Description
IDIQ TO: PROVIDE EIGHT SEPARATE EASEMENT EXHIBITS THAT DESCRIBE THE CONSTRUCTION RIGHT-OF-WAY THE AGENCY WILL NEED TO OBTAIN FROMO THE EIGHT ADJACENT PROPERTY OWNERS. DETERMINE LOT LINES, OWNERSHIP, & OTHER PERTINENT DATA OF THE EIGHT PROPERTIES ADJACENT TO THE NATCHEZ HISTORIC WALL TO PROCESS EASEMENTS AT NATCHEZ NATIONAL CEMETERY.
Base award description: IDIQ TO: CONTRACTOR TO PROVIDE 3 COMPLETE SETS OF THE FINAL DOCUMENTS IN BOTH HARD COPY AND ELECTRONIC FORM INCLUDING AUTOCAD. THE CONTRACTOR IS ALSO TO PROVIDDE 5 SETS OF COMPLETE BID DOCUMENTS FOR THE HISTORICAL WALL REPAIR AT NATCHEZ NATIONAL CEMETERY. CONTRACTOR SHALL COORDINATE WITH THE STATE OF MISSISSIPPI STATE HISTORICAL PRESERVATION OFFICE AND OBTAIN WRITTEN APPROVAL FOR THIS PROPOSED CORRECTIVE PROJECT.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-07-23+$89,663= $89,663
- Mod SA12010-04-06+$7,123= $96,786
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-07-23 | +$89,663 | $89,663 | IDIQ TO: CONTRACTOR TO PROVIDE 3 COMPLETE SETS OF THE FINAL DOCUMENTS IN BOTH HARD COPY AND ELECTRONIC FORM IN… |
| Mod SA1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-06 | +$7,123 | $96,786 | IDIQ TO: PROVIDE EIGHT SEPARATE EASEMENT EXHIBITS THAT DESCRIBE THE CONSTRUCTION RIGHT-OF-WAY THE AGENCY WILL… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI SBR1NQH63LG3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA786A15P0010 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $5,907 | FY2015 |
| V808Z40000 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $157,835 | FY2014 |
| V914Z40000 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $267,930 | FY2014 |
| V900Z40000 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $281,739 | FY2014 |
| V893Z30004 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $135,487 | FY2013 |
| V897Z30003 | NATIONAL CEMETERY ADMINISTRATION · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $143,085 | FY2013 |
Other recipients under C219 from NATIONAL CEMETERY ADMINISTRATION (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101F16J0053 | LEO A. DALY LLC | NATIONAL CEMETERY ADMINISTRATION | $924,283 | FY2016 |
| VA786A16C0002 | SMITHGROUP, INC. | NATIONAL CEMETERY ADMINISTRATION | $96,815 | FY2016 |
| V876Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $479,058 | FY2015 |
| V927Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $244,998 | FY2015 |
| V885Z50001 | MTR LANDSCAPE ARCHITECTS, LLC | NATIONAL CEMETERY ADMINISTRATION | $227,466 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V866Z90078_3600_VA786AP0081_3600 · retrieved 2026-09-26.