THE CONTRACTOR SHALL PROVIDE THE FOLLOWING SERVICES AT JEFFERSON BARRACKS NATIONAL CEMETERY: LITERATURE REVIEW, PEDESTRIAN SURVEY, AND SECTION 106
Base award description: IDIQ TO: CONTRACTOR IS TO PREPARE CONSTRUCTION DOCUMENTS NEEDED TO CONVERT SECITOIN IJJ TO 5,100 PRE-PLACED CRYPTS AT JEFFERSON BARRACKS NATIONAL CEMETERY.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-09-30+$172,533= $172,533
- Mod SA0012010-06-16+$17,599= $190,132
- Mod SA0022010-07-14+$7,465= $197,597
- Mod SA0032010-09-23+$0= $197,597
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-09-30 | +$172,533 | $172,533 | IDIQ TO: CONTRACTOR IS TO PREPARE CONSTRUCTION DOCUMENTS NEEDED TO CONVERT SECITOIN IJJ TO 5,100 PRE-PLACED CR… |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-16 | +$17,599 | $190,132 | REPAIR DESIGN FOR THE BOX CULVERT BASED ON THE CULVERT INVESTIGATION REPORT. PREAPRE A CULVERT REPIAR PLAN AS… |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-14 | +$7,465 | $197,597 | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING SERVICES AT JEFFERSON BARRACKS NATIONAL CEMETERY: LITERATURE REVIEW… |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-23 | +$0 | $197,597 | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING SERVICES AT JEFFERSON BARRACKS NATIONAL CEMETERY: LITERATURE REVIEW… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI LYU4SGV6Y1B5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| V830Z10002 | NATIONAL CEMETERY ADMINISTRATION · C219 · OTHER ARCHITECTS & ENGIN GEN | $421,146 | FY2011 |
| V817Z10003 | NATIONAL CEMETERY ADMINISTRATION · C219 · OTHER ARCHITECTS & ENGIN GEN | $149,960 | FY2011 |
| V788Z10002 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $265,756 | FY2011 |
| V864Z10001 | NATIONAL CEMETERY ADMINISTRATION · C219 · OTHER ARCHITECTS & ENGIN GEN | $64,611 | FY2011 |
| V788Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $156,488 | FY2011 |
| V860Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $63,288 | FY2011 |
Other recipients under C211 from NATIONAL CEMETERY ADMINISTRATION (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA786A16C0003 | ANDERSON ENGINEERING OF MINNESOTA, LLC | NATIONAL CEMETERY ADMINISTRATION | $28,870 | FY2016 |
| V906Z50003 | ANDERSON ENGINEERING OF MINNESOTA, LLC | NATIONAL CEMETERY ADMINISTRATION | $9,981 | FY2015 |
| V846Z50001 | ANDERSON ENGINEERING OF MINNESOTA, LLC | NATIONAL CEMETERY ADMINISTRATION | $72,801 | FY2015 |
| V911Z50001 | ANDERSON ENGINEERING OF MINNESOTA, LLC | NATIONAL CEMETERY ADMINISTRATION | $28,908 | FY2015 |
| V898Z50001 | ANDERSON ENGINEERING OF MINNESOTA, LLC | NATIONAL CEMETERY ADMINISTRATION | $209,779 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V852Z90273_3600_VA786AP0080_3600 · retrieved 2026-09-27.