Award recordCONTRACT

CBRE HEERY, INC.

PIID V636SI1468· VHA· 636A8-IOWA CITY HEALTH CARE SYSTEM· C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING· FY2011· $186,683 net obligations· UEI G32CXQLSY6U1· IA

Description

VISN23 A/E IDIQ MISCELLANOUS ELECTRICAL IMPROVEMENTS P0003 IGF:CT:IGF

Base award description: VISN23 A/E IDIQ

First action · last action
2011-09-08 · 2014-11-19
Transactions
4
First transaction's obligation
$180,123
Base + all options value (sum of deltas)
$186,683
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
40
SDVOSB flag on record
No
Parent IDV
VA263P1216
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$186,683$0Base award · 2011-09-08 · this action $180,123 · running total $180,123Modification P00001 · 2013-04-09 · this action $0 · running total $180,123Modification P00002 · 2014-02-13 · this action $3,400 · running total $183,523Modification P00003 · 2014-11-19 · this action $3,160 · running total $186,683
  • Base2011-09-08+$180,123= $180,123
  • Mod P000012013-04-09+$0= $180,123
  • Mod P000022014-02-13+$3,400= $183,523
  • Mod P000032014-11-19+$3,160= $186,683
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-09-08+$180,123$180,123VISN23 A/E IDIQ
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-09+$0$180,123VISN23 A/E IDIQ
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-13+$3,400$183,523VISN23 A/E IDIQ MISCELLANOUS ELECTRICAL IMPROVEMENTS P0002
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-11-19+$3,160$186,683VISN23 A/E IDIQ MISCELLANOUS ELECTRICAL IMPROVEMENTS P0003 IGF:CT:IGF

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI G32CXQLSY6U1)

AwardOffice · PSC / listingNet obligationsFY
36C26320C0070NETWORK CONTRACT OFFICE 23 (36C263) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$11,834FY2020
VA26316J0453NETWORK CONTRACT OFFICE 23 (36C263) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$184,479FY2016
VA26315J0822NETWORK CONTRACT OFFICE 23 (36C263) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$60,699FY2015
VA26315J0378NETWORK CONTRACT OFFICE 23 (36C263) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$453,955FY2015
VA26315J0269636-NEBRASKA WESTERN-IOWA · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$49,972FY2015
VA26314J1028636A6-CENTRAL IOWA HEALTH CARE SYSTEM · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$315,263FY2014

Other recipients under C211 from 636A8-IOWA CITY HEALTH CARE SYSTEM (most recent first)

AwardRecipientOfficeNet obligationsFY
VA26313J0377ANDERSON ENGINEERING OF MINNESOTA, LLC636A8-IOWA CITY HEALTH CARE SYSTEM$23,582FY2013
VA26313J0097ALESIA ARCHITECTURE PC636A8-IOWA CITY HEALTH CARE SYSTEM$10,890FY2013
VA26312J0594SHIVE-HATTERY, INC.636A8-IOWA CITY HEALTH CARE SYSTEM$97,462FY2012
VA636SI1475THE SCHEMMER ASSOCIATES INC.636A8-IOWA CITY HEALTH CARE SYSTEM$44,654FY2011
VA636SI1432SHIVE-HATTERY, INC.636A8-IOWA CITY HEALTH CARE SYSTEM$10,940FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V636SI1468_3600_VA263P1216_3600 · retrieved 2026-09-26.