Description
GENERATOR REPAIR
Base award description: PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET IT RUNNING AGAIN.
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2024-06-27+$5,879= $5,879
- Mod P000012024-08-19+$0= $5,879
- Mod P000022024-08-19+$0= $5,879
- Mod P000032024-08-22+$11,080= $16,958
- Mod P000042024-09-20+$0= $16,958
- Mod P000062024-09-26+$15,301= $32,259
- Mod P000072025-08-20-$5,628= $26,631
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2024-06-27 | +$5,879 | $5,879 | PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET I… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-08-19 | +$0 | $5,879 | PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET I… |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2024-08-19 | +$0 | $5,879 | PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET I… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-08-22 | +$11,080 | $16,958 | PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET I… |
| Mod P00004· OTHER ADMINISTRATIVE ACTION | 2024-09-20 | +$0 | $16,958 | PIKES PEAK NATIONAL CEMETERY GENERATOR REPAIR. REPLACING SEVERAL ELECTRONIC COMPONENTS ON A GENERATOR TO GET I… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-09-26 | +$15,301 | $32,259 | GENERATOR REPAIR. |
| Mod P00007· OTHER ADMINISTRATIVE ACTION | 2025-08-20 | −$5,628 | $26,631 | GENERATOR REPAIR |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KK9NZL79J853)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25919C0194 | NETWORK CONTRACT OFFICE 19 (36C259) · N059 · INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $32,014 | FY2019 |
| VA101V17P0393 | VBA FIELD CONTRACTING (36C10E) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $3,650 | FY2017 |
| VA24917P1798 | 621-MOUNTAIN HOME (00621) · J099 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS | $21,875 | FY2017 |
Other recipients under J059 from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78625P50101 | PMGR DEVELOPMENT GROUP CORP | NATIONAL CEMETERY ADMIN (36C786) | $8,996 | FY2025 |
| 36C78624N0820 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | NATIONAL CEMETERY ADMIN (36C786) | $14,109 | FY2024 |
| 36C78623N0853 | PANACEA CONSTRUCTION GROUP LLC | NATIONAL CEMETERY ADMIN (36C786) | $34,968 | FY2023 |
| 36C78622P0236 | GLOBALNET & ASSOCIATES, LLC | NATIONAL CEMETERY ADMIN (36C786) | $3,923 | FY2022 |
| 36C78622F0076 | COLOSSAL CONTRACTING LLC | NATIONAL CEMETERY ADMIN (36C786) | $4,256 | FY2022 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C78624P50345_3600_-NONE-_-NONE- · retrieved 2026-09-26.