Description
MISC CREDITS.
Base award description: CONTRACTOR TO PROVIDE CONSTRUCTION SERVICES TO COMPLETE THE RETROFIT INFRASTRUCTURE DESIGN-BID-BUILD PROJECT AT THE WHITE CITY SORCC.
Modification chain · 8 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-09-24+$13,493,000= $13,493,000
- Mod P000012021-07-22+$0= $13,493,000
- Mod P000022021-08-11+$169,348= $13,662,348
- Mod P000032021-09-24+$103,415= $13,765,763
- Mod P000052022-02-07-$6,052= $13,759,711
- Mod P000062022-09-15+$682,508= $14,442,219
- Mod P000072023-08-01+$0= $14,442,219
- Mod P000082023-11-02+$0= $14,442,219
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-09-24 | +$13,493,000 | $13,493,000 | CONTRACTOR TO PROVIDE CONSTRUCTION SERVICES TO COMPLETE THE RETROFIT INFRASTRUCTURE DESIGN-BID-BUILD PROJECT A… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-07-22 | +$0 | $13,493,000 | TO ALLOW FOR SAME DAY FIELD CORRECTIONS TO OCCUR VIA A "MENU" PRICING SYSTEM NEGOTIATED WITH THE CONTRACTOR |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-08-11 | +$169,348 | $13,662,348 | TO TV AND CLEAN LATERAL PIPELINES NOT COVERED IN THE CONTRACT, ALSO TO ALLOW FOR A NEW SEWER PIPE TO BE PLACED… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-24 | +$103,415 | $13,765,763 | UNFORESEEN SITE CONDITION FOR SUBGRADE UTILITY WORK |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-07 | −$6,052 | $13,759,711 | REA CREDIT DESCOPE |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-09-15 | +$682,508 | $14,442,219 | UNFORESEEN SITE CONDITION HAS CALLED FOR A STORM WATER LIFT STATION TO ACHIEVE THE HEIGHT NEEDED TO ALLOW FOR… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-08-01 | +$0 | $14,442,219 | MISC CREDITS. |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-11-02 | +$0 | $14,442,219 | MISC CREDITS. |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI EDHFNURX9MD4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24222C0016 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $3,539,268 | FY2022 |
| 36C24922C0017 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $10,336,463 | FY2022 |
| 36C78621C0090 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $14,001,903 | FY2021 |
| 36C24221C0144 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $14,750,085 | FY2021 |
| 36C25221C0057 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $0 | FY2021 |
| 36C77621C0097 | PCAC (36C776) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $12,294,910 | FY2021 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36E77620C0077_3600_-NONE-_-NONE- · retrieved 2026-09-26.