Award recordCONTRACT

CHRISTNER, INC

PIID VA101183B4P0023· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C114 · HOSPITAL BUILDINGS· FY2008· $20,979,800 net obligations· UEI MKF7B4BKWM18· MO

Description

P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES

Base award description: PROVIDE PROFESSIONAL SERVICES NECESSARY TO DEVELOP A MASTER PLAN FOR THE ST. LOUIS VAMC.

First action · last action
2008-04-22 · 2022-02-02
Transactions
93
First transaction's obligation
$369,282
Base + all options value (sum of deltas)
$20,979,800
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
5
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 93 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$20,979,800$0Base award · 2008-04-22 · this action $369,282 · running total $369,282Modification SA001 · 2008-09-15 · this action $11,000 · running total $380,282Modification SA02 · 2008-12-24 · this action $6,800 · running total $387,082Modification SA03 · 2009-02-26 · this action $13,551 · running total $400,633Modification SA05 · 2009-06-04 · this action $1,745 · running total $402,378Modification SA04 · 2009-06-17 · this action $1,471,283 · running total $1,873,661Modification SA06 · 2009-07-14 · this action $26,100 · running total $1,899,761Modification SA07 · 2009-09-22 · this action -$32,000 · running total $1,867,761Modification SA008 · 2009-11-20 · this action $3,086,722 · running total $4,954,483Modification SA009 · 2010-01-29 · this action $4,166,563 · running total $9,121,046Modification SA010 · 2010-03-30 · this action $16,900 · running total $9,137,946Modification SA013 · 2010-07-22 · this action $15,123 · running total $9,153,069Modification SA11 · 2010-09-01 · this action $94,032 · running total $9,247,101Modification SA12 · 2010-09-01 · this action $396,144 · running total $9,643,245Modification SA14 · 2010-09-01 · this action $2,636,111 · running total $12,279,356Modification SA15 · 2010-09-01 · this action $7,942 · running total $12,287,298Modification SA17 · 2010-09-16 · this action $971 · running total $12,288,269Modification SA16 · 2010-09-20 · this action $47,290 · running total $12,335,559Modification SA18 · 2010-12-03 · this action $9,276 · running total $12,344,835Modification SA19 · 2010-12-15 · this action $14,710 · running total $12,359,545Modification SA20 · 2011-02-04 · this action $237,437 · running total $12,596,982Modification SA21 · 2011-02-18 · this action $49,632 · running total $12,646,614Modification SA22 · 2011-05-02 · this action $0 · running total $12,646,614Modification SA23 · 2011-05-02 · this action $182,721 · running total $12,829,335Modification SA24 · 2011-05-18 · this action $6,300 · running total $12,835,635Modification SA25 · 2011-07-19 · this action $2,368,865 · running total $15,204,500Modification SA26 · 2011-07-19 · this action $8,567 · running total $15,213,067Modification SA27 · 2011-09-12 · this action $84,570 · running total $15,297,637Modification SA28 · 2011-10-11 · this action $0 · running total $15,297,637Modification SA29 · 2011-11-17 · this action $18,262 · running total $15,315,899Modification SA30 · 2011-11-28 · this action $15,674 · running total $15,331,573Modification SA31 · 2012-02-09 · this action $12,420 · running total $15,343,993Modification SA33 · 2012-06-21 · this action $14,713 · running total $15,358,706Modification SA32 · 2012-07-11 · this action $1,486,061 · running total $16,844,767Modification SA34 · 2013-01-17 · this action $4,515 · running total $16,849,282Modification SA35 · 2013-03-12 · this action $2,082 · running total $16,851,364Modification SA36 · 2013-08-05 · this action $1,552,443 · running total $18,403,807Modification SA37 · 2013-08-05 · this action $66,587 · running total $18,470,394Modification SA38 · 2013-09-10 · this action $2,986 · running total $18,473,380Modification SA39 · 2014-01-13 · this action $2,229 · running total $18,475,609Modification SA40 · 2014-02-26 · this action $17,951 · running total $18,493,560Modification SA41 · 2014-03-13 · this action $9,560 · running total $18,503,120Modification SA42 · 2014-03-26 · this action $6,105 · running total $18,509,225Modification SA43 · 2014-07-21 · this action $49,758 · running total $18,558,983Modification SA44 · 2014-07-21 · this action $92,368 · running total $18,651,351Modification SA45 · 2014-08-13 · this action $1,107 · running total $18,652,458Modification SA46 · 2014-08-28 · this action $783 · running total $18,653,241Modification SA47 · 2014-09-19 · this action $10,442 · running total $18,663,683Modification SA48 · 2014-10-16 · this action $158,542 · running total $18,822,225Modification SA49 · 2014-10-27 · this action $8,426 · running total $18,830,651Modification SA50 · 2015-04-10 · this action $20,227 · running total $18,850,878Modification SA51 · 2015-11-04 · this action $6,930 · running total $18,857,808Modification SA52 · 2016-04-29 · this action $5,685 · running total $18,863,493Modification SA53 · 2016-05-19 · this action $22,698 · running total $18,886,191Modification SA54 · 2016-05-19 · this action $655,333 · running total $19,541,524Modification SA55 · 2016-09-07 · this action $571,396 · running total $20,112,920Modification SA56 · 2017-02-07 · this action $13,186 · running total $20,126,106Modification SA57 · 2017-02-07 · this action $2,305 · running total $20,128,411Modification SA58 · 2017-03-17 · this action $8,863 · running total $20,137,274Modification SA59 · 2017-05-16 · this action $0 · running total $20,137,274Modification SA60 · 2017-07-17 · this action $2,790 · running total $20,140,064Modification SA61 · 2017-08-16 · this action $4,000 · running total $20,144,064Modification SA62 · 2017-09-18 · this action $12,603 · running total $20,156,667Modification SA63 · 2017-10-27 · this action $110,727 · running total $20,267,394Modification SA64 · 2018-04-18 · this action $14,269 · running total $20,281,663Modification P00065 · 2018-05-21 · this action $7,813 · running total $20,289,476Modification P00066 · 2018-06-06 · this action $65,712 · running total $20,355,188Modification P00067 · 2018-06-06 · this action $3,182 · running total $20,358,370Modification P00068 · 2018-06-11 · this action $7,245 · running total $20,365,615Modification P00069 · 2018-06-21 · this action $40,615 · running total $20,406,230Modification P00070 · 2018-06-21 · this action $2,784 · running total $20,409,014Modification P00071 · 2018-08-08 · this action $16,793 · running total $20,425,807Modification P00072 · 2018-12-17 · this action $3,811 · running total $20,429,618Modification P00073 · 2019-01-30 · this action $5,758 · running total $20,435,376Modification P00074 · 2019-02-26 · this action $20,000 · running total $20,455,376Modification P00075 · 2019-03-01 · this action $8,000 · running total $20,463,376Modification P00076 · 2019-03-25 · this action $48,410 · running total $20,511,786Modification P00077 · 2019-05-13 · this action $7,854 · running total $20,519,640Modification P00079 · 2019-05-20 · this action $4,977 · running total $20,524,617Modification P00078 · 2019-05-24 · this action $2,465 · running total $20,527,082Modification P00080 · 2019-05-24 · this action $4,358 · running total $20,531,440Modification P00081 · 2019-05-24 · this action $2,514 · running total $20,533,954Modification P00082 · 2019-07-30 · this action $6,650 · running total $20,540,604Modification P00083 · 2019-07-30 · this action $12,300 · running total $20,552,904Modification P00084 · 2019-09-30 · this action $2,791 · running total $20,555,695Modification P00085 · 2019-10-23 · this action $75,290 · running total $20,630,985Modification P00086 · 2020-02-03 · this action $172,538 · running total $20,803,523Modification P00087 · 2020-02-25 · this action $20,000 · running total $20,823,523Modification P00088 · 2020-04-08 · this action $9,446 · running total $20,832,969Modification P00089 · 2020-04-20 · this action $1,674 · running total $20,834,643Modification P00090 · 2020-09-29 · this action $2,883 · running total $20,837,526Modification P00091 · 2020-12-22 · this action $128,274 · running total $20,965,800Modification P00093 · 2022-02-02 · this action $14,000 · running total $20,979,800
  • Base2008-04-22+$369,282= $369,282
  • Mod SA0012008-09-15+$11,000= $380,282
  • Mod SA022008-12-24+$6,800= $387,082
  • Mod SA032009-02-26+$13,551= $400,633
  • Mod SA052009-06-04+$1,745= $402,378
  • Mod SA042009-06-17+$1,471,283= $1,873,661
  • Mod SA062009-07-14+$26,100= $1,899,761
  • Mod SA072009-09-22-$32,000= $1,867,761
  • Mod SA0082009-11-20+$3,086,722= $4,954,483
  • Mod SA0092010-01-29+$4,166,563= $9,121,046
  • Mod SA0102010-03-30+$16,900= $9,137,946
  • Mod SA0132010-07-22+$15,123= $9,153,069
  • Mod SA112010-09-01+$94,032= $9,247,101
  • Mod SA122010-09-01+$396,144= $9,643,245
  • Mod SA142010-09-01+$2,636,111= $12,279,356
  • Mod SA152010-09-01+$7,942= $12,287,298
  • Mod SA172010-09-16+$971= $12,288,269
  • Mod SA162010-09-20+$47,290= $12,335,559
  • Mod SA182010-12-03+$9,276= $12,344,835
  • Mod SA192010-12-15+$14,710= $12,359,545
  • Mod SA202011-02-04+$237,437= $12,596,982
  • Mod SA212011-02-18+$49,632= $12,646,614
  • Mod SA222011-05-02+$0= $12,646,614
  • Mod SA232011-05-02+$182,721= $12,829,335
  • Mod SA242011-05-18+$6,300= $12,835,635
  • Mod SA252011-07-19+$2,368,865= $15,204,500
  • Mod SA262011-07-19+$8,567= $15,213,067
  • Mod SA272011-09-12+$84,570= $15,297,637
  • Mod SA282011-10-11+$0= $15,297,637
  • Mod SA292011-11-17+$18,262= $15,315,899
  • Mod SA302011-11-28+$15,674= $15,331,573
  • Mod SA312012-02-09+$12,420= $15,343,993
  • Mod SA332012-06-21+$14,713= $15,358,706
  • Mod SA322012-07-11+$1,486,061= $16,844,767
  • Mod SA342013-01-17+$4,515= $16,849,282
  • Mod SA352013-03-12+$2,082= $16,851,364
  • Mod SA362013-08-05+$1,552,443= $18,403,807
  • Mod SA372013-08-05+$66,587= $18,470,394
  • Mod SA382013-09-10+$2,986= $18,473,380
  • Mod SA392014-01-13+$2,229= $18,475,609
  • Mod SA402014-02-26+$17,951= $18,493,560
  • Mod SA412014-03-13+$9,560= $18,503,120
  • Mod SA422014-03-26+$6,105= $18,509,225
  • Mod SA432014-07-21+$49,758= $18,558,983
  • Mod SA442014-07-21+$92,368= $18,651,351
  • Mod SA452014-08-13+$1,107= $18,652,458
  • Mod SA462014-08-28+$783= $18,653,241
  • Mod SA472014-09-19+$10,442= $18,663,683
  • Mod SA482014-10-16+$158,542= $18,822,225
  • Mod SA492014-10-27+$8,426= $18,830,651
  • Mod SA502015-04-10+$20,227= $18,850,878
  • Mod SA512015-11-04+$6,930= $18,857,808
  • Mod SA522016-04-29+$5,685= $18,863,493
  • Mod SA532016-05-19+$22,698= $18,886,191
  • Mod SA542016-05-19+$655,333= $19,541,524
  • Mod SA552016-09-07+$571,396= $20,112,920
  • Mod SA562017-02-07+$13,186= $20,126,106
  • Mod SA572017-02-07+$2,305= $20,128,411
  • Mod SA582017-03-17+$8,863= $20,137,274
  • Mod SA592017-05-16+$0= $20,137,274
  • Mod SA602017-07-17+$2,790= $20,140,064
  • Mod SA612017-08-16+$4,000= $20,144,064
  • Mod SA622017-09-18+$12,603= $20,156,667
  • Mod SA632017-10-27+$110,727= $20,267,394
  • Mod SA642018-04-18+$14,269= $20,281,663
  • Mod P000652018-05-21+$7,813= $20,289,476
  • Mod P000662018-06-06+$65,712= $20,355,188
  • Mod P000672018-06-06+$3,182= $20,358,370
  • Mod P000682018-06-11+$7,245= $20,365,615
  • Mod P000692018-06-21+$40,615= $20,406,230
  • Mod P000702018-06-21+$2,784= $20,409,014
  • Mod P000712018-08-08+$16,793= $20,425,807
  • Mod P000722018-12-17+$3,811= $20,429,618
  • Mod P000732019-01-30+$5,758= $20,435,376
  • Mod P000742019-02-26+$20,000= $20,455,376
  • Mod P000752019-03-01+$8,000= $20,463,376
  • Mod P000762019-03-25+$48,410= $20,511,786
  • Mod P000772019-05-13+$7,854= $20,519,640
  • Mod P000792019-05-20+$4,977= $20,524,617
  • Mod P000782019-05-24+$2,465= $20,527,082
  • Mod P000802019-05-24+$4,358= $20,531,440
  • Mod P000812019-05-24+$2,514= $20,533,954
  • Mod P000822019-07-30+$6,650= $20,540,604
  • Mod P000832019-07-30+$12,300= $20,552,904
  • Mod P000842019-09-30+$2,791= $20,555,695
  • Mod P000852019-10-23+$75,290= $20,630,985
  • Mod P000862020-02-03+$172,538= $20,803,523
  • Mod P000872020-02-25+$20,000= $20,823,523
  • Mod P000882020-04-08+$9,446= $20,832,969
  • Mod P000892020-04-20+$1,674= $20,834,643
  • Mod P000902020-09-29+$2,883= $20,837,526
  • Mod P000912020-12-22+$128,274= $20,965,800
  • Mod P000932022-02-02+$14,000= $20,979,800
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-04-22+$369,282$369,282PROVIDE PROFESSIONAL SERVICES NECESSARY TO DEVELOP A MASTER PLAN FOR THE ST. LOUIS VAMC.
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2008-09-15+$11,000$380,282PROVIDE PROFESSIONAL SERVICES NECESSARY TO DEVELOP A MASTER PLAN FOR THE ST. LOUIS VAMC.
Mod SA02· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2008-12-24+$6,800$387,082PROVIDE PROFESSIONAL SERVICES NECESSARY TO DEVELOP A MASTER PLAN FOR THE ST. LOUIS VAMC.
Mod SA03· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-02-26+$13,551$400,633PROVIDE PROFESSIONAL SERVICES NECESSARY TO DEVELOP A MASTER PLAN FOR THE ST. LOUIS VAMC.
Mod SA05· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-04+$1,745$402,378ST LOUIS JB - MOD TO ATTEND NCA DESIGN REVIEW JUNE 9, 2009 AT URS OFFICE IN ST LOUIS, MO
Mod SA04· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-17+$1,471,283$1,873,661ST LOUIS JEFFERSON BARRAKS SCHEMATIC DESIGN OF PHASE 2, PROJECT 657-313, MEDICAL CENTER IMPROVEMENTS AND CEME…
Mod SA06· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-07-14+$26,100$1,899,761GEOTECH SEVICES
Mod SA07· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-09-22−$32,000$1,867,761SURVEYING SWITCH
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-20+$3,086,722$4,954,483PHASE II OF PROJECT 657-313, MEDICAL CENTER IMPROVEMENTS AND CEMETERY EXPANSION AT THE VAMC ST. LOUIS JEFFERSO…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-29+$4,166,563$9,121,046MEDICAL FACILITY IMPROVEMENTS AND NCA EXPANSION, PROJECT NO. 657-313, JEFFERSON BARRACKS DIVISION, ST. LOUIS V…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-30+$16,900$9,137,946ADDITIONAL GEOTECHNICAL SERVICES AND AIR EMISSION/FLOW TESTING.
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-22+$15,123$9,153,069INCLUSION OF ELEVTOR CONSULTANT
Mod SA11· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-01+$94,032$9,247,101HABS SURVEY
Mod SA12· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-01+$396,144$9,643,245COMMISSIONING SERVICES
Mod SA14· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-01+$2,636,111$12,279,356PHASE II CD'S
Mod SA15· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-01+$7,942$12,287,298ADDITIONAL TESTING SERVICE
Mod SA17· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-16+$971$12,288,269CHANGE SIZE OF PRINTS FOR HABS
Mod SA16· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-20+$47,290$12,335,559ADD'L DD & CD ASBESTOS REVIEW WORK
Mod SA18· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-03+$9,276$12,344,835ADDITIONAL WORK FOR ACOUSTIC CONSULTANT
Mod SA19· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-15+$14,710$12,359,545LEEDS CERTIFICATION FOR PHASE II
Mod SA20· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-04+$237,437$12,596,982ADD CHP
Mod SA21· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-18+$49,632$12,646,614COMMISSIONING PHAES II CD'S
Mod SA22· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-02+$0$12,646,614TIEM EXTENSION
Mod SA23· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-02+$182,721$12,829,335ADD BLAST CONSULTANT
Mod SA24· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-18+$6,300$12,835,635ADDITIONAL GEOTECH WORK ON SINKHOLE
Mod SA25· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-19+$2,368,865$15,204,500CD PHASE 3 AND 4
Mod SA26· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-19+$8,567$15,213,067ADDITIONAL SAMPLING
Mod SA27· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-09-12+$84,570$15,297,637ADDITIONAL SAMPLING
Mod SA28· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-10-11+$0$15,297,637ADDITIONAL TIME FOR PHASE II CD'S
Mod SA29· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-11-17+$18,262$15,315,899ADD'L GEOTECH
Mod SA30· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-11-28+$15,674$15,331,573DESIGN CHANGES TO STEAM DISTRIBUTION
Mod SA31· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2012-02-09+$12,420$15,343,993ADD IRRIGATION CONSULTANT
Mod SA33· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2012-06-21+$14,713$15,358,706ADD INTEGATED MASTER SCHEDULE
Mod SA32· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2012-07-11+$1,486,061$16,844,767ADD CPS FOR ALL CONSTRUCTION - LATER CONSTRUCTION IS ADDED BY OPTION.
Mod SA34· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2013-01-17+$4,515$16,849,282UPDATE MANHOLE LOCATIONS
Mod SA35· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2013-03-12+$2,082$16,851,364REDESIGN FOUNDATION FOR ENERGY CENTER
Mod SA36· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2013-08-05+$1,552,443$18,403,807REDESIGN FOUNDATION FOR ENERGY CENTER
Mod SA37· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2013-08-05+$66,587$18,470,394CREATE CD'S FOR IMPACT PARKING
Mod SA38· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-09-10+$2,986$18,473,380MODIFY STRUCTURAL BASE PLATES
Mod SA39· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-13+$2,229$18,475,609RECONFIGURE MANHOLE S12
Mod SA40· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-26+$17,951$18,493,560INCORPORATE PHASE II CONSTRUCTION CHANGES TO PHASES III&IV
Mod SA41· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-03-13+$9,560$18,503,120REDESIGN FOR DATE OUTLETS IN PHASE II&IV.
Mod SA42· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-03-26+$6,105$18,509,225REVISE PHASE II DOCUMENTS
Mod SA43· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-21+$49,758$18,558,983MODIFICATION TO INCORPORATE UTILIZATION OF TRIRIGA TO CPS, ST LOUIS JB.
Mod SA44· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-21+$92,368$18,651,351ADDITIONAL SITE INVESTIGATION, SAMPLING, AND TESTING FOR ASBESTOS OR OTHER HAZARDOUS MATERIALS, ST LOUIS JB.
Mod SA45· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-13+$1,107$18,652,458REVISE FIRE ALARM CONSTRUCTION DOCUMENTS IN EAST WING OF FIRST BLOOR BLDG 51, ST LOUIS JB.
Mod SA46· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-28+$783$18,653,241REPORT OF TRANSMITTAL TO MISSOURI DNR FOR CLOSURE OF WELL, ST LOUIS JB.
Mod SA47· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-19+$10,442$18,663,683REVISE CONSTRUCTION DOCUMENTS TO REROUTE CHILLED WATER PIPING AT THE PEDESTRIAN CORRIDOR BETWEEN BLDG 51 AND 6…
Mod SA48· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-16+$158,542$18,822,225REVISE CONSTRUCTION DOCUMENTS TO ADD REPLACEMENT OF EXISTING UNDERGROUND WATER, STEAM, AND CHILLED WATER LINES…
Mod SA49· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-27+$8,426$18,830,651REVISE CONSTRUCTION DOCUMENTS TO REPLACE SAVANNAH SEED MIX, MODIFY BIO RETENTION AREAS, AND INCORPORATE A NEW…
Mod SA50· EXERCISE AN OPTION2015-04-10+$20,227$18,850,878EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA51· EXERCISE AN OPTION2015-11-04+$6,930$18,857,808EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA52· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-29+$5,685$18,863,493EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA53· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-19+$22,698$18,886,191EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA54· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-19+$655,333$19,541,524EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA55· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-09-07+$571,396$20,112,920EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA56· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-02-07+$13,186$20,126,106EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA57· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-02-07+$2,305$20,128,411EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA58· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-03-17+$8,863$20,137,274EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA59· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-16+$0$20,137,274EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA60· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-17+$2,790$20,140,064EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA61· CHANGE ORDER2017-08-16+$4,000$20,144,064EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA62· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-18+$12,603$20,156,667EXERCISE PRE-PRICED OPTION FOR CPS FOR DEMOLITION OF UTILITY PLANT. VAMC ST LOUIS, MO.
Mod SA63· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-27+$110,727$20,267,394RUST AND MOLD CONSULTANT
Mod SA64· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-18+$14,269$20,281,663RUST AND MOLD CONSULTANT
Mod P00065· CHANGE ORDER2018-05-21+$7,813$20,289,476RUST AND MOLD CONSULTANT
Mod P00066· CHANGE ORDER2018-06-06+$65,712$20,355,188P00066 CHANGE ORDER FOR REPACKAGING
Mod P00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-06+$3,182$20,358,370P00066 CHANGE ORDER FOR REPACKAGING
Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-11+$7,245$20,365,615P00066 CHANGE ORDER FOR REPACKAGING
Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-21+$40,615$20,406,230P00066 CHANGE ORDER FOR REPACKAGING
Mod P00070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-21+$2,784$20,409,014P00066 CHANGE ORDER FOR REPACKAGING
Mod P00071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-08+$16,793$20,425,807P00066 CHANGE ORDER FOR REPACKAGING
Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-12-17+$3,811$20,429,618P00072 REA
Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-30+$5,758$20,435,376P00073 REA
Mod P00074· CHANGE ORDER2019-02-26+$20,000$20,455,376P00073 REA
Mod P00075· CHANGE ORDER2019-03-01+$8,000$20,463,376P00073 REA
Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-25+$48,410$20,511,786P00076 ECD PRE PRICED OPTION
Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-13+$7,854$20,519,640P00076 ECD PRE PRICED OPTION
Mod P00079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-20+$4,977$20,524,617P00076 ECD PRE PRICED OPTION
Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-24+$2,465$20,527,082P00078 REA FOR WATER LINE MISLOCATION
Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-24+$4,358$20,531,440P00080 REA STRUCTURAL DESIGN
Mod P00081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-24+$2,514$20,533,954P00081 REA ADDITIONAL SURVEY
Mod P00082· CHANGE ORDER2019-07-30+$6,650$20,540,604P00082 MISC CHANGES
Mod P00083· CHANGE ORDER2019-07-30+$12,300$20,552,904P00083, CONSTRUCTION DOCUMENTS PACKAGE
Mod P00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-30+$2,791$20,555,695P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-10-23+$75,290$20,630,985P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-03+$172,538$20,803,523P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00087· CHANGE ORDER2020-02-25+$20,000$20,823,523P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-08+$9,446$20,832,969P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-20+$1,674$20,834,643P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-29+$2,883$20,837,526P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-12-22+$128,274$20,965,800P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES
Mod P00093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-02-02+$14,000$20,979,800P00084, CONSTRUCTION DOCUMENTS FOR VAMC CHANGES

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI MKF7B4BKWM18)

AwardOffice · PSC / listingNet obligationsFY
VA25514J4754255-NETWORK CONTRACT OFFICE 15 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$8,673FY2014
VA25512J1327255-NETWORK CONTRACT OFFICE 15 (36C255) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$490,326FY2012
VA255657C11045255-NETWORK CONTRACT OFFICE 15 · C114 · HOSPITAL BUILDINGS$64,149FY2011
VA255589ZC1002255-NETWORK CONTRACT OFFICE 15 (36C255) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$1,015,460FY2011
VA255P1664255-NETWORK CONTRACT OFFICE 15 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$0FY2011
VA255P1604255-NETWORK CONTRACT OFFICE 15 (36C255) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$735,814FY2010

Other recipients under C114 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VATODEC05LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$1,261FY2018
VATOJUL07LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$188,468FY2016
VA101CFMP0148CANNON DESIGN, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,571FY2011
VACFM05C0095E B A ERNEST BLAND ASSOCIATES, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$53,624FY2011
V101BP0249N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$0FY2011