Description
P00004/SA-232 - ADJUST VENT PIPING, CHECK ALL STEAM TRAPS, ADJUST RE-SET THE TANK FLOATS, REPAIR DAMAGED PUMP CONTROLLER.
Base award description: CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING
Modification chain · 268 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-11-12+$75,802,000= $75,802,000
- Mod SA0352010-01-11-$164,502= $75,637,498
- Mod CO01R2010-03-04+$276,000= $75,913,498
- Mod SA0542010-04-12-$32,000= $75,881,498
- Mod SA0582010-04-19-$875= $75,880,623
- Mod SA0622010-04-29-$164= $75,880,459
- Mod SA0642010-04-30-$3,000= $75,877,459
- Mod CO02A2010-06-17+$38,000= $75,915,459
- Mod CO02B2010-06-17+$14,100= $75,929,559
- Mod CO02C2010-06-22+$2,800= $75,932,359
- Mod SA0782010-06-30-$50,000= $75,882,359
- Mod SA0772010-07-01-$4,400= $75,877,959
- Mod CO01M2010-09-18+$47,395= $75,925,354
- Mod CO01Q2010-09-18+$6,129= $75,931,483
- Mod CO01S2010-09-18+$32,720= $75,964,203
- Mod CO01T2010-09-18+$18,200= $75,982,403
- Mod CO01U2010-09-18+$18,075= $76,000,478
- Mod CO01V2010-09-18+$59,700= $76,060,178
- Mod CO01W2010-09-18+$10,611= $76,070,789
- Mod CO01X2010-09-18+$11,888= $76,082,677
- Mod CO01Y2010-09-18+$39,886= $76,122,563
- Mod CO01Z2010-09-18+$6,325= $76,128,888
- Mod CO02D2010-09-18+$1,628= $76,130,516
- Mod CO02E2010-09-18+$5,000= $76,135,516
- Mod CO02F2010-09-18+$1,367= $76,136,883
- Mod SA0232010-09-18+$2,782= $76,139,665
- Mod SA0252010-09-18+$330= $76,139,995
- Mod SA0272010-09-18+$5,500= $76,145,495
- Mod SA0282010-09-18+$3,177= $76,148,672
- Mod SA0292010-09-18+$3,313= $76,151,985
- Mod SA0302010-09-18+$50,000= $76,201,985
- Mod SA0312010-09-18+$550= $76,202,535
- Mod SA0322010-09-18+$5,000= $76,207,535
- Mod SA0332010-09-18+$0= $76,207,535
- Mod SA0342010-09-18+$0= $76,207,535
- Mod SA0362010-09-18+$1,169= $76,208,704
- Mod SA0372010-09-18+$20,475= $76,229,179
- Mod SA0382010-09-18+$14,823= $76,244,002
- Mod SA0392010-09-18+$9,880= $76,253,882
- Mod SA0402010-09-18+$8,000= $76,261,882
- Mod SA0412010-09-18+$1,574= $76,263,456
- Mod SA0422010-09-18+$2,367= $76,265,823
- Mod SA0432010-09-18+$1,533= $76,267,356
- Mod SA0442010-09-18+$2,919= $76,270,275
- Mod SA0452010-09-18+$7,700= $76,277,975
- Mod SA0462010-09-18+$19,446= $76,297,421
- Mod SA0472010-09-18+$5,674= $76,303,095
- Mod SA0482010-09-18+$57,800= $76,360,895
- Mod SA0492010-09-18+$3,360= $76,364,255
- Mod SA0502010-09-18+$7,805= $76,372,060
- Mod SA0512010-09-18+$3,290= $76,375,350
- Mod SA0522010-09-18+$18,400= $76,393,750
- Mod SA0532010-09-18+$32,000= $76,425,750
- Mod SA0552010-09-18+$1,400= $76,427,150
- Mod SA0562010-09-18+$10,589= $76,437,739
- Mod SA0572010-09-18+$28,488= $76,466,227
- Mod SA0592010-09-18+$6,600= $76,472,827
- Mod SA0602010-09-18+$2,846= $76,475,673
- Mod SA0612010-09-18+$3,581= $76,479,254
- Mod SA0632010-09-18+$4,000= $76,483,254
- Mod SA0652010-09-18+$3,529= $76,486,783
- Mod SA0662010-09-18+$0= $76,486,783
- Mod SA0672010-09-18+$13,007= $76,499,790
- Mod SA0682010-09-18+$0= $76,499,790
- Mod SA0692010-09-18+$4,378= $76,504,168
- Mod SA0702010-09-18+$1,150= $76,505,318
- Mod SA0712010-09-18+$1,900= $76,507,218
- Mod SA0722010-09-18+$3,771= $76,510,989
- Mod SA0732010-09-18+$252= $76,511,241
- Mod SA0742010-09-18+$3,790= $76,515,031
- Mod SA0752010-09-18+$8,000= $76,523,031
- Mod SA0762010-09-18+$17,000= $76,540,031
- Mod SA0792010-09-18+$2,605= $76,542,636
- Mod SA0802010-09-18+$35,000= $76,577,636
- Mod SA0812010-09-18+$64,911= $76,642,547
- Mod SA0822010-09-18+$0= $76,642,547
- Mod SA0832010-09-18+$1,714= $76,644,261
- Mod SA0842010-09-18+$3,500= $76,647,761
- Mod SA0852010-09-18+$300= $76,648,061
- Mod SA0862010-09-18+$4,153= $76,652,214
- Mod SA0872010-09-18+$4,500= $76,656,714
- Mod SA0882010-09-18+$20,932= $76,677,646
- Mod SA0892010-09-18+$0= $76,677,646
- Mod SA0902010-09-18+$3,187= $76,680,833
- Mod SA0912010-09-18+$12,314= $76,693,147
- Mod SA0922010-09-18+$10,000= $76,703,147
- Mod SA0932010-09-18+$0= $76,703,147
- Mod SA0942010-09-18+$1,725= $76,704,872
- Mod SA0952010-09-18+$1,092= $76,705,964
- Mod SA0962010-09-18+$11,000= $76,716,964
- Mod SA0972010-09-18+$1,755= $76,718,719
- Mod SA0982010-09-21+$15,500= $76,734,219
- Mod SA0992010-09-21+$29,175= $76,763,394
- Mod SA1002010-09-21+$3,251= $76,766,645
- Mod CO01N2010-09-22+$30,600= $76,797,245
- Mod CO01P2010-09-30+$98,000= $76,895,245
- Mod CO02H2010-09-30+$3,600= $76,898,845
- Mod SA1012010-09-30+$15,467= $76,914,312
- Mod SA1022010-09-30+$4,102= $76,918,414
- Mod SA1042010-12-15+$4,750= $76,923,164
- Mod SA1062010-12-20+$1,914= $76,925,078
- Mod SA1072010-12-20+$990= $76,926,068
- Mod SA1082010-12-20+$15,580= $76,941,648
- Mod SA1092010-12-20+$17,000= $76,958,648
- Mod SA1122010-12-20+$1,100= $76,959,748
- Mod SA1132010-12-22+$6,800= $76,966,548
- Mod SA1032010-12-29+$4,899= $76,971,447
- Mod SA1142011-01-27+$56,855= $77,028,302
- Mod SA1162011-01-27+$8,605= $77,036,907
- Mod SA1182011-01-27-$1,450= $77,035,457
- Mod SA1202011-01-27-$499= $77,034,958
- Mod SA1222011-01-27-$442= $77,034,516
- Mod CO02K2011-02-06+$2,200= $77,036,716
- Mod CO02N2011-02-06+$2,500= $77,039,216
- Mod SA1052011-02-06+$14,614= $77,053,830
- Mod SA1292011-02-07-$300= $77,053,530
- Mod CO02M2011-02-08+$16,000= $77,069,530
- Mod CO02P2011-02-08+$4,900= $77,074,430
- Mod SA1432011-03-18+$4,280= $77,078,710
- Mod CO02Q2011-03-22+$16,700= $77,095,410
- Mod CO02X2011-03-22+$1,200= $77,096,610
- Mod SA1312011-03-22+$518,000= $77,614,610
- Mod SA1322011-03-22+$1,984= $77,616,594
- Mod SA1332011-03-22+$3,346= $77,619,940
- Mod SA1342011-03-22+$2,000= $77,621,940
- Mod CO02Y2011-04-11-$6,321= $77,615,619
- Mod SA1382011-04-11-$25,708= $77,589,911
- Mod SA1392011-04-11-$232= $77,589,679
- Mod SA1402011-04-11+$5,898= $77,595,577
- Mod SA1412011-04-11+$2,767= $77,598,344
- Mod SA1462011-04-11+$384= $77,598,728
- Mod SA1482011-04-11+$6,165= $77,604,893
- Mod SA1442011-04-13+$783= $77,605,676
- Mod SA1452011-04-13+$2,519= $77,608,195
- Mod CO02O2011-05-03+$4,536= $77,612,731
- Mod CO02T2011-05-03+$2,030= $77,614,761
- Mod CO02U2011-05-03+$7,000= $77,621,761
- Mod CO03A2011-05-03+$16,900= $77,638,661
- Mod SA1492011-05-03-$10,515= $77,628,146
- Mod SA1502011-05-03+$2,500= $77,630,646
- Mod SA1532011-05-09+$426= $77,631,072
- Mod SA1542011-05-09+$3,374= $77,634,446
- Mod SA1552011-05-09+$1,650= $77,636,096
- Mod SA1512011-05-10+$1,019= $77,637,115
- Mod SA1522011-05-10+$2,365= $77,639,480
- Mod CO02L2011-05-16+$21,895= $77,661,375
- Mod CO02R2011-05-16+$22,000= $77,683,375
- Mod CO02S2011-05-16+$19,580= $77,702,955
- Mod SA1152011-05-16+$13,602= $77,716,557
- Mod SA1172011-05-16+$6,981= $77,723,538
- Mod SA1232011-05-16+$19,800= $77,743,338
- Mod SA1272011-05-16+$2,000= $77,745,338
- Mod SA1302011-05-16+$766= $77,746,104
- Mod SA1352011-05-16+$14,419= $77,760,523
- Mod SA1362011-05-16+$1,473= $77,761,996
- Mod SA1372011-05-16+$4,074= $77,766,070
- Mod CO02V2011-05-18+$22,216= $77,788,286
- Mod SA1702011-06-22-$88,200= $77,700,086
- Mod CO03E2011-07-25-$9,200= $77,690,886
- Mod SA1642011-07-25+$8,159= $77,699,045
- Mod SA1662011-07-25+$3,410= $77,702,455
- Mod SA1672011-07-25+$36,294= $77,738,749
- Mod SA1682011-07-25+$1,164= $77,739,913
- Mod SA1692011-07-26-$6,153= $77,733,760
- Mod CO03N2011-08-02+$4,699= $77,738,459
- Mod CO03F2011-08-15+$11,492= $77,749,951
- Mod CO03G2011-08-15+$300= $77,750,251
- Mod CO02Z2011-08-17+$1,010= $77,751,261
- Mod CO03D2011-08-17+$35,000= $77,786,261
- Mod SA1622011-08-17+$1,224= $77,787,485
- Mod SA1632011-08-17+$7,453= $77,794,938
- Mod SA1572011-08-18-$6,154= $77,788,784
- Mod SA1582011-08-18+$2,850= $77,791,634
- Mod SA1592011-08-18-$15,000= $77,776,634
- Mod SA1602011-08-18+$3,312= $77,779,946
- Mod CO03H2011-08-23+$9,862= $77,789,808
- Mod SA1732011-08-23+$2,866= $77,792,674
- Mod SA1742011-08-23-$24= $77,792,650
- Mod CO03I2011-08-30+$3,400= $77,796,050
- Mod CO03J2011-08-30+$6,000= $77,802,050
- Mod CO03K2011-08-30+$6,213= $77,808,263
- Mod CO03O2011-08-30+$950= $77,809,213
- Mod CO03P2011-08-30+$3,500= $77,812,713
- Mod CO03Q2011-08-30+$1,200= $77,813,913
- Mod CO03R2011-08-30+$13,550= $77,827,463
- Mod SA1722011-08-30-$19,031= $77,808,432
- Mod SA1752011-08-30+$1,449= $77,809,881
- Mod SA1762011-08-30+$13,515= $77,823,396
- Mod SA1782011-08-30+$5,018= $77,828,414
- Mod SA1792011-08-30+$9,376= $77,837,790
- Mod SA1842011-08-31+$2,036= $77,839,826
- Mod CO02I2011-09-06+$2,950= $77,842,776
- Mod CO02W2011-09-06+$41,337= $77,884,113
- Mod CO03B2011-09-06+$9,894= $77,894,007
- Mod CO03C2011-09-06+$2,500= $77,896,507
- Mod CO03L2011-09-06+$6,099= $77,902,606
- Mod CO03M2011-09-06+$617= $77,903,223
- Mod SA1712011-09-06-$79= $77,903,144
- Mod SA1772011-09-06+$723= $77,903,867
- Mod SA1802011-09-06+$1,905= $77,905,772
- Mod SA1812011-09-06+$1,073= $77,906,845
- Mod SA1822011-09-06+$6,784= $77,913,629
- Mod SA1102011-09-12-$1,724= $77,911,905
- Mod SA1112011-09-12-$17,813= $77,894,092
- Mod SA1192011-09-12-$11,475= $77,882,617
- Mod SA1212011-09-12+$24,061= $77,906,678
- Mod SA1242011-09-12+$0= $77,906,678
- Mod SA1252011-09-12+$1,797= $77,908,475
- Mod SA1612011-09-12+$2,666= $77,911,141
- Mod SA1652011-09-12+$897= $77,912,038
- Mod SA1832011-09-12+$4,321= $77,916,359
- Mod SA1262011-09-13+$2,454= $77,918,813
- Mod SA1282011-09-13+$887= $77,919,700
- Mod SA1422011-09-15+$2,500= $77,922,200
- Mod SA1472011-09-15+$920= $77,923,120
- Mod SA1562011-09-15+$43,216= $77,966,336
- Mod SA1852011-09-15+$2,778= $77,969,114
- Mod SA1862011-09-15+$2,000= $77,971,114
- Mod SA1872011-09-21+$3,824= $77,974,938
- Mod SA1882011-09-27+$2,000= $77,976,938
- Mod SA1892011-09-27+$0= $77,976,938
- Mod SA1912011-09-29+$11,236= $77,988,174
- Mod SA1922011-09-29+$645= $77,988,819
- Mod SA1932011-09-29+$1,884= $77,990,703
- Mod SA1942011-09-29+$2,195= $77,992,898
- Mod SA1902011-09-30-$46,955= $77,945,943
- Mod SA1952011-09-30+$4,787= $77,950,730
- Mod SA1962011-09-30+$674= $77,951,404
- Mod SA1972011-09-30+$45,000= $77,996,404
- Mod SA1982011-10-12+$1,652= $77,998,056
- Mod SA2002011-10-13+$0= $77,998,056
- Mod SA2012011-10-14+$17,493= $78,015,549
- Mod SA1992011-10-21+$1,275= $78,016,824
- Mod SA2032011-10-21-$19,486= $77,997,338
- Mod SA2042011-10-21+$20,323= $78,017,661
- Mod SA2052011-10-21+$964= $78,018,625
- Mod SA2062011-10-26+$10,120= $78,028,745
- Mod SA2082011-10-28+$4,388= $78,033,133
- Mod SA2072011-11-21+$3,336= $78,036,469
- Mod SA2092011-11-22+$1,808= $78,038,277
- Mod SA2102011-11-22+$763= $78,039,040
- Mod CO03S2011-11-29+$67,735= $78,106,775
- Mod SA2112011-11-29+$3,764= $78,110,539
- Mod CO03T2011-11-30+$10,530= $78,121,069
- Mod CO03U2011-11-30+$61,000= $78,182,069
- Mod SA2122011-11-30+$6,135= $78,188,204
- Mod SA2132011-11-30+$10,440= $78,198,644
- Mod SA2142011-12-13+$2,097= $78,200,741
- Mod SA2152011-12-21+$6,000= $78,206,741
- Mod SA2162011-12-21+$2,970= $78,209,711
- Mod SA2172011-12-21+$1,001= $78,210,712
- Mod SA2182011-12-21+$0= $78,210,712
- Mod SA2192011-12-21+$1,138= $78,211,850
- Mod SA2202011-12-21+$18,000= $78,229,850
- Mod SA2212011-12-21+$26,000= $78,255,850
- Mod SA2222011-12-21+$23,864= $78,279,714
- Mod SA2022012-01-09+$14,200= $78,293,914
- Mod SA2232012-01-19+$5,714= $78,299,628
- Mod SA2242012-02-09+$1,000= $78,300,628
- Mod SA2252012-02-13+$27,764= $78,328,392
- Mod SA2272012-05-04+$495= $78,328,887
- Mod CO03V2012-05-11+$39,084= $78,367,971
- Mod CO03W2012-07-20+$2,962= $78,370,933
- Mod SA2282012-11-02-$17,403= $78,353,530
- Mod SA2292012-11-02+$29,251= $78,382,781
- Mod SA2302012-11-20+$15,123= $78,397,904
- Mod P000032013-07-25+$6,635= $78,404,539
- Mod P000042013-11-26+$7,629= $78,412,168
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-11-12 | +$75,802,000 | $75,802,000 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-11 | −$164,502 | $75,637,498 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-035 |
| Mod CO01R· CHANGE ORDER | 2010-03-04 | +$276,000 | $75,913,498 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01R |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-12 | −$32,000 | $75,881,498 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-054 |
| Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-19 | −$875 | $75,880,623 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-058 |
| Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-29 | −$164 | $75,880,459 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-062 |
| Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-30 | −$3,000 | $75,877,459 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-064 |
| Mod CO02A· CHANGE ORDER | 2010-06-17 | +$38,000 | $75,915,459 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02A |
| Mod CO02B· CHANGE ORDER | 2010-06-17 | +$14,100 | $75,929,559 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02B |
| Mod CO02C· CHANGE ORDER | 2010-06-22 | +$2,800 | $75,932,359 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02C |
| Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | −$50,000 | $75,882,359 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-078 |
| Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-01 | −$4,400 | $75,877,959 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-077 |
| Mod CO01M· CHANGE ORDER | 2010-09-18 | +$47,395 | $75,925,354 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01M |
| Mod CO01Q· CHANGE ORDER | 2010-09-18 | +$6,129 | $75,931,483 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01Q |
| Mod CO01S· CHANGE ORDER | 2010-09-18 | +$32,720 | $75,964,203 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01S |
| Mod CO01T· CHANGE ORDER | 2010-09-18 | +$18,200 | $75,982,403 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01T |
| Mod CO01U· CHANGE ORDER | 2010-09-18 | +$18,075 | $76,000,478 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01U |
| Mod CO01V· CHANGE ORDER | 2010-09-18 | +$59,700 | $76,060,178 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01V |
| Mod CO01W· CHANGE ORDER | 2010-09-18 | +$10,611 | $76,070,789 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01W |
| Mod CO01X· CHANGE ORDER | 2010-09-18 | +$11,888 | $76,082,677 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01X |
| Mod CO01Y· CHANGE ORDER | 2010-09-18 | +$39,886 | $76,122,563 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01Y |
| Mod CO01Z· CHANGE ORDER | 2010-09-18 | +$6,325 | $76,128,888 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01Z |
| Mod CO02D· CHANGE ORDER | 2010-09-18 | +$1,628 | $76,130,516 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02D |
| Mod CO02E· CHANGE ORDER | 2010-09-18 | +$5,000 | $76,135,516 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02E |
| Mod CO02F· CHANGE ORDER | 2010-09-18 | +$1,367 | $76,136,883 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02F |
| Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$2,782 | $76,139,665 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-023 |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$330 | $76,139,995 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-025 |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$5,500 | $76,145,495 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-027 |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,177 | $76,148,672 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-028 |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,313 | $76,151,985 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-029 |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$50,000 | $76,201,985 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-030 |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$550 | $76,202,535 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-031 |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$5,000 | $76,207,535 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-032 |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,207,535 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-033 |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,207,535 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-034 |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,169 | $76,208,704 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-036 |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$20,475 | $76,229,179 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-037 |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$14,823 | $76,244,002 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-038 |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$9,880 | $76,253,882 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-039 |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$8,000 | $76,261,882 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-040 |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,574 | $76,263,456 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-041 |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$2,367 | $76,265,823 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-042 |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,533 | $76,267,356 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-043 |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$2,919 | $76,270,275 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-044 |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$7,700 | $76,277,975 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-045 |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$19,446 | $76,297,421 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-046 |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$5,674 | $76,303,095 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-047 |
| Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$57,800 | $76,360,895 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-048 |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,360 | $76,364,255 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-049 |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$7,805 | $76,372,060 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-050 |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,290 | $76,375,350 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-051 |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$18,400 | $76,393,750 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-052 |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$32,000 | $76,425,750 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-053 |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,400 | $76,427,150 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-055 |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$10,589 | $76,437,739 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-056 |
| Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$28,488 | $76,466,227 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-057 |
| Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$6,600 | $76,472,827 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-059 |
| Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$2,846 | $76,475,673 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-060 |
| Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,581 | $76,479,254 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-061 |
| Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$4,000 | $76,483,254 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-063 |
| Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,529 | $76,486,783 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-065 |
| Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,486,783 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-066 |
| Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$13,007 | $76,499,790 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-067 |
| Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,499,790 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-068 |
| Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$4,378 | $76,504,168 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-069 |
| Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,150 | $76,505,318 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-070 |
| Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,900 | $76,507,218 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-071 |
| Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,771 | $76,510,989 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-072 |
| Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$252 | $76,511,241 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-073 |
| Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,790 | $76,515,031 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-074 |
| Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$8,000 | $76,523,031 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-075 |
| Mod SA076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$17,000 | $76,540,031 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-076 |
| Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$2,605 | $76,542,636 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-079 |
| Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$35,000 | $76,577,636 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-080 |
| Mod SA081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$64,911 | $76,642,547 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-081 |
| Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,642,547 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-082 |
| Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,714 | $76,644,261 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-083 |
| Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,500 | $76,647,761 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-084 |
| Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$300 | $76,648,061 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-085 |
| Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$4,153 | $76,652,214 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-086 |
| Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$4,500 | $76,656,714 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-087 |
| Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$20,932 | $76,677,646 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-088 |
| Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,677,646 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-089 |
| Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$3,187 | $76,680,833 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-090 |
| Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$12,314 | $76,693,147 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-091 |
| Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$10,000 | $76,703,147 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-092 |
| Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $76,703,147 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-093 |
| Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,725 | $76,704,872 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-094 |
| Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,092 | $76,705,964 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-095 |
| Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$11,000 | $76,716,964 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-096 |
| Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$1,755 | $76,718,719 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-097 |
| Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-21 | +$15,500 | $76,734,219 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-098 |
| Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-21 | +$29,175 | $76,763,394 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-099 |
| Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-21 | +$3,251 | $76,766,645 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-100 |
| Mod CO01N· CHANGE ORDER | 2010-09-22 | +$30,600 | $76,797,245 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01N |
| Mod CO01P· CHANGE ORDER | 2010-09-30 | +$98,000 | $76,895,245 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-01P |
| Mod CO02H· CHANGE ORDER | 2010-09-30 | +$3,600 | $76,898,845 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02H |
| Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-30 | +$15,467 | $76,914,312 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-101 |
| Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-30 | +$4,102 | $76,918,414 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-102 |
| Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-15 | +$4,750 | $76,923,164 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-104 |
| Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$1,914 | $76,925,078 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-106 |
| Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$990 | $76,926,068 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-107 |
| Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$15,580 | $76,941,648 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-108 |
| Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$17,000 | $76,958,648 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-109 |
| Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$1,100 | $76,959,748 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-112 |
| Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-22 | +$6,800 | $76,966,548 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-113 |
| Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-29 | +$4,899 | $76,971,447 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-103 |
| Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | +$56,855 | $77,028,302 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-114 |
| Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | +$8,605 | $77,036,907 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-116 |
| Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | −$1,450 | $77,035,457 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-114 |
| Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | −$499 | $77,034,958 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-120 |
| Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | −$442 | $77,034,516 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-122 |
| Mod CO02K· CHANGE ORDER | 2011-02-06 | +$2,200 | $77,036,716 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02H |
| Mod CO02N· CHANGE ORDER | 2011-02-06 | +$2,500 | $77,039,216 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02N |
| Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-06 | +$14,614 | $77,053,830 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-105 |
| Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-07 | −$300 | $77,053,530 | SA-129 DURING REVIEW OF RFI #879 IT WAS IDENTIFIED THAT THE DATA CABLE RUNS FROM THE EAST SIDE OFFICES OF THE… |
| Mod CO02M· CHANGE ORDER | 2011-02-08 | +$16,000 | $77,069,530 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02M |
| Mod CO02P· CHANGE ORDER | 2011-02-08 | +$4,900 | $77,074,430 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02P |
| Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-18 | +$4,280 | $77,078,710 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-143 |
| Mod CO02Q· CHANGE ORDER | 2011-03-22 | +$16,700 | $77,095,410 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02Q |
| Mod CO02X· CHANGE ORDER | 2011-03-22 | +$1,200 | $77,096,610 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02X |
| Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-22 | +$518,000 | $77,614,610 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-131 |
| Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-22 | +$1,984 | $77,616,594 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-132 |
| Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-22 | +$3,346 | $77,619,940 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-133 |
| Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-22 | +$2,000 | $77,621,940 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-134 |
| Mod CO02Y· CHANGE ORDER | 2011-04-11 | −$6,321 | $77,615,619 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02Y |
| Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | −$25,708 | $77,589,911 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-138 |
| Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | −$232 | $77,589,679 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-139 |
| Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | +$5,898 | $77,595,577 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-140 |
| Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | +$2,767 | $77,598,344 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-141 |
| Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | +$384 | $77,598,728 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-146 |
| Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | +$6,165 | $77,604,893 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-148 |
| Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-13 | +$783 | $77,605,676 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-144 |
| Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-13 | +$2,519 | $77,608,195 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-145 |
| Mod CO02O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$4,536 | $77,612,731 | THE DUCTWORK AND OTHER ASSOCIATED ABOVE CEILING ITEMS WOULD NOT FIT ABOVE THE CEILING IN LOBBY AREA 1M100 AT T… |
| Mod CO02T· CHANGE ORDER | 2011-05-03 | +$2,030 | $77,614,761 | THE SPARE CONDUIT FOR THE TELEPHONE CABLES WAS USED TO INSTALL A 300 PAIR CABLE (PER THE VAMC REQUEST). TO PR… |
| Mod CO02U· CHANGE ORDER | 2011-05-03 | +$7,000 | $77,621,761 | THE IDF CLOSET 1N162 CONTAINS COMPUTER EQUIPMENT CRITICAL TO THE FUNCTION OF THE HOSPITAL AND WILL NOT BE SUFF… |
| Mod CO03A· CHANGE ORDER | 2011-05-03 | +$16,900 | $77,638,661 | ACTUAL BUILDING EXPANSION JOINT IS AT EXISTING COLUMN LINE 33, NOT AS SHOWN ON SHT AS1-123. THIS LOCATION REQU… |
| Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | −$10,515 | $77,628,146 | THE CONTRACT DRAWINGS AND PREVIOUS RFP D#18 LIFE SAFETY DRAWINGS SHOW A NUMBER OF LOCATIONS WHERE FULLY RECESS… |
| Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$2,500 | $77,630,646 | DURING RENOVATION OF THE LOBBY A BUSS DUCT WAS IDENTIFIED INSIDE THE WALL OF THE EXISTING FIRE COMMAND ROOM, T… |
| Mod SA153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | +$426 | $77,631,072 | SA-153 THE SPARE CONDUIT FOR THE TELEPHONE CABLES WAS USED TO INSTALL A 300 PAIR CABLE. IN ORDER TO PROVIDE SP… |
| Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | +$3,374 | $77,634,446 | SA-154 RFI 881 IDENTIFIED THE LACK OF COORDINATION OF THE TYPE OF LIGHT TO BE USED IN THE LOBBY OF THE PASSEN… |
| Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | +$1,650 | $77,636,096 | SA-155 RFI 867 WAS ISSUED REGARDING THE HINGED FRAME FOR THE LARGE STAINED GLASS WINDOW. THE LARGE STAINED GLA… |
| Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-10 | +$1,019 | $77,637,115 | SA-151 THE DESIGN OF THE VIDEO STUDIO ROOM DID NOT INCORPORATE THE ELECTRICAL, HVAC, FLOORING, LIGHTING AND FI… |
| Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-10 | +$2,365 | $77,639,480 | CONTRACT DRAWINGS DID NOT IDENTIFY THE APPROPRIATE NUMBER OF DOOR OPERATORS. THIS CHANGE WILL INSTALL EIGHT DO… |
| Mod CO02L· CHANGE ORDER | 2011-05-16 | +$21,895 | $77,661,375 | CO-02L THE DESIGN OF THE VIDEO STUDIO ROOM DID NOT INCORPORATE THE ELECTRICAL, HVAC, FLOORING, LIGHTING AND FI… |
| Mod CO02R· CHANGE ORDER | 2011-05-16 | +$22,000 | $77,683,375 | CO-02R CONTRACT DRAWINGS FAILED TO IDENTIFY THE DOOR OPERATORS. THIS CHANGE WILL INSTALL EIGHT (8) DOOR OPERAT… |
| Mod CO02S· CHANGE ORDER | 2011-05-16 | +$19,580 | $77,702,955 | CO-02S DRAWING OF EAST-WEST COLONNADE LIMESTONE ELEVATION WAS NOT COORDINATED WITH THE STRUCTURAL STEEL DRAWI… |
| Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$13,602 | $77,716,557 | SA-115 SINKS WERE CHANGED FROM CENTER DRAIN SINKS TO REAR DRAIN SINKS SO ADEQUATE UNDER SINK SPACE WOULD BE AV… |
| Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$6,981 | $77,723,538 | SA-117 THE CONTRACT DOCUMENTS DID NOT INCLUDE VENTING FOR DRYERS ON LEVELS 3, 4 AND 5. |
| Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$19,800 | $77,743,338 | SA-123 THE CHINA SINK SHROUD SPECIFIED FOR THIS PROJECT WAS NOT LARGE ENOUGH TO ENCLOSE THE P-TRAP, MIXING VAL… |
| Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$2,000 | $77,745,338 | SA-127 DUE TO STRUCTURAL STEEL CONFLICTS IN THE CONTRACT DOCUMENTS, THE FINAL LOCATION OF THE DECK PENETRATION… |
| Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$766 | $77,746,104 | SA-130 THE INWALL SPACE BETWEEN ROOMS 2M249 AND 2M250 IS NOT LARGE ENOUGH TO ACCOMMODATE BACK TO BACK SINK CAR… |
| Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$14,419 | $77,760,523 | SA-135 THE CABINETS WERE SEPARATED INTO TWO CABINETS TO ACCOMMODATE THE SOLID INTERCEPTOR IN ACTIVITY ROOMS ON… |
| Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$1,473 | $77,761,996 | SA-136 CDS SHOW THE 3 WAY VALVE ON THE 3FL, HOWEVER THE 4FL AND 5FL DRAWINGS SHOW ONLY 2 WAY VALVES AT THE END… |
| Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$4,074 | $77,766,070 | SA-136 DISCUSSIONS ON THE PROJECT AND A REPLY TO RFI'S #429 DIRECTED THE CONTRACTOR TO LOWER THE CEILINGS IN R… |
| Mod CO02V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-18 | +$22,216 | $77,788,286 | THE EXISTING BATHROOMS 1C118 AND 1C119 ARE LOCATED WITHIN THE SPACE TO BE RENOVATED. THE A/E DID NOT INCLUDE… |
| Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-22 | −$88,200 | $77,700,086 | DURING REVIEW OF SPEC. SECTION 14210 FOR THE ELEVATORS THE VA IDENTIFIED THAT EXTENDED MAINTENANCE WAS INCLUDE… |
| Mod CO03E· CHANGE ORDER | 2011-07-25 | −$9,200 | $77,690,886 | RFIS #935 AND #936 ADDRESSED THE NEED TO DETERMINE ROUTING FOR DUCTWORK ABOVE THE EXISTING LOBBY SPACE IN BLDG… |
| Mod SA164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$8,159 | $77,699,045 | THE DRAWINGS DID NOT PROVIDE REINFORCING DETAILS FOR THE FOUNTAIN AND PLANTER. |
| Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$3,410 | $77,702,455 | THE DUCTWORK AND OTHER ASSOCIATED CEILING ITEMS WOULD NOT FIT ABOVE THE CEILING IN LOBBY AREA 1M100 AT THE CEI… |
| Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$36,294 | $77,738,749 | THE VAMC DIRECTOR REQUESTED A VA SEAL BE PLACED IN THE LOBBY OF THE NEW CB#29 MAIN LOBBY. |
| Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$1,164 | $77,739,913 | THE VAMC REQUESTED THAT THE MAIN ACCESS DRIVE TO THE PARKING GARAGE REMAIN AS ONE WAY IN LIEU OF BEING CHANGE… |
| Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-26 | −$6,153 | $77,733,760 | RFI 429 ADDED A 18 X 12 SUPPLY DUCT UNDER STAIR #M5 TO SUPPLY AIR TO THE AREA OF THE LOBBY EAST OF STAIR #M5.… |
| Mod CO03N· CHANGE ORDER | 2011-08-02 | +$4,699 | $77,738,459 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03N |
| Mod CO03F· CHANGE ORDER | 2011-08-15 | +$11,492 | $77,749,951 | THE CAP PIECE ON THE SELF COVING SHEET RUBBER IS HELD IN PLACE BY DOUBLE FACE PAPER TAPE. SECURITY SEALANT WIL… |
| Mod CO03G· CHANGE ORDER | 2011-08-15 | +$300 | $77,750,251 | DURING REVIEW OF THE FUEL PIPING OF THE GENERATOR IT WAS NOTED THAT THE FUEL LINE HAS NO ISOLATION VALVE. THIS… |
| Mod CO02Z· CHANGE ORDER | 2011-08-17 | +$1,010 | $77,751,261 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02Z |
| Mod CO03D· CHANGE ORDER | 2011-08-17 | +$35,000 | $77,786,261 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-03D |
| Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-17 | +$1,224 | $77,787,485 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-162 |
| Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-17 | +$7,453 | $77,794,938 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-163 |
| Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | −$6,154 | $77,788,784 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-157 |
| Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$2,850 | $77,791,634 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-158 |
| Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | −$15,000 | $77,776,634 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-159 |
| Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$3,312 | $77,779,946 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, SA-160 |
| Mod CO03H· CHANGE ORDER | 2011-08-23 | +$9,862 | $77,789,808 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-03H |
| Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | +$2,866 | $77,792,674 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-173 |
| Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | −$24 | $77,792,650 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-174 |
| Mod CO03I· CHANGE ORDER | 2011-08-30 | +$3,400 | $77,796,050 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA |
| Mod CO03J· CHANGE ORDER | 2011-08-30 | +$6,000 | $77,802,050 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03J |
| Mod CO03K· CHANGE ORDER | 2011-08-30 | +$6,213 | $77,808,263 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03K |
| Mod CO03O· CHANGE ORDER | 2011-08-30 | +$950 | $77,809,213 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03O |
| Mod CO03P· CHANGE ORDER | 2011-08-30 | +$3,500 | $77,812,713 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03P |
| Mod CO03Q· CHANGE ORDER | 2011-08-30 | +$1,200 | $77,813,913 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03Q |
| Mod CO03R· CHANGE ORDER | 2011-08-30 | +$13,550 | $77,827,463 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03R |
| Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | −$19,031 | $77,808,432 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-172 |
| Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$1,449 | $77,809,881 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-175 |
| Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$13,515 | $77,823,396 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-176 |
| Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$5,018 | $77,828,414 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-178 |
| Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$9,376 | $77,837,790 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-179 |
| Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$2,036 | $77,839,826 | CONTRACT DRAWING AS1-101 IS SHOWN AS A TYPE B WALL A THE SOUTH END OF THE MEN'S LOCKER ROOM. GIVEN THE EXISTIN… |
| Mod CO02I· CHANGE ORDER | 2011-09-06 | +$2,950 | $77,842,776 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02I |
| Mod CO02W· CHANGE ORDER | 2011-09-06 | +$41,337 | $77,884,113 | CARES CONSOLIDATION PHASE 2 MENTAL HEALTH BUILDING, CO-02W |
| Mod CO03B· CHANGE ORDER | 2011-09-06 | +$9,894 | $77,894,007 | PITTSBURGH MENTAL HEALTH CLINIC CO-03B |
| Mod CO03C· CHANGE ORDER | 2011-09-06 | +$2,500 | $77,896,507 | PITTSBURGH MENTAL HEALTH CLINIC CO-03C |
| Mod CO03L· CHANGE ORDER | 2011-09-06 | +$6,099 | $77,902,606 | DURING INITIAL TESTING OF THE GENERATOR THE OUTSIDE AIR LOUVERS OF GENERATOR ROOM WERE NOT ADJUSTED TO OPEN ON… |
| Mod CO03M· CHANGE ORDER | 2011-09-06 | +$617 | $77,903,223 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA CO-03M |
| Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | −$79 | $77,903,144 | MENTAL HEALTH PAVILLION BLDG 29, PITTSBURGH, PA |
| Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | +$723 | $77,903,867 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-177 |
| Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | +$1,905 | $77,905,772 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-180 |
| Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | +$1,073 | $77,906,845 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-181 |
| Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | +$6,784 | $77,913,629 | MENTAL HEALTH PAVILLION BLDG 29 PITTSBURGH, PA SA-182 |
| Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | −$1,724 | $77,911,905 | THE FLOOR PLANS SHOW HANDRAILS HR-1 ON THE 3RD, 4TH AND 5TH FLOORS SOUTH WALL OF CORRIDOR XMC104. THIS IS THE… |
| Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | −$17,813 | $77,894,092 | PER RFP D#76 ISSUED ON 8/25/10 DELETE CASEWORK IN 2ND FLOOR ROOMS 2M239, 2M240, 2M264, 2M265, 2M266, 2M269, 2M… |
| Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | −$11,475 | $77,882,617 | COORDINATE EXTERIOR COLORS. |
| Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$24,061 | $77,906,678 | ALL COUNTERTOPS IN CB #29 WERE DESIGNED TO BE SOLID SURFACE COUNTERTOPS; SEVERAL LOCATIONS WERE IDENTIFIED AS… |
| Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$0 | $77,906,678 | DURING THE REVIEW OF RFI 849 IT WAS IDENTIFIED THAT THE ROOM HAS NO LIGHTING FIXTURES SPECIFIED. THIS CHANGE W… |
| Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$1,797 | $77,908,475 | DURING REVIEW OF THE NURSE CALL STATIONS COVER PLATE SUBMITTAL IT WAS IDENTIFIED THAT THE STATIONS ARE NOT FLU… |
| Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$2,666 | $77,911,141 | RFI #802 QUESTIONED THE TOP ELEVATIONS ON A PORTION OF THE BRICK ACCENT WALL ALONG THE EAST SIDE OF THE BUILDI… |
| Mod SA165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$897 | $77,912,038 | ACTUAL BUILDING EXPANSION JOINT IS AT EXISTING COLUMN LINE 33, NOT AS SHOWN ON SHT AS1-123. THIS LOCATION REQ… |
| Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$4,321 | $77,916,359 | DURING REVIEW OF RFI #248 IT WAS DISCOVERED THAT SOME OF THE TOILET ACCESSORIES SPECIFIED WERE NOT SUITABLE FO… |
| Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-13 | +$2,454 | $77,918,813 | DURING THE REVIEW OF RFI 857 THE CONTRACTOR IDENTIFIED THE ELECTRICAL PANELS E1B, E1D AND DIS FOR PANEL C1D NO… |
| Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-13 | +$887 | $77,919,700 | DURING THE OWNER REVIEW OF THE CABLING PAIRS REQUIRED TO SUPPORT THE PHONE SYSTEM AT THE NEW BUILDING #29 THE… |
| Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$2,500 | $77,922,200 | DURING A REVIEW OF THE VA POLICE'S SECURITY MATRIX FOR PRESCRIPTION MEDICATION DISTRIBUTION ROOMS IT WAS DISCO… |
| Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$920 | $77,923,120 | DRAWING OF EAST-WEST COLONNADE LIMESTONE ELEVATION WAS NOT COORDINATED WITH THE STRUCTURAL STEEL DRAWING FOR S… |
| Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$43,216 | $77,966,336 | A BENT STEEL PLATE WAS DESIGNATED TO EXTEND ABOVE FLOOR LEVEL IN FRONT OF CURTAINWALL SPANDREL GLASS AT THE "E… |
| Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$2,778 | $77,969,114 | THE 1FL PUBLIC RESTROOMS DO NOT PROVIDE PRIVACY FOR USERS. AFTER REVIEW IN THE FIELD THE VA REQUESTED PRIVACY… |
| Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$2,000 | $77,971,114 | ADDITIONAL HEAT DETECTORS AND TAMPER SWITCHES ARE REQUIRED FOR THE ELEVATORS FIRE PROTECTION AND SAFETY CODE C… |
| Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$3,824 | $77,974,938 | RFI 941 NOTED THAT EXTERIOR 3X103 RECEIVED A 3/16" SST BENT PLATE OVER THE RAISED SILL AND THAT EXTERIOR DOORS… |
| Mod SA188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$2,000 | $77,976,938 | THE CONTRACTOR IDENTIFIED EXISTING MEDICAL GAS ALARM WIRING IN THE B#1 LOBBY AS AN OBSTRUCTION TO THEIR WORK I… |
| Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$0 | $77,976,938 | DURING ELEVATOR INSPECTION IT WAS NOTED THAT THE LIGHT FIXTURES SPECIFIED WERE NOT NEMA 4 WEATHERPROOF TYPE FI… |
| Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-29 | +$11,236 | $77,988,174 | THE CONTRACT DOCUMENTS SHOWED A LEVER LOCKSET AND BUTT HINGES AT THE INPATIENT SHOWER ROOM DOORS. THIS TYPE OF… |
| Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-29 | +$645 | $77,988,819 | DURING INITIAL TESTING OF THE GENERATOR THE OUTSIDE AIR LOUVERS OF THE GENERATOR ROOM WERE NOT ADJUSTED TO OPE… |
| Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-29 | +$1,884 | $77,990,703 | THE COLUMNS IN THE EXISTING BUILDING (BLDG 1) DID NOT HAVE SPRAY ON FIRE PROOFING AT COLUMNS 34F, 34G, 35F, 37… |
| Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-29 | +$2,195 | $77,992,898 | DURING INSPECTION OF THE BATHROOM FLOOR SUB BASE IT WAS FOUND THAT THE EXISTING SUB BASE WAS NOT SUITABLE TO… |
| Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | −$46,955 | $77,945,943 | CONTRACT DOCUMENTS DID NOT CORRECTLY INCORPORATE NFPA 101 LIFE SAFETY CODE REQUIREMENTS. REVISIONS WERE MADE T… |
| Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$4,787 | $77,950,730 | DURING THE RE REVIEW OF THE HOLLOW METAL DOOR FRAME SUBMITTAL, IT WAS DISCOVERED THAT THE DOOR SIZES WERE 3'-0… |
| Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$674 | $77,951,404 | AN EXISTING FIRE HYDRANT WAS TOO HIGH AND NOT ORIENTED CORRECTLY FOR FIRE DEPARTMENT ACCESS AFTER FINAL SIDEWA… |
| Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$45,000 | $77,996,404 | THE CONTRACT DOCUMENTS INDICATE THAT THE STUDS SHALL BE INSTALLED ON 24" CENTERS. WHEN THE RE QUESTIONED THE… |
| Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-12 | +$1,652 | $77,998,056 | A PREVIOUS CHANGE IN CEILING HEIGHT LOWERED THE CEILING HEIGHT IN THE ATRIUM CAUSING OBSTRUCTION OF THE ACCESS… |
| Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-13 | +$0 | $77,998,056 | THE WINDOW BETWEEN THE NURSE WORKROOM XM160A AND THE NURSE STATION XM160 ON THE DAY SIDE OF THE INPATIENT FLOO… |
| Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$17,493 | $78,015,549 | PROVIDE ADDITIONAL LIMESTONE AND BRICK VENEER AT THE PATIENT TOILET ROOM WINDOWS ON FLOORS 3,4 AND 5 AS A RESU… |
| Mod SA199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | +$1,275 | $78,016,824 | THE SIZE FONT SPECIFIED BY THE CONTRACT FOR THE EXTERIOR TRI-SIGN LOCATED AT THE INTERSECTION OF BRECKENRIDGE… |
| Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | −$19,486 | $77,997,338 | CONTRACT DRAWINGS SHOW WOOD PANELING IN AREAS THAT DID NOT NEED THE PANELING. |
| Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | +$20,323 | $78,017,661 | DURING REVIEW OF THE MARLITE WALL PANELS DETAILS THE VAMC QUESTIONED THE USE OF PORCELAIN BASE ON THE FLOORS,… |
| Mod SA205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | +$964 | $78,018,625 | RFI 399 ADDRESSED THE CONFLICT WITH THE TIE-IN OF THE FIRST FLOOR VESTIBULE (ADJACENT TO STAIR M4) AND STAIR 7… |
| Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-26 | +$10,120 | $78,028,745 | CONTRACT DRAWINGS DID NOT PROVIDE DETAILS FOR WATERPROOFING THE FOUNTAINS AT THE PLAZA. |
| Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$4,388 | $78,033,133 | DURING INSTALLATION OF THE ENUNCIATOR PANELS FOR THE FIRE ALARM PANEL IT WAS NOTICED THAT THE EXISTING ENUNCIA… |
| Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-21 | +$3,336 | $78,036,469 | RFI 937 ADDRESSED THE LAYOUT INFO FOR THE FLAG POLE LIGHT. THE RE RESPONSE DELETED THE TYPE Y1 IN GROUND LIGHT… |
| Mod SA209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$1,808 | $78,038,277 | THE CAP PIECE OF THE SELF COVING SHEET RUBBER IS HELD IN PLACE BY DOUBLE FACE PAPER TAPE. AROUND THE PLUMBING… |
| Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-22 | +$763 | $78,039,040 | CHANGES IN FLOORING AT CORRIDOR SOUTH OF STARBUCKS WERE DONE TO ACCOMMODATE FUTURE VAMC PROJECTS THAT WOULD WI… |
| Mod CO03S· CHANGE ORDER | 2011-11-29 | +$67,735 | $78,106,775 | IN NOVEMBER 2010 THE VAMC INDICATED THAT THE LOBBY FLOORING WORK THAT WAS SHOWN FOR THE EXISTING B#1 1FL ON TH… |
| Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$3,764 | $78,110,539 | DURING INSPECTION OF BLDG #29 IT WAS NOTED THAT THE OUTSIDE LIGHTING OF THE CONTIGUOUS BLDG #31 WAS NOT ACCEPT… |
| Mod CO03T· CHANGE ORDER | 2011-11-30 | +$10,530 | $78,121,069 | DURING INITIAL TESTING OF THE GENERATOR THE OUTSIDE AIR LOUVERS OF THE GENERATOR ROOM WERE NOT ADJUSTED TO OPE… |
| Mod CO03U· CHANGE ORDER | 2011-11-30 | +$61,000 | $78,182,069 | CONTRACT DOCUMENTS WERE INCORRECTLY DESIGNED TO COMPLY WITH IBC STANDARDS RATHER THAN NFPA STANDARDS. |
| Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$6,135 | $78,188,204 | THE ADDITION OF SECURITY WALLS WERE NECESSARY IN ORDER TO ISOLATE ONGOING CONSTRUCTION ACTIVITIES AFTER TURNIN… |
| Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$10,440 | $78,198,644 | OPENINGS WERE MADE FOR DOORWAYS INTO EXISTING BLDG #1 FOR CONNECTION TO THE NEW BUILDING #29. ADDITIONAL MASON… |
| Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$2,097 | $78,200,741 | THE MEDICAL CENTER HAS APPROXIMATELY 1050 OCCUPANTS DURING PEAK OCCUPANCY. TO ACHIEVE LEED CERTIFICATION ADDIT… |
| Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$6,000 | $78,206,741 | THE CDS SHOW TWO LEAVES @ THE INPATIENT DOORS ON THE 3FL-5FL. THE FLUSH BOLT ON THE INACTIVE LEAF POSES A HANG… |
| Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$2,970 | $78,209,711 | DURING INITIAL TESTING OF THE GENERATOR THE OUTSIDE AIR LOUVERS OF THE GENERATOR ROOM WERE NOT ADJUSTED TO OPE… |
| Mod SA217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$1,001 | $78,210,712 | DURING REVIEW OF RFI 900 THE AE FAILED TO SHOW IN THE DRAWINGS THE EMERGENCY VENTS OF THE DAY TANK FOR THE GEN… |
| Mod SA218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$0 | $78,210,712 | THE VAMC INSTALLED THE AUDIO BOOTHS THAT WERE PREVIOUSLY THE RESPONSIBILITY OF THE CONTRACTOR. THE RESIDENT'… |
| Mod SA219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$1,138 | $78,211,850 | VAV BOXES IN THE 1FL LOBBY OF THE EXISTING HOSPITAL WERE FOUND TO BE IN THE LOCATION SHOWN ON THE CONTRACT DOC… |
| Mod SA220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$18,000 | $78,229,850 | CONTRACT DOCUMENTS WERE INCORRECTLY DESIGNED TO COMPLY WITH IBC STANDARDS RATHER THAN NFPA. |
| Mod SA221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$26,000 | $78,255,850 | THE AMOUNT OF PHASES NECESSARY TO COMPLETE THE EXISTING LOBBY TERRAZZO WORK EXCEEDED THE AMOUNT INCLUDED IN TH… |
| Mod SA222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$23,864 | $78,279,714 | THE PROJECT CONTRACTOR SUBMITTED RFIS 796, 907 AND 925 REQUESTING DETAILS FOR CONSTRUCTING THE CROSSOVER TIE-I… |
| Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-09 | +$14,200 | $78,293,914 | CORRIDOR XMC102 IS 4'-0" OVER THE ALLOWABLE DEAD END CORRIDOR DIMENSIONS, THEREFORE, A WALL AND DOOR WITH A LI… |
| Mod SA223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-19 | +$5,714 | $78,299,628 | DURING REVIEW OF RFI 818 IT WAS NOTED THAT THE CONTRACT DRAWING SHOWED THE MUFFLER THRU A WALL BUT THE MUFFLER… |
| Mod SA224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-09 | +$1,000 | $78,300,628 | RFI 942 REQUESTED INFORMATION FROM THE OWNER TO PROVIDE EXACT LOCATION OF THE OFF NORMAL TEMPERATURE ALARM PAN… |
| Mod SA225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-13 | +$27,764 | $78,328,392 | DUCTWORK NEEDED TO BE RECONFIGURED DUE TO EXISTING CEILING CONGESTION. |
| Mod SA227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-04 | +$495 | $78,328,887 | DURING INSPECTION AND REVIEW OF THE SOUND READINGS OF 8 (EIGHT) OF THE AUDIOLOGY ROOMS IT WAS NOTICED THAT THE… |
| Mod CO03V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-11 | +$39,084 | $78,367,971 | INSTALL SOUND SILENCERS AT EIGHT ROOMS AT THE SECOND FLOOR OF BUILDING 29 AUDIOLOGY AREA. |
| Mod CO03W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-20 | +$2,962 | $78,370,933 | THE DOMESTIC HOT WATER HEATING SYSTEM IS NOT PERFORMING PROPERLY AND REQUIRES INVESTIGATION AND SERVICE FROM T… |
| Mod SA228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-02 | −$17,403 | $78,353,530 | DEFINITIZES CO-03V = $39,084.00 DATED 5-11-2012. INSTALL SOUND DAMPENING DUCT WORK IN EIGHT HEARING AID FITT… |
| Mod SA229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-02 | +$29,251 | $78,382,781 | DEFINITIZES CO-03W = $2,962.00 DATED 7-20-2012. PROVIDE PLUMBER RESOURCES TO DIAGNOSE AND REBALANCE THE HOT… |
| Mod SA230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-20 | +$15,123 | $78,397,904 | FINALIZE THE BOND PREMIUM AS ADJUSTED FOR CONTRACT MODIFICATIONS PER VAAR 852.236-88. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$6,635 | $78,404,539 | P00003/SA-231 - INSTALL AN AUTO COOLER AND TRAP PRIMER IN THE CONDENSATE RECEIVER TANK OVERFLOW PIPE. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-26 | +$7,629 | $78,412,168 | P00004/SA-232 - ADJUST VENT PIPING, CHECK ALL STEAM TRAPS, ADJUST RE-SET THE TANK FLOATS, REPAIR DAMAGED PUMP… |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI NNNAEYQXKJ35)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA101CFMC0136 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y111 · CONSTRUCTION OF OFFICE BUILDINGS | $28,493,376 | FY2011 |
| VA245C0428 | 688-WASHINGTON DC · Y141 · CONSTRUCT/HOSPITALS & INFIRMARIES | $944,731 | FY2010 |
| V101BC0209 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y149 · CONSTRUCT/OTHER HOSPITAL BLDGS | $3,899,934 | FY2008 |
| V101BC0223 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C114 · HOSPITAL BUILDINGS | $2,922,053 | FY2008 |
Other recipients under Y141 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0167 | THE R.E.M. ENGINEERING CO INC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $384,303 | FY2011 |
| VA101CFMC0130 | TTL ASSOCIATES INC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $101,742 | FY2011 |
| VA101CFMC0111 | WALSH CONSTRUCTION PUERTO RICO | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $52,457,646 | FY2010 |
| VA101CFMC0085 | ARCHER WESTERN/DEMARIA JOINT VENTURE III | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $58,427,947 | FY2010 |
| VACFM05I0064 | N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C. | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $114,946 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0014_3600_-NONE-_-NONE- · retrieved 2026-09-26.