Description
MODIFICATION 4 REMOVED REQUIREMENT FOR AS-BUILT DRAWINGS AND CLOSES THE CONTRACT.
Base award description: MODIFICATION #1 FOR ADDITIONAL GAS, WATER, ELECTRIC, FIRE, AND LIFE SAFETY. AE SERVICES FOR THE DESIGN AND CONSTRUCTION DOCUMENTS FOR A NEW MENTAL HEALTH PROGRAMS BUILDING.
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-04-14+$24,353= $24,353
- Mod P000022013-07-10+$3,928= $28,281
- Mod P000042022-06-24-$15,842= $12,439
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-14 | +$24,353 | $24,353 | MODIFICATION #1 FOR ADDITIONAL GAS, WATER, ELECTRIC, FIRE, AND LIFE SAFETY. AE SERVICES FOR THE DESIGN AND CO… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-10 | +$3,928 | $28,281 | OT::IGF::OT MODIFICATION #2 FOR CALCULATIONS TO REPAIR OUT OF PLUMB STAIRCASE. |
| Mod P00004· CHANGE ORDER | 2022-06-24 | −$15,842 | $12,439 | MODIFICATION 4 REMOVED REQUIREMENT FOR AS-BUILT DRAWINGS AND CLOSES THE CONTRACT. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HFL4KRLJ3JB5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26116J3167 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $2,500 | FY2016 |
| VA26115D0052 | 261-NETWORK CONTRACT OFFICE 21 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $0 | FY2015 |
| VA24312F2524 | 243-NETWORK CONTRACTING OFFICE 03 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $548,438 | FY2012 |
| VA640C19150 | 261-NETWORK CONTRACT OFFICE 21 · C114 · HOSPITAL BUILDINGS | $83,820 | FY2011 |
| VA640C19149 | 261-NETWORK CONTRACT OFFICE 21 · C114 · HOSPITAL BUILDINGS | $41,596 | FY2011 |
| VA640C19131 | 261-NETWORK CONTRACT OFFICE 21 · C114 · HOSPITAL BUILDINGS | $66,557 | FY2011 |
Other recipients under C211 from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126N0589 | GDM-AE, INC. | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $179,431 | FY2026 |
| 36C26119N0739 | CONCOURSE FEDERAL GROUP LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $1,188,638 | FY2019 |
| 36C26118C0007 | NAGEL ARCHITECTS, A SERIES OF NAGEL SERVICES LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $956,939 | FY2018 |
| VA26116J0762 | ROMANYK CONSULTING CORPORATION | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $911,074 | FY2016 |
| VA26116J0896 | MEI ARCHITECTS | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $198,992 | FY2016 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA0001_3600_VA261P0224_3600 · retrieved 2026-09-26.