Description
A/E DESIGN SERVICES FOR PROJECT 678-11-102, NORMAL POWER UPGRADES PHASE 5, SAVAHCS, TUCSON, AZ. REDUCTION IN CONTRACT AMOUNT FOR SERVICES NOT USED.
Base award description: A/E DESIGN SERVICES FOR PROJECT NO. 678-11-102, NORMAL POWER UPGRADES PHASE 5, SAVAHCS, TUCSON, AZ
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-09-28+$173,267= $173,267
- Mod P000012014-08-07-$4,264= $169,003
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-09-28 | +$173,267 | $173,267 | A/E DESIGN SERVICES FOR PROJECT NO. 678-11-102, NORMAL POWER UPGRADES PHASE 5, SAVAHCS, TUCSON, AZ |
| Mod P00001· FUNDING ONLY ACTION | 2014-08-07 | −$4,264 | $169,003 | A/E DESIGN SERVICES FOR PROJECT 678-11-102, NORMAL POWER UPGRADES PHASE 5, SAVAHCS, TUCSON, AZ. REDUCTION IN C… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JCVYNLU68175)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VATASKORDER21 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $29,990 | FY2017 |
| VACFM05D0137 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $86,455 | FY2014 |
| VA25814J0146 | 258-NETWORK CNTRCT OFF 22G (36C258) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $113,600 | FY2014 |
| VA25814J0147 | 258-NETWORK CNTRCT OFF 22G (36C258) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $90,832 | FY2014 |
| VA25813J2062 | 258-NETWORK CONTRACT OFFICE 18 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $153,185 | FY2013 |
| VA25813J1797 | 258-NETWORK CNTRCT OFF 22G (36C258) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $48,088 | FY2013 |
Other recipients under C211 from 678-TUCSON (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA25812J0387 | SBBL ARCHITECTURE & PLANNING, LLC | 678-TUCSON | $96,463 | FY2012 |
| V678C70385 | WESTLAKE, REED, LESKOSKY, LTD. | 678-TUCSON | -$12,008 | FY2011 |
| VA678C00426 | SBBL ARCHITECTURE & PLANNING, LLC | 678-TUCSON | $81,802 | FY2010 |
| VA678C00376 | SBBL ARCHITECTURE & PLANNING, LLC | 678-TUCSON | $189,669 | FY2010 |
| V678C60506 | SBBL ARCHITECTURE & PLANNING, LLC | 678-TUCSON | -$13,540 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V678C90554_3600_V258P0019_3600 · retrieved 2026-09-26.