Description
FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY: NO COST TIME EXTENSION
Base award description: FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2019-09-28+$55,114= $55,114
- Mod P000012020-07-24+$0= $55,114
- Mod P000022020-07-24+$0= $55,114
- Mod P0002A2020-08-07+$0= $55,114
- Mod P000032020-10-01+$0= $55,114
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2019-09-28 | +$55,114 | $55,114 | FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2020-07-24 | +$0 | $55,114 | FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY - TIME EXTENSION |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2020-07-24 | +$0 | $55,114 | FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY: TIME EXTENSION |
| Mod P0002A· OTHER ADMINISTRATIVE ACTION | 2020-08-07 | +$0 | $55,114 | FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2020-10-01 | +$0 | $55,114 | FIX&PAINT COMMITTAL SHELTER DOOR, M&R, SACRAMENTO VALLEY NATIONAL CEMETERY: NO COST TIME EXTENSION |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HZLYDPQNVA87)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25723C0061 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $56,890 | FY2023 |
| 36C78622N0976 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $0 | FY2022 |
| 36C78622N0566 | NATIONAL CEMETERY ADMIN (36C786) · Y1KF · CONSTRUCTION OF DREDGING FACILITIES | $526,962 | FY2022 |
| 36C78622N0772 | NATIONAL CEMETERY ADMIN (36C786) · Y1NZ · CONSTRUCTION OF OTHER UTILITIES | $95,978 | FY2022 |
| 36C78621N1314 | NATIONAL CEMETERY ADMIN (36C786) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $23,078 | FY2021 |
| 36C78621N1204 | NATIONAL CEMETERY ADMIN (36C786) · N071 · INSTALLATION OF EQUIPMENT- FURNITURE | $26,768 | FY2021 |
Other recipients under N056 from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78618P0632 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | NATIONAL CEMETERY ADMIN (36C786) | $43,258 | FY2018 |
| VA786A17C0029 | BTR ENTERPRISES OF SC LLC | NATIONAL CEMETERY ADMIN (36C786) | $16,880 | FY2017 |
| VA786A17C0030 | BTR ENTERPRISES OF SC LLC | NATIONAL CEMETERY ADMIN (36C786) | $13,985 | FY2017 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C78619N0490_3600_36C78619D0161_3600 · retrieved 2026-09-26.