-04-24-$549= $58,875,210
  • Mod P000232013-04-29+$5,400= $58,880,610
  • Mod P000162013-04-30+$98,000= $58,978,610
  • Mod P000202013-04-30-$7,699= $58,970,911
  • Mod P000212013-04-30+$1,007= $58,971,918
  • Mod P000222013-04-30-$6,406= $58,965,512
  • Mod P000172013-05-02+$0= $58,965,512
  • Mod P000242013-05-03+$7,454= $58,972,966
  • Mod P000252013-05-20+$5,767= $58,978,733
  • Mod P000262013-05-31+$81,895= $59,060,628
  • Mod P000312013-05-31+$24,000= $59,084,628
  • Mod P000282013-06-03+$2,539= $59,087,167
  • Mod P000292013-06-04+$3,686= $59,090,853
  • Mod P000302013-06-04+$3,905= $59,094,758
  • Mod P000272013-06-06+$13,712= $59,108,470
  • Mod P000322013-06-06-$10,634= $59,097,836
  • Mod P000332013-06-06-$5,000= $59,092,836
  • Mod P000342013-06-06+$4,241= $59,097,077
  • Mod P000362013-06-06+$8,936= $59,106,013
  • Mod P000372013-06-06+$28,533= $59,134,546
  • Mod P000352013-06-07+$11,534= $59,146,080
  • Mod SA2732013-07-17+$12,786= $59,158,866
  • Mod P000392013-07-19+$30,645= $59,189,511
  • Mod P000402013-07-19+$0= $59,189,511
  • Mod P000412013-07-19+$27,227= $59,216,738
  • Mod P000422013-07-19+$0= $59,216,738
  • Mod P000432013-07-19+$3,453= $59,220,191
  • Mod P000442013-08-01+$3,678= $59,223,869
  • Mod P000452013-08-14+$2,321= $59,226,190
  • Mod P000462013-08-14-$1,627= $59,224,563
  • Mod P000382013-09-20+$14,482= $59,239,045
  • Mod SA2522013-10-17+$9,543= $59,248,588
  • Mod CO02U2013-10-22+$1,977= $59,250,565
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-09-25+$53,144,925$53,144,925CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC
Mod CO01A· CHANGE ORDER2010-03-05+$211,115$53,356,040CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC, CO-01A
Mod CO01B· CHANGE ORDER2010-03-31+$6,738$53,362,778CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC, CO-01B
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$20,868$53,383,646CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-001
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$43,598$53,427,244CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-004
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$52,974$53,480,218CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-003
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$38,216$53,518,434CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-004
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$42,629$53,561,063CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-005
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$18,660$53,579,723CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-006
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$5,732$53,585,455CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-007
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$5,621$53,591,076CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-008
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$39,370$53,630,446CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-009
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$39,774$53,670,220CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-010
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$1,477$53,671,697CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-011
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$88,454$53,760,151CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-012
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-04+$21,877$53,782,028CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-013
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-06+$50,531$53,832,559CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-014
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$440$53,832,999CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-015
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$20,000$53,852,999CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-016
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$2,310$53,855,309CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-017
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$3,134$53,858,443CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-018
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$3,218$53,861,661CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-020
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$9,468$53,871,129CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-021
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$5,022$53,876,151CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-022
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$18,692$53,894,843CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-023
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$54,528$53,949,371CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-024
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$7,645$53,957,016CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-025
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-06+$43,601$54,000,617LEE COUNTY OUTPATIENT CLINIC SA-012
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-06+$10,484$54,011,101LEE COUNTY OUTPATIENT CLINIC SA-031
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-06+$16,126$54,027,227LEE COUNTY OUTPATIENT CLINIC SA-032
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-06+$2,769$54,029,996LEE COUNTY OUTPATIENT CLINIC SA-032
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-07+$5,379$54,035,375LEE COUNTY OUTPATIENT CLINIC SA-039
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-20−$36,128$53,999,247LEE COUNTY OUTPATIENT CLINIC SA-029
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-20+$3,189$54,002,436LEE COUNTY OUTPATIENT CLINIC SA-030
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-11+$99,639$54,102,075LEE COUNTY OUTPATIENT CLINIC SA-040
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-11+$5,192$54,107,267LEE COUNTY OUTPATIENT CLINIC SA-041
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-21+$24,850$54,132,117LEE COUNTY OUTPATIENT CLINIC SA-046
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-21+$20,781$54,152,898LEE COUNTY OUTPATIENT CLINIC SA-047
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-22+$5,070$54,157,968LEE COUNTY OUTPATIENT CLINIC SA-042
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-22+$4,131$54,162,099LEE COUNTY OUTPATIENT CLINIC SA-043
Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-07+$66,478$54,228,577LEE COUNTY OUTPATIENT CLINIC SA-059
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-08+$8,506$54,237,083LEE COUNTY OUTPATIENT CLINIC SA-054
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-08+$3,119$54,240,202LEE COUNTY OUTPATIENT CLINIC SA-055
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-11+$35,674$54,275,876LEE COUNTY OUTPATIENT CLINIC SA-048
Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-11+$9,367$54,285,243LEE COUNTY OUTPATIENT CLINIC SA-060
Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-11+$71,351$54,356,594TO RELOCATE THE DOMESTIC WATER TANK PUMP FROM IN GROUND TO AN ENCLOSURE ABOVE GROUND. SA-062
Mod CO01C· CHANGE ORDER2011-04-12+$4,813$54,361,407CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC, CO-01C
Mod CO01D· CHANGE ORDER2011-04-12+$2,445$54,363,852CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC, CO-01D
Mod CO01E· CHANGE ORDER2011-04-12+$66,000$54,429,852CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC, CO-01E
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$35,053$54,464,905LEE COUNTY OUTPATIENT CLINIC SA-044
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$17,923$54,482,828LEE COUNTY OUTPATIENT CLINIC SA-049
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$11,821$54,494,649LEE COUNTY OUTPATIENT CLINIC SA-050
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$28,912$54,523,561LEE COUNTY OUTPATIENT CLINIC SA-051
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$9,834$54,533,395LEE COUNTY OUTPATIENT CLINIC SA-052
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-13+$6,688$54,540,083LEE COUNTY OUTPATIENT CLINIC SA-053
Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-14+$4,392$54,544,475LEE COUNTY OUTPATIENT CLINIC SA-061
Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-14+$1,982$54,546,457LEE COUNTY OUTPATIENT CLINIC SA-063
Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-14+$6,266$54,552,723LEE COUNTY OUTPATIENT CLINIC SA-064
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$32,805$54,585,528TO RELOCATE THERMOSTAT LOCATIONS THAT WERE IN CONFLICT WITH OTHER WORK SHOWN ON THE CONTRACT DOCUMENTS. SA-056
Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$70,775$54,656,303THE VA MEDICAL CENTER INFORMATION TECHNOLOGY REQUESTED ADDITIONAL NEEDS FOR ADDITIONAL DATA, POWER AND TELEPHO…
Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$4,321$54,660,624THE CONTRACT DOCUMENTS DID NOT INCLUDE A COLOR FOR THE STANDING SEAM METAL ROOF AND IT WAS DETERMINED TO SELEC…
Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$13,050$54,673,674TO REPLACE EXAM ROOM SINKS SO AS TO MEET UFAS AND ADA REQUIREMENTS. SA-065
Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$3,991$54,677,665TO INCREASES THE SIZE OF A STRUCTURAL STEEL ANGLE AT THE HEAD OF WALL OF THE CURTAIN WALL LOCATED AT THE SECON…
Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-03+$3,698$54,681,363TO REVISE WALL LOCATIONS, TYPES AND PARTITION HEIGHTS DUE TO DESIGN ERRORS. MODIFY LEAD LINED PARTITIONS AND…
Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$4,925$54,686,288RELOCATE ELECTRICAL BOXES, DEVICES; CHANGE QUADS TO DUPLEX. SA-068
Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$14,000$54,700,288SA-069 TO REPLACE DENTAL LIGHT BRACING IN-WALL WITH BRACING IN-CEILING PER THE REQUEST OF THE VAMC.
Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$8,320$54,708,608SA-070 THE CONTRACT DOCUMENTS STATE WATER IS AVAILABLE AT NO COST TO THE CONTRACTOR AND IS IN ERROR. DUE TO T…
Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$44,825$54,753,433SA-071 THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR AND IS IN ERROR. DU…
Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$1,308$54,754,741SA-072 TO MODIFY GLAZING DUE TO ERRORS IN THE DESIGN.
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-10+$64,063$54,818,804SA-026 TO PROVIDE ADDITIONAL PHOTOGRAPHIC DOCUMENTATION FOR THE PROJECT TO AIDE THE GOVERNMENT IN THE DOCUMENT…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-10+$938$54,819,742SA-028 THE CONTRACT DRAWINGS NEEDED TO BE REVISED TO REVISE AN ELEVATOR SHAFT DAMPERS TO REFLECT THE CLEARANCE…
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-10+$13,408$54,833,150SA-045 TO ADD PLUMBING DRAIN MODIFICATIONS TO ROOM 2B-169 AS WELL AS ADD ADDITIONAL UTILITIES TO THE FUTURE MO…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-18+$1,317$54,834,467SA-028 TO REMOVE DIFFICULT MAINTENANCE ITEMS FROM THE OR AREAS AND INSTALL AS MUCH HVAC EQUIPMENT AS POSSIBLE…
Mod SA081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$20,900$54,855,367SUBSTITUTE WALL AND CEILING FINISH MATERIALS IN SPECIFIC ROOMS TO COMPLY WITH VACFM DESIGN GUIDES AS WELL AS P…
Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$36,321$54,891,688TO MODIFY LANDSCAPING TO INCLUDE LANDSCAPING ADDITIONS FOR THE ADD SMOKING SHELTERS, RELOCATE SMOKING SHELTERS…
Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$14,717$54,906,405DURING THE INSTALLATION OF THE WATER MAIN CONNECTION TO DIPLOMAT PARKWAY, THE CONTRACTOR WAS NOT ABLE TO LOCAT…
Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$22,733$54,929,138THE RELOCATE STORM PIPE AND OUTLET STRUCTURE TO GOVERNMENT PROPERTY IN LIEU OF ADJACENT PROPERTY THAT IS OWNED…
Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$31,514$54,960,652THE CITY OF CAPE CORAL EXISTING STORM DRAINAGE SYSTEM ALONG DIPLOMAT PARKWAY MUST BE RELOCATED SINCE THE REVIS…
Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$385$54,961,037TO MODIFY THE GENERATOR, ATS AND SWITCHGEAR SPECIFICATIONS TO ACHIEVE COMPATIBLE FAULT CURRENT AND PROTECTIVE…
Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$5,333$54,966,370TO ADD ADDITIONAL VOICE/DATA OUTLETS FOR THE PRINTER SHOWN IN TWO LOCATIONS PER THE EQUIPMENT DRAWINGS BUT NOT…
Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$1,711$54,968,081TO ADD CONCRETE STEPS TO THE 2ND FLOOR ROOF ACCESS DOOR AND TO PAINT THE CEP CONTROL ROOM NOT SHOWN ON THE CON…
Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$385$54,968,466ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$5,749$54,974,215TO ADD STAINLESS STEEL SHELVES AND TOWEL BARS TO SEVERAL RESTROOMS THROUGHOUT THE FACILITY.
Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$10,654$54,984,869THE IRRIGATION WATER WELL WAS DRILLED IN A DIFFERENT LOCATION THAN SHOWN ON AMENDED PLANS CAUSING THE LAYOUT O…
Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$22,439$55,007,308THE VAMC REQUESTED FOR A DOOR TO BE ADDED TO ROOM 1B-168 TO THE LOBBY SIDE OF THE ROOM AT PHARMACY FOR IMPROVE…
Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$8,900$55,016,208TO CONVERT STANDARD PARKING SPACES IN THE STAFF PARKING LOT INTO 9 ADA/UFAS PARKING STALLS FOR STAFF HANDICAP…
Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$2,074$55,018,282TO MODIFY THE EXTERIOR LUMINAIRES/FIXTURES IN THE CEP YARD FIXTURE TYPE TO A MORE ARE MORE APPROPRIATE, ARCHIT…
Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$1,715$55,019,997TO MODIFY THE GYPSUM WALL BOARD HEADERS TO ACCEPT THE FULL HEIGHT ACCORDION DOORS IN THE CONFERENCE ROOMS.
Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$5,900$55,025,897TO REVISE AND STRENGTHEN THE CANOPY EXPANSION JOINT DETAILS SINCE THE JOINT ARE REQUIRED FOR SECURITY PER THE…
Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-20+$25,036$55,050,933TO CHANGE COUNTER TOPS IN SPECIFIC HIGH-USE AREAS FROM PLASTIC LAMINATE TO SOLID SURFACE FOR INCREASED DURABIL…
Mod CO01F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$97,079$55,148,012TO PROVIDE A NEW IRRIGATION WELL TO PROVIDE A 100% WATER SUPPLIED IRRIGATION TO THE SITE SINCE THE CONNECTION…
Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$604$55,148,616TO MODIFY THE CERAMIC TILE COLOR SELECTION DUE TO CONTRACT ERRORS AND OMISSIONS.
Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$4,069$55,152,685TO MODIFY THE PAVEMENT TAT THE OXYGEN SERVICE YARD FROM ASHPALT TO CONCRETE DUE TO CODE/AUTHORITY OF JURISDICT…
Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$18,931$55,171,616TO ADD SUB-AQUEOUS PLANTINGS IN THE RETENTION PONDS AS REQUIRED BY THE SFWMD (SOUTH FLORIDA WATER MANAGEMENT…
Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$8,091$55,179,707THE VAMC REQUESTED FOR ALL TOILET STALLS/COMPARTMENTS TO BE PLASTIC IN LIEU OF METAL FROM A DURABILITY STANDPO…
Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$9,532$55,189,239CHILLED WATER PIPING FOR THE WALK-IN REFRIGERATOR IN ROOM 1B-106 IS NOT SHOWN ON THE CONTRACT DRAWINGS AND MU…
Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$20,540$55,209,779THE VAMC REQUESTED FOR THE MOPS STATION TO BE MONITORED BY THE BUILDING MANAGEMENT SYSTEM SINCE THE CONTRACT…
Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$1,867$55,211,646A CONCRETE ELECTRIC VAULT AND A STORM SEWER OUT FALL STRUCTURE WERE CONSTRUCTED CLOSE TO THE NORTH PROPERTY LI…
Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$7,432$55,219,078THE CONTRACT DOCUMENTS SHOW FOR THE COOLING TOWER DRAIN TO BE CONNECTED TO THE STORM SEWER SYSTEM BUT THE AUTH…
Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$2,305$55,221,383TO INSTALL A WALL BEHIND THE SPANDREL GLASS IN CORRIDOR C1-27 AND INSTALL AN ACCESS DOOR TO CONCEAL THE RAIN W…
Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$1,419$55,222,802TO REVISE THE CONCRETE CURB DETAIL AT THE INTERSESCTION OF THE EXPANSION JOINTS AT THE SECOND LEVEL ROOF/EXTER…
Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$72,295$55,295,097THE VAMC REQUESTED A CHANGE TO MODIFY THE COOLING TOWER YARD TO ADD AN ADDITIONAL DRIVEWAY AND ENTRY WAY INTO…
Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$47,429$55,342,526THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$11,509$55,354,035TO PROVIDE A RAIN KEY/DRIP EDGE ON THE EXTERIOR WALL PRECAST CAP TO PREVENT WATER DAMAGE TO THE WALL.
Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$10,521$55,364,556THE VAMC POLICE REQUESTED CHANGES TO THE LOCKER ROOM AND HOLDING CELL TO BETTER MEET THEIR SECURITY NEEDS FOR…
Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$30,279$55,394,835TO MODIFY THE ACOUSTICAL TILE CEILING (ACT) PERFORATION PATTERN TO INCREASE THE NOISE REDUCTION COEFFICIENT (N…
Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-26+$39,289$55,434,124THE VA MEDICAL CENTER PERSONNEL REQUESTS PERMANENT ACCESS TO THE LEVEL 2 ROOF AREAS CURRENTLY NOT SHOWN ON THE…
Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$4,840$55,438,964ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$11,334$55,450,298ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$25,021$55,475,319ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$2,124$55,477,443ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$21,322$55,498,765ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$2,821$55,501,586ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$17,024$55,518,610ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$12,222$55,530,832ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$3,000$55,533,832ADJUST DETAILS OF THE CURTAIN WALL DETAILS TO COORDINATE WITH STRUCTURAL STEEL DOCUMENTS.
Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$12,848$55,546,680TO CHANGE CEILINGS PER THE ARCHITECT'S RECOMMENDATIONS ON THE LEVELS 3 AND 4. ALSO, TO CHANGE ACCENT PAINT IN…
Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$385$55,547,065LEE COUNTY OUTPATIENT CLINIC SA-079
Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$20,723$55,567,788LEE COUNTY OUTPATIENT CLINIC SA-080
Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$2,353$55,570,141LEE COUNTY OUTPATIENT CLINIC SA-084
Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$2,818$55,572,959LEE COUNTY OUTPATIENT CLINIC SA-085
Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$1,382$55,574,341LEE COUNTY OUTPATIENT CLINIC SA-088
Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-17+$6,332$55,580,673LEE COUNTY OUTPATIENT CLINIC SA-090
Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-23+$4,285$55,584,958LEE COUNTY OUTPATIENT CLINIC, FORT MEYERS, FL SA-122
Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-23+$98,118$55,683,076LEE COUNTY OUTPATIENT CLINIC, FORT MEYERS, FL SA-123
Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-23+$8,000$55,691,076LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-124
Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$87,975$55,779,051CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-142
Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$13,031$55,792,082CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-144
Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$10,332$55,802,414CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-145
Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$7,350$55,809,764CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-146
Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$1,460$55,811,224CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-147
Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$14,042$55,825,266CONSTRUCTION OF COMMUNITY BASED OUTPATIENT CLINIC SA-148
Mod CO01G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$33,962$55,859,228LEE COUNTY OUTPATIENT, FORT MEYERS, FL CO-01G
Mod CO01H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$11,550$55,870,778LEE COUNTY OUTPATIENT, FORT MEYERS, FL
Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$5,817$55,876,595LEE COUNTY OUTPATIENT CLINIC, FORT MEYERS, FL
Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$9,492$55,886,087LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-125
Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06−$37,636$55,848,451LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-127
Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$7,581$55,856,032LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-128
Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$50,776$55,906,808LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-129
Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$2,694$55,909,502LEE COUNTY OUTPATIENT CLINIC, FORT MEYERS, FL
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$22,086$55,931,588TO ADD AND DELETE VARIOUS MECHANICAL WORK ITEMS TO CLARIFY THE CONTRACT DOCUMENTS AND PROVIDE A MORE USEFUL F…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$15,825$55,947,413IMPROVE ARCHITECTURAL AESTHETICS BY RAISING TOP ELEVATION OF SOUTH SITE WALL AND WINDOW SILL AT STAIR 3 BY 6 I…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$16,350$55,963,763TO MODIFY THE AIR TERMINAL UNITS HEATING COIL IN THE OPERATING ROOMS TO PROVIDE PROPER FLOW OF CONDITIONED AIR…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12−$13,237$55,950,526TO DELETE THE PURCHASE AND INSTALLATION OF GE EQUIPMENT FROM THE CONTRACT SINCEIT DOES NOT MEET THE BUY AMERIC…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$15,289$55,965,815A DESIGN ERROR REVEALED STRUCTURAL STEEL PLATES MUST BE ADDED TO THE STRUCTURAL STEEL ROOF FRAMING OVER THE PU…
Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$12,047$55,977,862ADD ELECTRICAL CIRCUITS AND OUTLETS AS DESCRIBED IN RFI'S 137, 138, 139, 140, 141, 142, 143&144 DUE TO DESIGN…
Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$3,740$55,981,602TO ADD EMPTY CONDUIT SLEEVES IN FLOOR FOR THE VAMC TO INSTALL WATER LINE FROM DENTAL CHAIRS FLOOR BOX TO WATER…
Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$8,628$55,990,230MODIFICATION TO INTERIOR PARTITIONS TO EXTEND ALL THE WAY ABOVE CEILING TO THE BOTTOM OF FLOOR DECK IN LIEU OF…
Mod SA076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$9,183$55,999,413MODIFY SEVERAL INTERIOR PARTITIONS TO EXTEND FROM STRUCTUTE TO STRUCTURE FOR INCREASED SOUND CONTROL AND CONST…
Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$1,500$56,000,913ADD A 18" X 10" X 24" CONCRETE CURB AT THE BASE OF THE ACCESS LADDER AT THE PASSENGER ELEVATOR MACHINE ROOM DU…
Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$33,782$56,034,695THE VAMC REQUESTED THAT A BARRIER BE INSTALLED BETWEEN THE AUTOMOBILE PARKING LOTS AND THE WET RETENTION PONDS…
Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$34,257$56,068,952TO ADD CONCRETE SLABS AND FOOTINGS FOR THE BUS SHELTERS TO MET CODE COMPLIANCE AND TO MODIFY THE ROOF SHELTER…
Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$1,746$56,070,698LEE COUNTY OUTPATIENT CLINIC, FT MEYERS, FL SA-126
Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$27,314$56,098,012TO REVISE THE SITE CONCRETE AT THE BUILDING ENTRIES TO SIMPLIFY CONSTRUCTION, ENHANCE AESTHETICS AND INCREASE…
Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$56,661$56,154,673TO PROVIDE POWER, CONTROL, LIGHTING AND COMMUNICATION EQUIPMENT THAT WAS NOT SHOWN ON THE CONTRACT DOCUMENTS F…
Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$21,915$56,176,588TO PROVIDE ADDITIONAL ELECTRICAL WORK NOT SHOWN ON THE CONTRACT DRAWINGS FOR INSTALLATION OF THE VAMC DENTAL X…
Mod SA153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$5,508$56,182,096TO MODIFY LOCATIONS AND EXTENTS OF CEILING AND WALL EXPANSION JOINTS AND TO REVISE THE INTERIOR EXPANSION JOIN…
Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12−$37,547$56,144,549THE ORIGINAL IRRIGATION WATER WELL PERMITTED AT 30 GPM AND DRILLED DOES NOT MEET THE FLOW REQUIREMENTS OF THE…
Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$86,071$56,230,620THE VAMC PERSONNEL REQUESTED ADDITIONAL NATURAL GAS AND OXYGEN LINES TO VARIOUS ROOMS IN THE DENTAL CLINIC TO…
Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$3,388$56,234,008THE A/E CONTRACT REQUIRED FINAL INSPECTION OF THE SIX ELEVATORS ON THE PROJECT AND THE A/E ELEVATOR INSPECTOR…
Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$36,186$56,270,194THE VAMC REQUESTED THE CHANGE IN UTILITIES FOR THE SCOPE CLEANING AREA SINCE THE ACTUAL EQUIPMENT TO BE INSTAL…
Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$6,229$56,276,423COORDINATION OF ELECTRICAL AND TELECOMMUNICATIONS INSTALLATION DETAILS BASED ON VAMC CURRENT INFORMATION RESUL…
Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$92,713$56,369,136A LOCATION FOR THE FUEL MAINTENANCE SYSTEM WAS NOT INCLUDED ON THE CONTRACT DRAWINGS AND A FINAL LOCATION WAS…
Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$4,822$56,373,958THE EXISTING FORCE MAIN ALONG DIPLOMAT PARKWAY HAD TO BE RELOCATED DUE TO A CONFLICT WITH THE RELOCATED STORM…
Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-12+$5,017$56,378,975TO MODIFY AND REPAIR GYPSUM WALL BOARD DUE TO THE RELOCATION OF ELECTRICAL RECEPTACLES, RELOCATED THERMOSTATS…
Mod SA164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-23+$14,640$56,393,615THE ARCHITECT ENGINEER RECOMMEND CHANGING THE STONE VENEER VAPOR BARRIER FROM A TWO COATS OF A FLUID APPLIED,…
Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-23+$1,782$56,395,397THE ELECTRICAL CONNECTION TO AN EXAM ROOM LIGHT IN ROOM 1A-104 WAS MISSING FROM THE ORIGINAL DOCUMENTS, AND WA…
Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-06+$8,726$56,404,123TO MODIFY THE CONDENSER WATER PUMP CONTROL SEQUENCE DUE TO A DESIGN ERROR.
Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-06+$21,094$56,425,217TO ADD A FOURTH LIGHT FOR TWO EXTERIOR SIGNS, AND TO ADD FOUR LUMINAIRES AT EACH OF THE OTHER TWO EXTERIOR SIG…
Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-06+$35,458$56,460,675VARIOUS OWNER-FURNISHED EQUIPMENT REQUIRED MODIFICATIONS OF THE POWER. THE URINALYSIS AREA OF ROOM 1B-106 WAS…
Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-07+$10,996$56,471,671TO RELOCATE THE FIRE SPRINKLER SYSTEM DUE TO THE MODIFICATIONS TO THE CANTEEN SKYLIGHTS AS WELL AS MODIFY THE…
Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-07+$14,670$56,486,341THE CONTRACT DOCUMENTS STATE WATER IS AVAILABLE AT NO COST TO THE CONTRACTOR AND IS IN ERROR. DUE TO THIS FAC…
Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-07+$19,713$56,506,054THE IRRIGATION SYSTEM TIMER/CONTROLLER WAS DESIGNED TO BE INSTALLED INSIDE THE CENTRAL ENERGY PLANT CONTROL RO…
Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-07+$10,918$56,516,972THE THICKNESS OF STONE VENEER MATERIAL STATED IN THE CONTRACT DOCUMENTS WAS LESS AND SURFACE FINISH WAS ROUGHE…
Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-07+$15,457$56,532,429SEVERAL PLUMBING INSTALLATION AND THE HVAC INSTALLATION MODIFICATIONS REQUIRED ADDITIONAL WORK BY THE GENERAL…
Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-11+$9,877$56,542,306THE CEILING-MOUNTED EXIT SIGNS AT CORRIDOR INTERSECTIONS WERE SHOWN TO BE LOCATED SUCH THAT THEY PARTIALLY BLO…
Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-11+$15,638$56,557,944THE CONTRACT DRAWINGS SHOW THE BOILER STACKS TERMINATING AT 4'-0" ABOVE THE ROOF. THIS SECTION OF ROOF IS INT…
Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14−$275,000$56,282,944TO PROVIDE RESTITUTION FOR NON-COMPLIANT/FOREIGN ELECTRICAL FITTINGS TO BE INSTALLED IN THE BUILDING OF THE NE…
Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-24+$6,557$56,289,501THE GOVERNMENT'S RETAINED ARCHITECT ENGINEER MODIFIED SEVERAL DETAILS TO THE CURTAIN WALL DUE TO DESIGN ERRORS…
Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-25+$15,083$56,304,584THE GOVERNMENT'S ARCHITECT ENGINEER REQUESTED EXPOSED COLORED CONCRETE FOR SITE PLANTERS AND EXTERIOR COLUMN B…
Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-25+$16,295$56,320,879THE GOVERNMENT'S RETAINED ARCHITECT CHANGED THE TRAVERTINE STONE PANEL TO GRANITE DUE TO LIMITED COLOR SELECTI…
Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-25+$31,874$56,352,753THE VAMC REQUESTED FOR THE CANTEEN BE MODIFIED TO INCLUDE A COFFEE DISTRIBUTION AREA FOR PATIENT CARE.
Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-25+$59,050$56,411,803THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-01+$52,051$56,463,854THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-01+$54,254$56,518,108THE VAMC REQUESTED A CHANGE TO THE CONTRACT DOCUMENTS TO SUPPORT THE GOVERNMENT PURCHASED AND INSTALLED RADIO…
Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-08+$25,000$56,543,108TO DELETE CONCRETE SEALER AND ADD TRAFFIC COATING TO PENTHOUSE FLOORS. DELETE AND SIMPLIFY SPECIFIC INTERIOR…
Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-08+$27,579$56,570,687DOOR VISION PANELS WERE ADDED IN SOME DOORS FOR OCCUPANT SAFE EXITING. DOOR VISION PANELS WERE DELETED FOR PR…
Mod CO01J· CHANGE ORDER2011-12-14+$50,000$56,620,687THE RADIOLOGY ROOMS WERE ORIGINALLY DESIGNED AND BID WITHOUT THE DETAILS REQUIRED FOR INSTALLING AND INTERFACI…
Mod CO01L· CHANGE ORDER2011-12-14+$15,000$56,635,687DURESS ALARMS WERE REQUESTED PRIMARILY IN ADDITIONAL AREAS OF THE MENTAL HEALTH DEPARTMENT BY VA POLICE BASED…
Mod CO01O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-20+$1,129$56,636,816NECESSARY HVAC WORK INCLUDING ADDRESSING VARIOUS MECHANICAL REBALANCING IN THE SPD AREA AND RF HVAC ADJUSTMENT…
Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-23+$205,569$56,842,385THE VAMC PERSONNEL QUESTIONED ROOM SIZE FOR THE SPD STEAM GENERATION EQUIPMENT ROOM WAS NOT ADEQUATELY SIZED F…
Mod SA165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-28+$23,457$56,865,842TO ADD CONTOURS/BERMS NOT SHOWN ON THE GRADING DRAWINGS, TO RAISE ELEVATION OF ROYAL PALM TREES' ROOT BALLS AB…
Mod CO01I· CHANGE ORDER2012-01-03+$95,424$56,961,266DURING A REVIEW OF THE GOVERNMENT PURCHASED CONTRACTOR INSTALLED BIOLOGICAL CABINET IN ROOM 1B-107A, IT WAS NO…
Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-03+$10,825$56,972,091THE MDF ROOM THAT WAS DESIGNED TO HOUSE THE PBX TELEPHONE EQUIPMENT WAS DESIGNED WITH POWER REQUIREMENTS FOR T…
Mod CO01M· CHANGE ORDER2012-01-16+$35,000$57,007,091ADDITIONAL SECURITY CAMERAS FOR VIDEO SURVEILLANCE WERE REQUESTED IN ADDITIONAL AREAS OF THE MENTAL HEALTH ARE…
Mod CO01N· CHANGE ORDER2012-01-16+$40,000$57,047,091ADDITIONAL ACCESS CONTROL DEVICES, CARDREADERS, AND ASSOCIATED HARDWARD WERE REQUESTED IN ADDITIONAL AREAS OF…
Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-16+$14,440$57,061,531THE FIRE ALARM MESSAGE THAT IS ANNOUNCED WHEN AN INCIDENT OCCURS WAS SPECIFIED TO ANNOUNCE ONLY THE "BUILDING,…
Mod CO01K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-20−$49,033$57,012,498VAMC PREFERS TO INSTALL SPECIFIC EQUIPMENT THAT WAS INCLUDED IN THE GC CONTRACT.
Mod CO01P· CHANGE ORDER2012-01-20+$3,421$57,015,919VERTICAL SURFACED MOUNTED, EXPOSED CONDUIT IS SHOWN INSIDE DATA CLOSET 1A-208 ON SHEET TJ-101D; IT IS ACCEPTAB…
Mod CO01Q· CHANGE ORDER2012-01-20+$11,227$57,027,146FIELD MODIFICATION OF THE LIGHTING WAS REQUESTED BY THE VA ARCHITECT TO INCREASE LIGHTING IN AREAS OF PUBLIC R…
Mod CO01R· CLOSE OUT2012-01-20+$12,538$57,039,684THE CONTRACTOR PROPOSED SUBSTITUTING PLASTIC COVER PLATES FOR ELECTRICAL DEVICES SUCH AS LIGHT SWITCHES AND EL…
Mod CO01S· CHANGE ORDER2012-02-03+$1,841$57,041,525THE EMERGENCY OVERFLOW ROOF DRAINS ON THE CLINIC AND D&T ROOFS HAVE A TOP ELEVATION THAT IS NOT SUFFICIENTLY H…
Mod CO01T· CHANGE ORDER2012-02-13+$20,459$57,061,984THE VAMC REQUESTED THAT THE WALK-IN REFRIGERATOR AND SIX OTHER REFRIGERATORS USED FOR STORAGE OF PHARMACEUTICA…
Mod CO01U· CHANGE ORDER2012-02-17+$3,780$57,065,764CABLE BARRIERS TO RESTRAIN AUTOMOBILES FROM ROLLING INTO THE DEEP RETENTION PONDS WERE REQUESTED BY THE VA POL…
Mod CO01V· CHANGE ORDER2012-02-17+$1,898$57,067,662ADDITIONAL ROOF COPING DETAILS WERE PROVIDED BY THE VA ARCHITECT DURING CONSTRUCTION TO CLARIFY AND SUPPLEMENT…
Mod CO01W· CHANGE ORDER2012-02-17+$17,560$57,085,222DURING INITIAL TRAINING AND TESTING OF THE CHILLED WATER SYSTEM IT WAS NOTICED THERE WAS NO ACCESS TO CHILLER…
Mod CO01X· CHANGE ORDER2012-02-17+$25,454$57,110,676THE HEAT LOADINGS AND HVAC SYSTEM IN THE CT AND MRI ROOMS OF RADIOLOGY AREA CHANGED FROM THE DESIGN ASSUMPTION…
Mod CO01Y· CHANGE ORDER2012-02-17+$5,265$57,115,941THE CORBETT ROAD ENTRANCE DRIVEWAY INTERSECTION FLOODS THE ROADWAY DURING RAINY CONDITIONS, PRESENTING A DRIVI…
Mod CO01Z· CHANGE ORDER2012-02-17+$3,646$57,119,587NECESSARY ADDITIONAL HVAC WORK INCLUDING ADDRESSING VARIOUS MECHANICAL REBALANCING IN THE SPD AREA AND RF HVAC…
Mod CO02A· CHANGE ORDER2012-02-17+$3,569$57,123,156TWO FIRE ALARM EQUIPMENT PANELS WERE ORIGINALLY LOCATED IN THE OPERATING ROOMS WORK CORE AND WERE SURFACE-MOUN…
Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-17+$4,964$57,128,120THE VA MEDICAL CENTER PERSONNEL REQUESTED A DROP FOR COMPRESSED AIR AND DI WATER BE ADDED TO ROOM 2B-182.
Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-17+$1,802$57,129,922THE VA REQUESTED A FLOOD LIGHT TO ILLUMINATE THE FLAGS DURING PERIODS OF LIMITED DAYLIGHT, TO REPLACE THE POLE…
Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-29+$73,709$57,203,631THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-29+$8,408$57,212,039THE CONTRACT DOCUMENTS STATE WATER IS AVAILABLE AT NO COST TO THE CONTRACTOR AND IS IN ERROR. DUE TO THIS FAC…
Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-29+$59,947$57,271,986THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod CO02B· CHANGE ORDER2012-03-06+$2,910$57,274,896MAKEUP AIR IS REQUIRED IN THE CEP CHILLER ROOM IF THE REFRIGERANT EXHAUST SYSTEM IS EVER ACTIVATED, AND THE A/…
Mod SA188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-07+$46,475$57,321,371THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$7,641$57,329,012THE CONTRACT DOCUMENTS STATE WATER IS AVAILABLE AT NO COST TO THE CONTRACTOR AND IS IN ERROR. DUE TO THIS FAC…
Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$79,589$57,408,601THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$2,068$57,410,669THE SOUTH FLORID WATER AMANAGEMENT DISTRICT (SFWMD) INSPECTED THE SITE STORM WATER DRAINAGE SYSTEMS AND ADVISE…
Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$56,832$57,467,501THE CONTRACT DOCUMENTS STATE ELECTRICITY IS AVAILABLE AT NO COST TO THE CONTRACTOR IS IN ERROR. THE FACILITY…
Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$1,994$57,469,495THE GENERAL CONTRACTOR AND SUBCONTRACTOR ADDED ISOLATION VALVES IN THE IRRIGATION SYSTEM PIPING TO AID IN THEI…
Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-08+$3,185$57,472,680THE GENERAL CONTRACTOR AGREED TO PURCHASE ON VA'S BEHALF SOME IMMEDIATELY-REQUIRED PUNCHLIST INSPECTION SUPPLI…
Mod CO02C· CHANGE ORDER2012-04-11+$19,984$57,492,664THE MICROBIOLOGY HOOD EXHAUST SYSTEM IS REQUIRED TO EXHAUST AT THE HIGHEST POINT OF THE CLINIC ROOFS, AND TO P…
Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-11+$6,021$57,498,685ADDITIONAL CEILING ACCESS DOORS (12) MADE OF STAINLESS STEEL ARE REQUIRED IN THE OPERATING ROOM CEILINGS TO PR…
Mod CO02E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-12+$4,939$57,503,624PROVIDE RESPONSES AND COMPENSATION FOR UNSOLICITED REQUESTS FOR MINOR WORK DESCRIBED IN RFI REPSONSES #583 AND…
Mod CO02D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-16+$19,297$57,522,921THE ELECTRICAL DISTRIBUTION CIRCUIT DESIGNED TO SUPPLY ELECTRICAL POWER TO THE UNINTERRUPTIBLE POWER SUPPLY (U…
Mod CO02F· CHANGE ORDER2012-04-18+$40,689$57,563,610BED DOCKER CIRCUITS WERE INITIALLY DETERMINED TO BE DESIGNED IN ACCORDANCE WITH FLORIDA BUILDING CODE, BUT WER…
Mod CO02G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-18+$14,138$57,577,748CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod CO02H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$9,220$57,586,968CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod CO02I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$19,844$57,606,812CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod CO02J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$16,959$57,623,771CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod CO02K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$15,027$57,638,798PROVIDE ELECTRICAL COORDINATION DETAILS AND INSTRUCTIONS FOR INSTALLING VARIOUS MISCELLANEOUS SINKS, WATER TRE…
Mod CO02L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$8,246$57,647,044CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod CO02M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$15,065$57,662,109CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-14+$9,005$57,671,114THE ORIGINALLY-PERMITTED AND DRILLED WELL DID NOT PROVIDE WATER AT AN ADEQUATE RATE TO SATISFY THE IRRIGATION…
Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-16+$3,691$57,674,805THE GENERAL CONTRACTOR SUBMITTED AN UNSOLICITED REQUEST FOR PAYMENT FOR WORK ALREADY COMPLETED FOR TWO UNANTIC…
Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-16+$7,814$57,682,619CLEAR ANODIZED PARAPET COPING MATERIAL WAS SELECTED DURING THE SUBMITTAL PROCESS TO MATCH THE CURTAIN WALL AT…
Mod CO02N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-24+$11,061$57,693,680FOLLOWING BUILDING CUSTODY TRANSFER TO THE VAMC, ADDITIONAL TIME WAS REQUIRED FOR THE VAMC VISN 8 CONTRACTING…
Mod CO02O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-24+$8,075$57,701,755FOLLOWING BUILDING CUSTODY TRANSFER TO THE VAMC, ADDITIONAL TIME WAS REQUIRED FOR THE VAMC TO POST AND SOLICIT…
Mod CO02P· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-25+$3,914$57,705,669DURING FUNCTIONAL TESTING OF THE FIRE ALARM SYSTEM, THE VAMC NOTED A LIMITATION OF THE INSTALLED FIRE ALARM PA…
Mod SA199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-31+$385$57,706,054THE EMERGENCY OVERFLOW ROOF DRAINS ON THE CLINIC AND D&T ROOFS HAVE A TOP ELEVATION THAT IS NOT SUFFICIENTLY H…
Mod CO02Q· CHANGE ORDER2012-06-11+$2,054$57,708,108DURING A BUILDING WALK THROUGH WITH THE LOCAL VA PERSONNEL IT WAS NOTICED THAT THE ROOM PRESSURE MONITOR FOR N…
Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$4,569$57,712,677NECESSARY HVAC WORK INCLUDING ADDRESSING VARIOUS MECHANICAL REBALANCING IN THE SPD AREA AND RF HVAC ADJUSTMENT…
Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$17,339$57,730,016THE VAMC REQUESTED THAT THE WALK-IN REFRIGERATOR AND SIX OTHER REFRIGERATORS USED FOR STORAGE OF PHARMACEUTICA…
Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$298$57,730,314ADDITIONAL ROOF COPING DETAILS WERE PROVIDED BY THE VA ARCHITECT DURING CONSTRUCTION TO CLARIFY AND SUPPLEMENT…
Mod SA205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$4,525$57,734,839BED DOCKER CIRCUITS WERE INITIALLY DETERMINED TO BE DESIGNED IN ACCORDANCE WITH FLORIDA BUILDING CODE, BUT WER…
Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$1,080$57,735,919A SECTION OF WALL ON LEVEL 2 WAS NEEDED TO INFILL A SPACE BETWEEN THE DOUBLE CORRIDOR DOORS AND AN EXTERIOR CO…
Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-19+$2,841$57,738,760THE VAMC DENTAL STAFF REQUESTED ADDITIONAL OXYGEN AND DENTAL VACUUM LINES BE INSTALLED IN VARIOUS ROOMS OF THE…
Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-20+$1,586$57,740,346OFFICE SUPPLIES TO SUPPORT THE PUNCH LIST INSPECTION AND RE-INSPECTION PROCESS WERE REQUIRED ON SHORT NOTICE A…
Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22+$2,538$57,742,884FOLLOWING BUILDING CUSTODY TRANSFER TO THE VAMC, ADDITIONAL TIME WAS REQUIRED FOR THE VAMC CONTRACTING OFFICE…
Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22−$141$57,742,743THE MICROBIOLOGY HOOD EXHAUST SYSTEM IS REQUIRED TO EXHAUST AT THE HIGHEST POINT OF THE CLINIC ROOFS, AND TO P…
Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-19−$3,424$57,739,319THE CITY OF CAPE CORAL DOES NOT REQUIRED CATHODIC PROTECTION FOR THEIR WATER LINES. THEREFORE CATHODIC PROTEC…
Mod CO02R· CHANGE ORDER2012-07-20+$8,469$57,747,788THE VAMC REQUESTED A PERSON LIFT FOR A TOILET ROOM (ROOM 1A-143) TOWARDS THE END OF THE PROJECT AS ACCOMMODATI…
Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$4,500$57,752,288THE ORIGINAL PLANS AND SPECIFICATIONS DID NOT INDICATE ANY SILLS TO FINISH THREE EXTERIOR DOORS. THE SILL DET…
Mod SA221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$25,966$57,778,254THE PACKAGE CHILLER UNIT ON THE D&T ROOF SERVING THE ORS IS LACKING AN ACCESS PLATFORM AROUND THE PERIMETER AN…
Mod SA209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-23+$1,342$57,779,596REIMBURSE THE CONTRACTOR FOR THE COST TO PURCHASE THE COPYRIGHT OF THE CUSTOM DIGITAL IMAGES FROM ISTOCKPHOTO…
Mod SA218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-23+$9,637$57,789,233THE AIR FLOWS AND COOLING REQUIRED IN THE CT WAS NOT ADEQUATE IN THE ORIGINAL DESIGN. ASI #177 REVISES THE HV…
Mod SA219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-23−$252$57,788,981DURING FUNCTIONAL TESTING OF THE FIRE ALARM SYSTEM, THE VAMC NOTED A LIMITATION OF THE INSTALLED FIRE ALARM PA…
Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-25+$2,805$57,791,786THE ELECTRICAL DISTRIBUTION CIRCUIT DESIGNED TO SUPPLY ELECTRICAL POWER TO THE UNINTERRUPTIBLE POWER SUPPLY (U…
Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-25+$6,000$57,797,786GRADING RESULTED IN AN ELEVATION DIFFERENCE BETWEEN THE BOTTOM OF THE STONE VENEER ON THE BARRIER WALLS AND TH…
Mod SA220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$13,192$57,810,978VAMC WAS UNABLE TO GET NEW LANDSCAPE MAINTENANCE CONTRACT THROUGH VAMC CONTRACTING OFFICE IN TIME, AND REQUEST…
Mod SA222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$7,055$57,818,033DURESS ALARMS WERE REQUESTED PRIMARILY IN ADDITIONAL AREAS OF THE MENTAL HEALTH DEPARTMENT BY VA POLICE BASED…
Mod SA223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$8,845$57,826,878AFTER REVIEW OF THE SECURITY DRAWINGS WITH THE VA POLICE, THE VA POLICE REQUESTED ADDITIONAL CAMERA, RELOCATED…
Mod SA224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$6,478$57,833,356DURING CONSTRUCTION OF THIS BUILDING, THE VA CHANGED ACCESS CARD READER REQUIREMENTS.
Mod SA225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-26+$16,704$57,850,060THE VAMC REQUESTED ADDITIONAL BOOM SUPPORT IN ROOM 2B-174 TO ACCOMMODATE ADDITIONAL EQUIPMENT.
Mod CO02S· CLOSE OUT2012-07-27+$2,000$57,852,060DURING THE INSTALLATION OF THE TEMPORARY SECURITY DESK AND AGAIN FOR THE PERMANENT SECURITY CONSOLE IN THE VA…
Mod SA226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-08+$31,730$57,883,790SEVEN OPERATING ROOMS EACH HAVE TWO ELECTRICAL PANELBOARD COVERS (14 TOTAL COVERS) THAT ARE PAINTED STEEL AND…
Mod SA227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-22−$11,465$57,872,325THE EXTERIOR LIGHTING WAS REVISED AT ALL BUILDING ENTRANCES TO REMOVE BOLLARD TOP LIGHTING AND ADD POLE MOUNTE…
Mod SA230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-22+$1,608$57,873,933DURING BUILDING CONSTRUCTION NUMEROUS ELECTRICAL ISSUES WERE ASKED BY THE GENERAL CONTRACTOR. THE ANSWERS GEN…
Mod SA231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-22+$8,450$57,882,383DURING THE COURSE OF CONSTRUCTION THE GENERAL CONTRACTOR ISSUED SEVERAL RFIS RELATING TO ELECTRICAL WORK. THE…
Mod SA232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-22+$13,192$57,895,575VAMC WAS UNABLE TO GET NEW LANDSCAPE MAINTENANCE CONTRACT THROUGH VAMC CONTRACTING OFFICE IN TIME, AND REQUEST…
Mod SA233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-22+$14,971$57,910,546DURING THE COURSE OF THE PROJECT, THE GENERAL CONTRACTOR (GC) ISSUED SEVERAL RFI'S REQUESTING CLARIFICATION OF…
Mod SA234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-27+$19,213$57,929,759DURING CONSTRUCTION IT WAS NOTICED THAT THE LENGTH OF RUNS FOR CAT 6 CABLING EXCEEDED THE DISTANCE LIMITATION…
Mod SA235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-27+$18,952$57,948,711THE DESIGN DRAWINGS FOR ELECTRICAL WERE NOT PROPERLY COORDINATED RESULTING IN ADDITIONAL WORK BY THE ELECTRICA…
Mod SA237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-27+$9,853$57,958,564THE ELECTRICAL DRAWINGS WERE MISSING SEVERAL LOCATIONS FOR POWER. THE VARIOUS RFI RESPONSES HEREIN PROVIDED T…
Mod SA239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-07+$39,054$57,997,618DURING CONSTRUCTION, THE VAMC SUSPECTED THAT SOME OF THE HVAC DUCTS MIGHT HAVE HAD DUST OR DEBRIS GET INSIDE.…
Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-17+$14,074$58,011,692POTABLE WATER IS REQUIRED FOR THE CONSTRUCTION TRAILERS AND FOR STARTUP AND INITIAL OPERATION OF THE NEW CLINI…
Mod SA217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-17+$40,015$58,051,707THE FACILITY IS NOT CURRENTLY FULLY STAFFED AND REQUESTED THE GC CONTINUE ROUTINE MECHANICAL MAINTENANCE ON MA…
Mod CO02T· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-24+$95,518$58,147,225SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-29+$140,827$58,288,052ELECTRIC POWER IS REQUIRED FOR THE CONSTRUCTION TRAILERS AND FOR STARTUP AND INITIAL OPERATION OF THE NEW CLIN…
Mod SA228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-04+$75,354$58,363,406THE EXTERIOR LIGHTING WAS REVISED AT ALL BUILDING ENTRANCES TO REMOVE BOLLARD TOP LIGHTING AND ADD POLE MOUNTE…
Mod CO02W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$6,855$58,370,261THE A&E REVISED SEVERAL AIR FLOWS IN THE RADIOLOGY AREA. THE A&E DID NOT REVISE THE FAN SIZE OR TOTAL AIR FLO…
Mod SA229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$25,177$58,395,438A REVIEW OF ELECTRICAL DRAWINGS BY THE GENERAL CONTRACTOR GENERATED SEVERAL ELECTRICAL RELATED RFI'S TO ADD EL…
Mod SA240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$1,770$58,397,208THE APPROVED SUBMITTAL FOR PROSTHETICS STORAGE CABINETS INDICATES THEY SHOULD BE MECHANICALLY ASSISTED.
Mod SA241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$17,213$58,414,421CONTRACTOR RECEIVED COORDINATION INSTRUCTIONS FROM THE VA FROM A/E FOR ELECTRICAL WORK, SOME OF WHICH REPRESEN…
Mod SA242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$18,978$58,433,399PROVIDE ELECTRICAL COORDINATION DETAILS AND INSTRUCTIONS FOR INSTALLING VARIOUS MISCELLANEOUS SINKS, WATER TRE…
Mod SA243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$5,665$58,439,064DURING INSTALLATION OF THE TEMPORARY SECURITY DESK AND AGAIN FOR THE PERMANENT SECURITY CONSOLE IN THE VA POLI…
Mod SA244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$16,322$58,455,386OVER THE COURSE OF THE PROJECT, THE GENERAL CONTRACTOR ISSUED SEVERAL ELECTRICAL RELATED RFI'S. THE RESPONSE…
Mod SA245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$1,708$58,457,094THE LOCKER ROOMS 1B-186 AND 1B-187 WERE NOT SIZED TO MATCH THE INSTALLED LOCKERS. REVISIONS TO THE WALLS WERE…
Mod SA246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$2,830$58,459,924THE A&E ISSUED MULTIPLE ASI'S, IN WHICH THE REO ISSUED MULTIPLE D#S 037-144 TO THE GENERAL CONTRACTOR TO PROVI…
Mod SA247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$2,346$58,462,270DURING A BUILDING WALK THROUGH WITH THE LOCAL VA PERSONNEL IT WAS NOTICED THAT THE ROOM PRESSURE MONITOR FOR N…
Mod SA249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-06+$10,650$58,472,920THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod SA248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-10+$4,793$58,477,713DURING A BUILDING WALK THROUGH WITH THE LOCAL VA PERSONNEL IT WAS NOTICED THAT THE ROOM PRESSURE MONITOR FOR N…
Mod SA251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-17+$1,551$58,479,264THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod SA253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-17+$2,047$58,481,311THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod SA254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-17+$6,720$58,488,031THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod SA256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-22+$2,882$58,490,913THIS CONTRACT MODIFICATION DEFINITIZES CO-01U DATED 02/17/2012 AND ISSUED FOR $3,780.00; THIS DEFINIZATION INC…
Mod SA257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-22+$17,735$58,508,648THIS CONTRACT MODIFICATION DEFINITIZES CO-01U DATED 02/17/2012 AND ISSUED FOR $3,780.00; THIS DEFINIZATION INC…
Mod SA258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-22+$10,269$58,518,917THIS CONTRACT MODIFICATION DEFINITIZES CO-01U DATED 02/17/2012 AND ISSUED FOR $3,780.00; THIS DEFINIZATION INC…
Mod SA238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-24+$21,610$58,540,527THE ELECTRICAL DRAWINGS WERE MISSING SEVERAL LOCATIONS FOR POWER. THE VARIOUS RFI RESPONSES HEREIN PROVIDED T…
Mod SA259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-25+$28,277$58,568,804THIS CONTRACT MODIFICATION DEFINITIZES CO-01U DATED 02/17/2012 AND ISSUED FOR $3,780.00; THIS DEFINIZATION INC…
Mod SA255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-02+$14,865$58,583,669THIS CONTRACT MODIFICATION DEFINITIZES CO-01U DATED 02/17/2012 AND ISSUED FOR $3,780.00; THIS DEFINIZATION INC…
Mod SA260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-02+$12,291$58,595,960THIS CONTRACT MODIFICATION DEFINITIZES CO-02A DATED 02/17/2012 AND ISSUED FOR $3,569.00; THIS DEFINIZATION INC…
Mod SA261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-02+$8,552$58,604,512THIS CONTRACT MODIFICATION DEFINITIZES CO-01D DATED 03/31/2012 AND ISSUED FOR $2,445.00; THIS DEFINIZATION INC…
Mod SA263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-27+$12,500$58,617,012THIS CONTRACT MODIFICATION DEFINITIZES CO-01D DATED 03/31/2012 AND ISSUED FOR $2,445.00; THIS DEFINIZATION INC…
Mod SA264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-27+$37,210$58,654,222THIS CONTRACT MODIFICATION DEFINITIZES CO-01D DATED 03/31/2012 AND ISSUED FOR $2,445.00; THIS DEFINIZATION INC…
Mod CO02V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-28+$5,660$58,659,882SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod CO02X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-28+$25,000$58,684,882SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod SA266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-05+$7,589$58,692,471THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod SA269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-05+$2,863$58,695,334SEVERAL ASLS WERE ISSUED CHANGING AIR FLOWS IN THE RADIALOGY AREA. HOWEVER, THESE RFIS DID NOT ACCOUNT FOR RES…
Mod CO02Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-21+$20,000$58,715,334SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod CO02Y· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-28+$19,000$58,734,334SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod SA271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-07+$2,621$58,736,955SEVERAL ASLS WERE ISSUED CHANGING AIR FLOWS IN THE RADIALOGY AREA. HOWEVER, THESE RFIS DID NOT ACCOUNT FOR RES…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-16+$3,411$58,740,366SA-272 INSTALL SOFTWARE ON CODE BLUE COMPUTER - AT VA LEE COUNTY OPC, CAPE CORAL, FL - THE VAMC PROVIDED A COD…
Mod CO03A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-17+$5,351$58,745,717SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…
Mod SA267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-28+$20,631$58,766,348LEE COUNTY OUTPATIENT CLINIC, FORT MEYERS, FL TOTAL CONTRACT PRICE IS INCREASED BY $20,631.00 AND 0 CALENDAR…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-31+$2,206$58,768,554SA-270 ADD MED GAS SAFETY SIGNS - VA LEE COUNTY OPC, FL - THE VAMC REQUESTED ADDITIONAL MEDICAL GAS DANGER AND…
Mod P00004· CHANGE ORDER2013-02-14+$15,000$58,783,554CO-03B - DOOR HARDWARE COORDINATION LEVEL - VA LEE COUNTY OPC, CAPE CORAL, FL - A/E REVIEW REVEALED DEFICIENCI…
Mod P00007· CHANGE ORDER2013-02-14+$16,321$58,799,875CO-03B - DOOR HARDWARE COORDINATION LEVEL - VA LEE COUNTY OPC, CAPE CORAL, FL - A/E REVIEW REVEALED DEFICIENCI…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-19+$38,751$58,838,626SA-250 DEF CO-01J RADIOLOGY ROOMS, ELECTRICAL&NON-ARCHITECTURAL MODIFICATIONS
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-20+$19,171$58,857,797SA-277 ERV ADDITION TO RADIOLOGY - AT VA LEE COUNTY OUTPATIENT CLINIC, CAPE CORAL, FL
Mod P00005· CHANGE ORDER2013-02-22+$1,366$58,859,163CO-03B - SIDEWALK EXTENSION FOR IBC EGRESS COMPLIANCE - VA LEE COUNTY OPC, CAPE CORAL, FL - A STATEMENT OF CON…
Mod P00013· CHANGE ORDER2013-03-12+$10,000$58,869,163CO-03D - SIDEWALK SETTLEMENT REMEDIATION - VA LEE COUNTY OPC, CAPE CORAL, FL - THE PEDESTRIAN SIDEWALK ALONG T…
Mod SA262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-21+$615$58,869,778THIS CONTRACT MODIFICATION DEFINITIZES CO-01D DATED 03/31/2012 AND ISSUED FOR $2,445.00; THIS DEFINIZATION INC…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-05−$1,064$58,868,714SA-265 DEF CO-02V ROOM 1A-219 COOLING - BADGING SECURITY AT VALC OPC AT CAPE CORAL, FL
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-15−$1,650$58,867,064SA-265 DEF CO-02V ROOM 1A-219 COOLING - BADGING SECURITY AT VALC OPC AT CAPE CORAL, FL
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-15+$6,370$58,873,434SA-265 DEF CO-02V ROOM 1A-219 COOLING - BADGING SECURITY AT VALC OPC AT CAPE CORAL, FL
Mod P00018· CHANGE ORDER2013-04-24+$2,325$58,875,759SA-276 ELECTRICAL HARDWARE FOR D-070 AT LEE COUNTY OUTPATIENT CLINIC, CAPE CORAL, FL
Mod P00019· CHANGE ORDER2013-04-24−$549$58,875,210SA-278 DELETE UNDERCOUNTER ICE MAKER - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00023· CHANGE ORDER2013-04-29+$5,400$58,880,610SA-285 - INSTALL DX A/C UNIT FOR ELEVATOR ROOM COOLING - VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-30+$98,000$58,978,610SA-282 VARIOUS NEGOTIATED COR'S AT VALC OPC AT CAPE CORAL, FL - A GROUP OF 14 MISCELLANEOUS CORS THAT WERE SET…
Mod P00020· CHANGE ORDER2013-04-30−$7,699$58,970,911SA-280 DEF CO-02R AT LEE COUNTY OUTPATIENT CLINIC, CAPE CORAL, FL THIS CONTRACT MODIFICATION DEFINITIZES CO-02…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-30+$1,007$58,971,918SA-281 DEF CO-03A - SECURITY SYSTEM INDEPENDENT REVIEW TO CONFIRM COMPLIANCES AND IDENTIFY NON-COMPLIANCES WIT…
Mod P00022· CHANGE ORDER2013-04-30−$6,406$58,965,512SA-284 DEF CO-03B DOOR HARDWARE COORDINATION LEVEL 4 AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00017· CHANGE ORDER2013-05-02+$0$58,965,512SA-283 LIGHTING CONTROLS AT VALC OPC AT CAPE CORAL, FL. PROVIDE ALL WORK RELATED TO DOL-008&DOL-021.
Mod P00024· CHANGE ORDER2013-05-03+$7,454$58,972,966SA-275 STONE VENEER, XRAY DISCONNECT SWITCH, RE OFFICE SUPPLIES - MISCELLANEOUS FIELD ISSUES - AT VA LEE COUN…
Mod P00025· CHANGE ORDER2013-05-20+$5,767$58,978,733SA-288 REPLACE MED GAS AIR COMPRESSOR #3 - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00026· CHANGE ORDER2013-05-31+$81,895$59,060,628SA-287 DEFINITIZE CO-03D, SIDEWALK REPLACEMENT AT FRONT - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00031· CHANGE ORDER2013-05-31+$24,000$59,084,628CO-03E - LIGHTING CONTROL SYSTEM SUPPORT LEE COUNTY OUTPATIENT CLINIC, CAPE CORAL, FL
Mod P00028· CHANGE ORDER2013-06-03+$2,539$59,087,167SA-286 ADDITIONAL SIDEWALKS FOR EMERGENCY EGRESS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00029· CHANGE ORDER2013-06-04+$3,686$59,090,853SA-290 REPROGRAM MDF CRAC UNITS LEE COUNTY OUTPATIENT CLINIC, CAPE CORAL, FL
Mod P00030· CHANGE ORDER2013-06-04+$3,905$59,094,758SA-291 CANTEEN DOOR 1A-215B LOCKING MECHANISM - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00027· CHANGE ORDER2013-06-06+$13,712$59,108,470SA-289 ADD WET FIRE SPRINKLERS TO IT MDF ROOM - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00032· CHANGE ORDER2013-06-06−$10,634$59,097,836SA-293 DEF CO-02Y EXTRA SECURITY TRAINING - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00033· CHANGE ORDER2013-06-06−$5,000$59,092,836SA-294 DEF CO-02X RECERTIFY FIRE AND SMOKE SEALS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00034· CHANGE ORDER2013-06-06+$4,241$59,097,077SA-295 FINAL ELECTRIC BILL FOR RE OFFICE TRAILERS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00036· CHANGE ORDER2013-06-06+$8,936$59,106,013SA-292 INSTALL WIDER DOOR FOR VETERAN WITH OVERSIZE WHEELCHAIR ACCESS AT ATRIUM CORRIDOR TO TRAVEL CLERK - AT…
Mod P00037· CHANGE ORDER2013-06-06+$28,533$59,134,546SA-297 DEF CO-01K DELETE INSTALLATION OF VC EQUIPMENT FROM GC SCOPE OF WORK - AT VA LEE COUNTY OPC, CAPE CORAL…
Mod P00035· CHANGE ORDER2013-06-07+$11,534$59,146,080SA-296 REPLACE (2) MED GAS AIR COMPRESSORS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod SA273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-07-17+$12,786$59,158,866SEVERAL ASLS WERE ISSUED CHANGING AIR FLOWS IN THE RADIALOGY AREA. HOWEVER, THESE RFIS DID NOT ACCOUNT FOR RES…
Mod P00039· CHANGE ORDER2013-07-19+$30,645$59,189,511SA-298 BOND PREMIUM - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00040· CHANGE ORDER2013-07-19+$0$59,189,511SA-299 MISC. ELECTRICAL RFIS # 504 THROUGH 568 - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00041· CHANGE ORDER2013-07-19+$27,227$59,216,738SA-300 BOND PREMIUM ADJUSTMENT FOR SUB CONTRACTOR - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00042· CHANGE ORDER2013-07-19+$0$59,216,738SA-301 REVISED SIGNAGE - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00043· CHANGE ORDER2013-07-19+$3,453$59,220,191SA-302 DEF CO-01Q RESTROOM LIGHT MODIFICATION - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00044· CHANGE ORDER2013-08-01+$3,678$59,223,869SA-303 SHOWER TILE SLOPING - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00045· CHANGE ORDER2013-08-14+$2,321$59,226,190SA-305 DEF CO-03E LIGHTING CONTROL SYSTEM TECH SUPPORT - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00046· CHANGE ORDER2013-08-14−$1,627$59,224,563SA-304 ADD MED GAS SIGNS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod P00038· CHANGE ORDER2013-09-20+$14,482$59,239,045SA-274 SPS-SPD RENOVATIONS&HVAC MODS - AT VA LEE COUNTY OPC, CAPE CORAL, FL
Mod SA252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-10-17+$9,543$59,248,588THE GENERAL CONTRACTOR ISSUED SEVERAL RFI'S ELECTRICAL IN NATURE, THE RESPONSE TO WHICH CAUSED A CHANGE ON THE…
Mod CO02U· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-10-22+$1,977$59,250,565SEVERAL AREAS OF THE CLINIC HAVE BEEN IDENTIFIED THAT ARE NOT DESIGNED OR INSTALLED PER VA HVAC DESIGN MANUALS…

Related awards · 2

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI CLMLAQA7UR59)

AwardOffice · PSC / listingNet obligationsFY
VA516C01082516-BAY PINES · N054 · INSTALL OF PREFAB STRUCTURES$6,790FY2010

Other recipients under Y142 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0060HOAR CONSTRUCTION, LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$1,056,046FY2009

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0058_3600_-NONE-_-NONE- · retrieved 2026-09-26.