Description
HONOR GUARD TRAILER SJVNC PACIFIC DISTRICT'S MATOC: SIDEWALK INSTALLATION
Base award description: HONOR GUARD TRAILER PACIFIC DISTRICT'S MATOC
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2019-09-28+$151,910= $151,910
- Mod P000012019-10-28+$0= $151,910
- Mod P000C22020-01-08+$4,895= $156,805
- Mod P000032020-03-11+$6,865= $163,670
- Mod P000042020-04-14+$10,577= $174,246
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2019-09-28 | +$151,910 | $151,910 | HONOR GUARD TRAILER PACIFIC DISTRICT'S MATOC |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2019-10-28 | +$0 | $151,910 | HONOR GUARD TRAILER PACIFIC DISTRICT'S MATOC |
| Mod P000C2· CHANGE ORDER | 2020-01-08 | +$4,895 | $156,805 | HONOR GUARD TRAILER SJVNC PACIFIC DISTRICT'S MATOC: INSTALLATION OF A WATER SERVICE LINE, SANITARY SEWER LATE… |
| Mod P00003· CHANGE ORDER | 2020-03-11 | +$6,865 | $163,670 | HONOR GUARD TRAILER SJVNC PACIFIC DISTRICT'S MATOC: ASBESTOS ABATEMENT |
| Mod P00004· CHANGE ORDER | 2020-04-14 | +$10,577 | $174,246 | HONOR GUARD TRAILER SJVNC PACIFIC DISTRICT'S MATOC: SIDEWALK INSTALLATION |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HZLYDPQNVA87)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25723C0061 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $56,890 | FY2023 |
| 36C78622N0976 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $0 | FY2022 |
| 36C78622N0566 | NATIONAL CEMETERY ADMIN (36C786) · Y1KF · CONSTRUCTION OF DREDGING FACILITIES | $526,962 | FY2022 |
| 36C78622N0772 | NATIONAL CEMETERY ADMIN (36C786) · Y1NZ · CONSTRUCTION OF OTHER UTILITIES | $95,978 | FY2022 |
| 36C78621N1314 | NATIONAL CEMETERY ADMIN (36C786) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $23,078 | FY2021 |
| 36C78621N1204 | NATIONAL CEMETERY ADMIN (36C786) · N071 · INSTALLATION OF EQUIPMENT- FURNITURE | $26,768 | FY2021 |
Other recipients under Y1FZ from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78618P0944 | SPEES LLC | NATIONAL CEMETERY ADMIN (36C786) | $175,941 | FY2018 |
| 36C78618P0919 | BEAR RUN, INC | NATIONAL CEMETERY ADMIN (36C786) | $0 | FY2018 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C78619N0488_3600_36C78619D0161_3600 · retrieved 2026-09-26.