Description
CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER
Modification chain · 11 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2019-09-28+$16,746,000= $16,746,000
- Mod P000012020-02-18-$0= $16,746,000
- Mod P000022020-06-01+$8,485= $16,754,485
- Mod P000032020-09-30+$1,504,852= $18,259,337
- Mod P000042021-03-16+$148,901= $18,408,238
- Mod P000052021-06-03+$122,784= $18,531,022
- Mod P000062021-12-03+$120,019= $18,651,040
- Mod P000072023-09-29+$136,774= $18,787,814
- Mod P000082023-12-15+$0= $18,787,814
- Mod P000092024-02-13+$0= $18,787,814
- Mod P000102024-04-12+$0= $18,787,814
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2019-09-28 | +$16,746,000 | $16,746,000 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2020-02-18 | −$0 | $16,746,000 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00002· CHANGE ORDER | 2020-06-01 | +$8,485 | $16,754,485 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00003· CHANGE ORDER | 2020-09-30 | +$1,504,852 | $18,259,337 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-16 | +$148,901 | $18,408,238 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00005· CHANGE ORDER | 2021-06-03 | +$122,784 | $18,531,022 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00006· CHANGE ORDER | 2021-12-03 | +$120,019 | $18,651,040 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-09-29 | +$136,774 | $18,787,814 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-12-15 | +$0 | $18,787,814 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-02-13 | +$0 | $18,787,814 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-04-12 | +$0 | $18,787,814 | CORRECT CAMPUS WATER SYSTEM AND REPLACE WATER TOWER |
Related awards · 2
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI N6RGMJ2NE6F4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C77622C0012 | PCAC (36C776) · Y1NE · CONSTRUCTION OF WATER SUPPLY FACILITIES | $8,542,264 | FY2022 |
| 36C26121P0727 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1NZ · MAINTENANCE OF OTHER UTILITIES | $3,476 | FY2021 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36E77619C0067_3600_-NONE-_-NONE- · retrieved 2026-09-26.