Award recordCONTRACT

STUDIO NOVA LP

PIID VA101183B4P0020· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· C114 · HOSPITAL BUILDINGS· FY2008· $104,534,802 net obligations· UEI PNK3E1YR7SS6· WA

Description

DEOBLIGATION MODIFICATION FOR CLOSEOUT

Base award description: NOLA

First action · last action
2008-04-14 · 2018-12-14
Transactions
72
First transaction's obligation
$521,307
Base + all options value (sum of deltas)
$104,534,802
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
5
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 72 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$104,687,242$0Base award · 2008-04-14 · this action $521,307 · running total $521,307Modification AC001 · 2008-05-05 · this action $0 · running total $521,307Modification AC002 · 2008-06-16 · this action $0 · running total $521,307Modification CO01A · 2008-11-25 · this action $2,100,000 · running total $2,621,307Modification SA001 · 2009-03-17 · this action $36,436,323 · running total $39,057,630Modification CO02 · 2009-12-15 · this action $60,000 · running total $39,117,630Modification CO03 · 2009-12-27 · this action $85,000 · running total $39,202,630Modification CO05 · 2010-03-09 · this action $90,000 · running total $39,292,630Modification SA002 · 2010-03-11 · this action $14,875 · running total $39,307,505Modification CO04 · 2010-03-17 · this action $1,400,000 · running total $40,707,505Modification SA004 · 2010-05-24 · this action $2,500 · running total $40,710,005Modification SA003 · 2010-05-26 · this action $9,900 · running total $40,719,905Modification CO06 · 2010-07-23 · this action $95,000 · running total $40,814,905Modification SA008 · 2010-07-23 · this action $13,677 · running total $40,828,582Modification CO07 · 2010-08-03 · this action $95,000 · running total $40,923,582Modification SA005 · 2010-08-23 · this action $871,235 · running total $41,794,817Modification SA011 · 2010-09-17 · this action $85,397 · running total $41,880,214Modification SA009 · 2010-09-21 · this action $328,753 · running total $42,208,967Modification SA006 · 2010-09-30 · this action $686,981 · running total $42,895,948Modification SA010 · 2010-09-30 · this action $31,231,621 · running total $74,127,569Modification CO10 · 2011-01-06 · this action $95,000 · running total $74,222,569Modification SA012 · 2011-02-11 · this action $1,457,617 · running total $75,680,186Modification CO011 · 2011-02-17 · this action $95,000 · running total $75,775,186Modification SA007 · 2011-02-28 · this action $226,165 · running total $76,001,351Modification SA016 · 2011-03-09 · this action -$26,849 · running total $75,974,502Modification CO012 · 2011-03-14 · this action $90,000 · running total $76,064,502Modification SA015 · 2011-03-23 · this action $88,255 · running total $76,152,757Modification CO013 · 2011-04-08 · this action $90,000 · running total $76,242,757Modification CO014 · 2011-04-08 · this action $90,000 · running total $76,332,757Modification SA013 · 2011-04-18 · this action $604,666 · running total $76,937,423Modification SA019 · 2011-07-26 · this action $161,264 · running total $77,098,687Modification SA017 · 2011-08-02 · this action $1,083,688 · running total $78,182,375Modification SA018 · 2011-08-08 · this action $258,764 · running total $78,441,139Modification SA022 · 2011-09-30 · this action $28,716 · running total $78,469,855Modification SA023 · 2011-09-30 · this action $55,157 · running total $78,525,012Modification CO015 · 2011-10-20 · this action $0 · running total $78,525,012Modification SA020 · 2011-11-01 · this action $184,577 · running total $78,709,589Modification SA014 · 2011-11-08 · this action $2,218,444 · running total $80,928,033Modification SA021 · 2011-11-08 · this action $17,080,048 · running total $98,008,081Modification CO016 · 2012-02-17 · this action $25,000 · running total $98,033,081Modification SA024 · 2012-04-23 · this action $30,710 · running total $98,063,791Modification SA028 · 2012-11-09 · this action $8,151 · running total $98,071,942Modification SA029 · 2013-03-05 · this action $62,631 · running total $98,134,573Modification SA031 · 2013-05-23 · this action $23,810 · running total $98,158,383Modification SA032 · 2013-07-18 · this action $13,283 · running total $98,171,666Modification SA034 · 2013-12-10 · this action $0 · running total $98,171,666Modification SA035 · 2014-05-21 · this action $94,395 · running total $98,266,061Modification SA030 · 2014-06-04 · this action $2,136,015 · running total $100,402,076Modification CO017 · 2014-06-11 · this action $0 · running total $100,402,076Modification SA036 · 2014-08-28 · this action $8,289 · running total $100,410,365Modification CO018 · 2014-10-23 · this action $5,000 · running total $100,415,365Modification SA037 · 2015-01-07 · this action $673 · running total $100,416,038Modification SA038 · 2015-01-23 · this action $12,253 · running total $100,428,291Modification SA039 · 2015-02-04 · this action $20,062 · running total $100,448,353Modification SA040 · 2015-03-13 · this action $17,639 · running total $100,465,992Modification SA042 · 2015-04-14 · this action $98,792 · running total $100,564,784Modification SA041 · 2015-04-30 · this action $2,469,807 · running total $103,034,591Modification SA043 · 2015-06-10 · this action $7,211 · running total $103,041,802Modification SA044 · 2015-07-20 · this action $22,231 · running total $103,064,033Modification SA045 · 2015-08-28 · this action $24,106 · running total $103,088,139Modification SA046 · 2015-08-28 · this action $17,428 · running total $103,105,567Modification SA047 · 2016-03-28 · this action $4,026 · running total $103,109,593Modification CO019 · 2016-04-14 · this action $75,000 · running total $103,184,593Modification SA048 · 2016-06-14 · this action $1,502,649 · running total $104,687,242Modification SA049 · 2017-07-21 · this action $0 · running total $104,687,242Modification SA050 · 2017-09-19 · this action $0 · running total $104,687,242Modification SA052 · 2017-09-19 · this action $0 · running total $104,687,242Modification SA051 · 2017-10-19 · this action $0 · running total $104,687,242Modification SA053 · 2017-11-13 · this action $0 · running total $104,687,242Modification SA054 · 2017-11-13 · this action $0 · running total $104,687,242Modification SA055 · 2017-12-06 · this action $0 · running total $104,687,242Modification P00001 · 2018-12-14 · this action -$152,440 · running total $104,534,802
  • Base2008-04-14+$521,307= $521,307
  • Mod AC0012008-05-05+$0= $521,307
  • Mod AC0022008-06-16+$0= $521,307
  • Mod CO01A2008-11-25+$2,100,000= $2,621,307
  • Mod SA0012009-03-17+$36,436,323= $39,057,630
  • Mod CO022009-12-15+$60,000= $39,117,630
  • Mod CO032009-12-27+$85,000= $39,202,630
  • Mod CO052010-03-09+$90,000= $39,292,630
  • Mod SA0022010-03-11+$14,875= $39,307,505
  • Mod CO042010-03-17+$1,400,000= $40,707,505
  • Mod SA0042010-05-24+$2,500= $40,710,005
  • Mod SA0032010-05-26+$9,900= $40,719,905
  • Mod CO062010-07-23+$95,000= $40,814,905
  • Mod SA0082010-07-23+$13,677= $40,828,582
  • Mod CO072010-08-03+$95,000= $40,923,582
  • Mod SA0052010-08-23+$871,235= $41,794,817
  • Mod SA0112010-09-17+$85,397= $41,880,214
  • Mod SA0092010-09-21+$328,753= $42,208,967
  • Mod SA0062010-09-30+$686,981= $42,895,948
  • Mod SA0102010-09-30+$31,231,621= $74,127,569
  • Mod CO102011-01-06+$95,000= $74,222,569
  • Mod SA0122011-02-11+$1,457,617= $75,680,186
  • Mod CO0112011-02-17+$95,000= $75,775,186
  • Mod SA0072011-02-28+$226,165= $76,001,351
  • Mod SA0162011-03-09-$26,849= $75,974,502
  • Mod CO0122011-03-14+$90,000= $76,064,502
  • Mod SA0152011-03-23+$88,255= $76,152,757
  • Mod CO0132011-04-08+$90,000= $76,242,757
  • Mod CO0142011-04-08+$90,000= $76,332,757
  • Mod SA0132011-04-18+$604,666= $76,937,423
  • Mod SA0192011-07-26+$161,264= $77,098,687
  • Mod SA0172011-08-02+$1,083,688= $78,182,375
  • Mod SA0182011-08-08+$258,764= $78,441,139
  • Mod SA0222011-09-30+$28,716= $78,469,855
  • Mod SA0232011-09-30+$55,157= $78,525,012
  • Mod CO0152011-10-20+$0= $78,525,012
  • Mod SA0202011-11-01+$184,577= $78,709,589
  • Mod SA0142011-11-08+$2,218,444= $80,928,033
  • Mod SA0212011-11-08+$17,080,048= $98,008,081
  • Mod CO0162012-02-17+$25,000= $98,033,081
  • Mod SA0242012-04-23+$30,710= $98,063,791
  • Mod SA0282012-11-09+$8,151= $98,071,942
  • Mod SA0292013-03-05+$62,631= $98,134,573
  • Mod SA0312013-05-23+$23,810= $98,158,383
  • Mod SA0322013-07-18+$13,283= $98,171,666
  • Mod SA0342013-12-10+$0= $98,171,666
  • Mod SA0352014-05-21+$94,395= $98,266,061
  • Mod SA0302014-06-04+$2,136,015= $100,402,076
  • Mod CO0172014-06-11+$0= $100,402,076
  • Mod SA0362014-08-28+$8,289= $100,410,365
  • Mod CO0182014-10-23+$5,000= $100,415,365
  • Mod SA0372015-01-07+$673= $100,416,038
  • Mod SA0382015-01-23+$12,253= $100,428,291
  • Mod SA0392015-02-04+$20,062= $100,448,353
  • Mod SA0402015-03-13+$17,639= $100,465,992
  • Mod SA0422015-04-14+$98,792= $100,564,784
  • Mod SA0412015-04-30+$2,469,807= $103,034,591
  • Mod SA0432015-06-10+$7,211= $103,041,802
  • Mod SA0442015-07-20+$22,231= $103,064,033
  • Mod SA0452015-08-28+$24,106= $103,088,139
  • Mod SA0462015-08-28+$17,428= $103,105,567
  • Mod SA0472016-03-28+$4,026= $103,109,593
  • Mod CO0192016-04-14+$75,000= $103,184,593
  • Mod SA0482016-06-14+$1,502,649= $104,687,242
  • Mod SA0492017-07-21+$0= $104,687,242
  • Mod SA0502017-09-19+$0= $104,687,242
  • Mod SA0522017-09-19+$0= $104,687,242
  • Mod SA0512017-10-19+$0= $104,687,242
  • Mod SA0532017-11-13+$0= $104,687,242
  • Mod SA0542017-11-13+$0= $104,687,242
  • Mod SA0552017-12-06+$0= $104,687,242
  • Mod P000012018-12-14-$152,440= $104,534,802
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-04-14+$521,307$521,307NOLA
Mod AC001· OTHER ADMINISTRATIVE ACTION2008-05-05+$0$521,307REPLACEMENT MEDICAL CENTER
Mod AC002· OTHER ADMINISTRATIVE ACTION2008-06-16+$0$521,307REPLACEMENT MEDICAL CENTER
Mod CO01A· CHANGE ORDER2008-11-25+$2,100,000$2,621,307REPLACEMENT MEDICAL CENTER NEW ORLEANS, LA
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-03-17+$36,436,323$39,057,630REPLACEMENT MEDICAL CENTER NEW ORLEANS, LA
Mod CO02· CHANGE ORDER2009-12-15+$60,000$39,117,630VIBRATION TESTING
Mod CO03· CHANGE ORDER2009-12-27+$85,000$39,202,630PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SERVICES REQUIRED TO PREPARE CONSTRUCTION DOCUMENTS
Mod CO05· CHANGE ORDER2010-03-09+$90,000$39,292,630A/E TO WORK WITH IDC COANTRACTOR ON PRECONSTRUCTION SERVICES
Mod SA002· DEFINITIZE CHANGE ORDER2010-03-11+$14,875$39,307,505VIBRATION MONITORING OF THE SLVHCS REPLACEMENT MEDICAL CENTER SITE AND SURROUNDING AREAS.
Mod CO04· CHANGE ORDER2010-03-17+$1,400,000$40,707,505A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES REQUIRED TO PREPARE CDS FOR THE OAN AM BUILDIN…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-24+$2,500$40,710,005LAND SURVEY
Mod SA003· DEFINITIZE CHANGE ORDER2010-05-26+$9,900$40,719,905ADDITIONAL SEIMIC STUDY
Mod CO06· CHANGE ORDER2010-07-23+$95,000$40,814,905A/E TO WORK WITH IDC COANTRACTOR ON PRECONSTRUCTION SERVICE FOR PAN AM ABATEMENT AND RENOVATION
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-23+$13,677$40,828,582A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PERFORM HAZARDOUS MATERIAL TESTING
Mod CO07· CHANGE ORDER2010-08-03+$95,000$40,923,582A/E TO PROVIDE CONSTRUCTION PERIOD SERVICES FOR PAN AM RENOVATION
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-23+$871,235$41,794,817A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES REQUIRED TO PREPARE CDS FOR THE PAN AM BUILDIN…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-17+$85,397$41,880,214A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PERFORM FIN TESTING FOR PAN AM BUILDING
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-21+$328,753$42,208,967A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PERFORM HAZARDOUS MATERIAL TESTING
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$686,981$42,895,948A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES REQUIRED FOR NEW ORLEANS SPACE PLANNING
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-30+$31,231,621$74,127,569A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT FOR CONSTRUCTION DOCUMENTS AND CONSTRUCTION PERIOD SERVICES
Mod CO10· CHANGE ORDER2011-01-06+$95,000$74,222,569A/E TO PROVIDE ASSIST WITH IDC UP/DOWN REVIEW.
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-11+$1,457,617$75,680,186A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PERFORM GEOTECHNICAL ANALYSIS
Mod CO011· CHANGE ORDER2011-02-17+$95,000$75,775,186STRUCTURAL ACCESSMENT OF THE DIXIE BREWERY
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-28+$226,165$76,001,351A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES REQUIRED FOR SPACE PLANING PROGRAM
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-09−$26,849$75,974,502A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR CONSTRUCTION PERIOD SERVICE FOR PA…
Mod CO012· CHANGE ORDER2011-03-14+$90,000$76,064,502PROVIDE RESPONSES TO CONTRACTOR AND SUBCONTRACTORS DURING BIDDING OF EARLY WORK PACKAGE #1
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-23+$88,255$76,152,757A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR TECHNICAL REVIEW AND COST REALISM…
Mod CO013· CHANGE ORDER2011-04-08+$90,000$76,242,757WATER TESTING FOR WICKING SURCHARGE AT SITE
Mod CO014· CHANGE ORDER2011-04-08+$90,000$76,332,757VIBRATION MONITORING
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-18+$604,666$76,937,423A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR RESIGN OF PAN AM BUILDING.
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-26+$161,264$77,098,687A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE TO PERFORM VIBRATION MONITORING DURING TEST PIL…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-02+$1,083,688$78,182,375A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR INTEGRATION OF IDC PROCESS THROUGH…
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-08+$258,764$78,441,139A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR STRUCTURAL, ARCHITECTURAL AND HAZA…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$28,716$78,469,855A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PREPARE SOW FOR HAZARDOUS WASTE REMOVAL
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$55,157$78,525,012A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PLAN IMPACT FOR ARTWORK.
Mod CO015· OTHER ADMINISTRATIVE ACTION2011-10-20+$0$78,525,012CORRECT LINE OF ACCOUNTING
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-01+$184,577$78,709,589A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES FOR MATERIAL TESTING FOR EPW #1 (SURCHARGE)
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-08+$2,218,444$80,928,033A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICE REQUIRED FOR FULL CAMPUS CD
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-08+$17,080,048$98,008,081A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO PROVIDE BIDDING PERIOD SERVICE AND CONTRACT…
Mod CO016· CHANGE ORDER2012-02-17+$25,000$98,033,081PROVIDE SERVICES TO INCORPORATE COST SAVING CHNAGES
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-23+$30,710$98,063,791A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO INSTALL A TOTAL OF SEVEN (7) VIBRATING WIRE…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-09+$8,151$98,071,942A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO ELIMINATE IN DUCT HUMIDIFIERS SERVING THE O…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-05+$62,631$98,134,573A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO REVISE CARDIAC CATH ROOM 3F168 AND ADJACENT…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-05-23+$23,810$98,158,383A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO REVISE THE LAYOUT OF THE ENDOSCOPE CLEANING…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-07-18+$13,283$98,171,666A/E TO PROVIDE ALL LABOR MATERIAL, TOOLS,EQUIPMENT AND SERVICES TO REVISE THE LAYOUT OF THE ELECTRICAL TRANSFO…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-12-10+$0$98,171,666ADMINISTRATIVE SUPPLEMENTAL AGREEMENT TO CHANGE LINE OF ACCOUNTING FOR CHANGE ORDER (CO-016). DEOBLIGATE FUNDI…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-21+$94,395$98,266,061THIS MODIFICATION PROVIDES FOR ARCHITECTURAL AND ENGINEERING SERVICES TO MAKE REVISIONS TO THE DESIGN OF IMAGI…
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-06-04+$2,136,015$100,402,076TO INCORPORATE COST SAVINGS MEASURES FOR EWP # 6 (SKIN) AND EWP # 8 (FULL BUILD OUT) IN ACCORDANCE WITH AGREEM…
Mod CO017· CHANGE ORDER2014-06-11+$0$100,402,076CONSOLIDATION AND REPORTING OF ALL INCIDENTS, ACCIDENTS AND EXPOSURE DATA FOR CONTRACTOR AND SUB-CONTRACTORS
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-28+$8,289$100,410,365THIS MODIFICATION PROVIDES FOR ARCHITECTURAL AND ENGINEERING SERVICES TO MAKE REVISIONS TO THE DESIGN OF THE N…
Mod CO018· CHANGE ORDER2014-10-23+$5,000$100,415,365TO PROVIDE SERVICES TO ADD MEDICAL GAS TO DENTAL ROOMS AND RECONFIGURE ORAL SURGERY ROOMS.
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-07+$673$100,416,038TO PURCHASE A MOISTURE METER USED TO DETECT MOISTURE CONTENT IN MATERIALS TO IDENTIFY POTENTIAL PROBLEMS AND D…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-23+$12,253$100,428,291TO ADD ADDITIONAL SERVICE FOR THE SCOPE OF WORK REQUIRED TO MAKE NECESSARY CHANGES TO ORAL SURGERY ROOMS.
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-04+$20,062$100,448,353FIRE SUPPRESION AND OTHER COMPUTER ROOM RE-DESIGNS
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-13+$17,639$100,465,992TO DESIGN SCOPE OF WORK FOR THE ADDITION OF OPERATOR'S ROOM.
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-04-14+$98,792$100,564,784TO EXTEND STUDIO NOVAS PERIOD OF PERFORMANCE FROM APRIL 15TH, 2015-APRIL 30, 2015.
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-04-30+$2,469,807$103,034,591THIS CONTRACT ACTION ENABLES THE CONTRACTOR, STUDIO NOVA, TO PROVIDE PROFESSIONAL ENGINEERING SERVICES IN SUPP…
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-06-10+$7,211$103,041,802DESIGN SECURITY/HARDWARE REQUIREMENTS TO THE EAST ENTRY DOORS OF THE TLR
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-20+$22,231$103,064,033RE-DESIGN OF PILE CAPS AT THE RESEARCH BLDG AND CHANGES TO THE BLOOD DRAW AREA IN OUTPATIENT.
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-08-28+$24,106$103,088,139BOIL OUT TANK IN OUTPATIENT
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-08-28+$17,428$103,105,567WALK IN FREEZER
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-28+$4,026$103,109,593ACCOUNT FEE TO USE THE VA CFM'S PREFERRED MANAGEMENT INFORMATION SYSTEM TRIRIGA AS PART OF THEIR CONSTRUCTION…
Mod CO019· CHANGE ORDER2016-04-14+$75,000$103,184,593CONSTRUCTION PERIOD SERVICES EXTENSION (1 MONTH) 15 APRIL 2016 - 15 MAY 2016
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-14+$1,502,649$104,687,242PERFORM CONSTRUCTION PERIOD SERVICES FROM A PERIOD OF 4/15/2016 TO 7/1/2017.
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-21+$0$104,687,242PERFORM CONSTRUCTION PERIOD SERVICES FROM A PERIOD OF JULY, 1,2017 TO NOV 30 2017.
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-19+$0$104,687,242REVISE LINE OF ACCOUNTING ONLY
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-19+$0$104,687,242REVISE LINE OF ACCOUNTING ONLY
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-19+$0$104,687,242REVISE LINE OF ACCOUNTING ONLY
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-13+$0$104,687,242REVISE LINE OF ACCOUNTING ONLY
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-13+$0$104,687,242REVISE LINE OF ACCOUNTING ONLY
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-12-06+$0$104,687,242PERFORM CONSTRUCTION PERIOD SERVICES FROM A PERIOD OF DECEMBER 1, 2017 THROUGH JULY 31, 2018.
Mod P00001· CLOSE OUT2018-12-14−$152,440$104,534,802DEOBLIGATION MODIFICATION FOR CLOSEOUT

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI PNK3E1YR7SS6)

AwardOffice · PSC / listingNet obligationsFY
VA25613C0174256-NETWORK CONTRACT OFFICE 16 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$264,091FY2013
VA25613C0153256-NETWORK CONTRACT OFFICE 16 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$316,946FY2013

Other recipients under C114 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VATODEC05LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$1,261FY2018
VATOJUL07LEO A. DALY LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)-$188,468FY2016
VA101CFMP0148CANNON DESIGN, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$79,571FY2011
VACFM05C0095E B A ERNEST BLAND ASSOCIATES, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$53,624FY2011
V101BP0249N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$0FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101183B4P0020_3600_-NONE-_-NONE- · retrieved 2026-09-26.