Description
AE SERVICES FOR VA GREATER LOS ANGELES BUILDING 500 FRONT LOBBY AND ENTRY REMODEL
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-01-19+$89,870= $89,870
- Mod P000012016-01-29-$7= $89,863
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-01-19 | +$89,870 | $89,870 | AE SERVICES FOR VA GREATER LOS ANGELES BUILDING 500 FRONT LOBBY AND ENTRY REMODEL |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | −$7 | $89,863 | AE SERVICES FOR VA GREATER LOS ANGELES BUILDING 500 FRONT LOBBY AND ENTRY REMODEL |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI VMA9KU45CDZ3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26216J0131 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $0 | FY2016 |
| VA26216P0121 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $70,000 | FY2016 |
| VA26216P0107 | 258-NETWORK CNTRCT OFF 22G (36C258) · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $0 | FY2016 |
| VA26216P0013 | 262-NETWORK CONTRACT OFFICE 22 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $77,267 | FY2016 |
| VA26216P0014 | 262-NETWORK CONTRACT OFFICE 22 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $43,138 | FY2016 |
| VA26213J1526 | 262-NETWORK CONTRACT OFFICE 22 · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $129,893 | FY2013 |
Other recipients under C211 from 262-NETWORK CONTRACT OFFICE 22 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26214P0896 | DWYER ENGINEERING CORPORATION | 262-NETWORK CONTRACT OFFICE 22 | $3,750 | FY2014 |
| VA26214J4180 | SCHWAB ENGINEERING, INC. | 262-NETWORK CONTRACT OFFICE 22 | $199,208 | FY2014 |
| VA26214J2674 | KAL ARCHITECTS, INC. | 262-NETWORK CONTRACT OFFICE 22 | $91,882 | FY2014 |
| VA26213J3937 | SRD ARCHITECTS INC | 262-NETWORK CONTRACT OFFICE 22 | $79,904 | FY2013 |
| VA26212J2251 | LEO A. DALY LLC | 262-NETWORK CONTRACT OFFICE 22 | $348,582 | FY2012 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V600P7301TO018_3600_V600P7301_3600 · retrieved 2026-09-26.