Description
THE SCOPE OF WORK IS TO PROVIDE A & E SERVICES FOR FEASIBILITY STUDY TO REMOVE SWITCH STATION AT MATHER, CALIFORNIA; PROJECT NUMBER: 612A4-07-777R
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-11-07+$0= $0
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2008-11-07 | +$0 | $0 | THE SCOPE OF WORK IS TO PROVIDE A & E SERVICES FOR FEASIBILITY STUDY TO REMOVE SWITCH STATION AT MATHER, CALIF… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HA2UQ8NZFL82)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26115J2547 | 261-NETWORK CONTRACT OFFICE 21 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $142,493 | FY2015 |
| VA26115J2420 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C1DB · ARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS | $398,888 | FY2015 |
| VA26115D0053 | 261-NETWORK CONTRACT OFFICE 21 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $0 | FY2015 |
| VA26115J0964 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $241,963 | FY2015 |
| VA26115J0548 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $81,233 | FY2015 |
| VA26114J3384 | 261-NETWORK CONTRACT OFFICE 21 · C1DB · ARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS | $395,170 | FY2014 |
Other recipients under C215 from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26114J0649 | GREEN SAND, INC. | 261-NETWORK CONTRACT OFFICE 21 | $19,186 | FY2014 |
| VA26113J1143 | K.F. DAVIS ENGINEERING, INC | 261-NETWORK CONTRACT OFFICE 21 | $79,643 | FY2013 |
| VA26112J1621 | GREEN SAND, INC. | 261-NETWORK CONTRACT OFFICE 21 | $6,416 | FY2012 |
| VA459C14078 | K.F. DAVIS ENGINEERING, INC | 261-NETWORK CONTRACT OFFICE 21 | $169,347 | FY2011 |
| VA640C14785 | ADVANCE DESIGN CONSULTANTS, INC. | 261-NETWORK CONTRACT OFFICE 21 | $122,308 | FY2011 |