Description
MODIFICATION TO REPLACE 500 YARDS OF TOP SOIL AND LEAKING 3" IRRIGATION VALVE AT PIKES PEAK NATIONAL CEMETERY
Base award description: CONSTRUCT IN-GROUND CREMAINS SECTION AT PIKES PEAK NATIONAL CEMETERY
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2024-04-15+$385,950= $385,950
- Mod P000012024-09-27+$20,718= $406,669
- Mod P000022024-11-04+$14,889= $421,558
- Mod P000032025-10-01+$32,458= $454,016
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2024-04-15 | +$385,950 | $385,950 | CONSTRUCT IN-GROUND CREMAINS SECTION AT PIKES PEAK NATIONAL CEMETERY |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-09-27 | +$20,718 | $406,669 | ADDITION OF IRRIGATION LINES AROUND NEW IN-GROUND CREMAINS SECTION AT PIKES PEAK NATIONAL CEMETERY |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-11-04 | +$14,889 | $421,558 | REMOVAL OF OLD CROSS-CONNECTING LINE AND RELOCATION OF EXISTING CONTROL VALVES TO NEW MAIN AT PIKES PEAK NATIO… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-10-01 | +$32,458 | $454,016 | MODIFICATION TO REPLACE 500 YARDS OF TOP SOIL AND LEAKING 3" IRRIGATION VALVE AT PIKES PEAK NATIONAL CEMETERY |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KGR6FH6BM874)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25726P0432 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J056 · MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS | $107,867 | FY2026 |
| 36C25626P0511 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · J056 · MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS | $46,975 | FY2026 |
| 36C25726P0341 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · 6515 · MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES | $18,090 | FY2026 |
| 36C25625C0072 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $1,490,077 | FY2025 |
| 36C25725P0977 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · 6530 · HOSPITAL FURNITURE, EQUIPMENT, UTENSILS, AND SUPPLIES | $0 | FY2025 |
| 36C24625P1653 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $75,198 | FY2025 |
Other recipients under Y1PZ from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78626N0454 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $301,173 | FY2026 |
| 36C78626N0418 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $59,741 | FY2026 |
| 36C78626N0443 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $53,627 | FY2026 |
| 36C78626N0448 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $20,506 | FY2026 |
| 36C78626N0441 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $18,843 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C78624N0492_3600_36C78619D0154_3600 · retrieved 2026-09-26.