Description
DEOBLIGATE FUNDS FOR CLOSEOUT_ CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GRAVE EXPANSION- ARCHITECT ENGINEER IDIQ CONTINENTAL DISTRICT
Base award description: CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GRAVE EXPANSION- ARCHITECT ENGINEER IDIQ CONTINENTAL DISTRICT
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2019-09-26+$286,354= $286,354
- Mod P000012021-03-03+$0= $286,354
- Mod P000022021-06-16+$0= $286,354
- Mod P000032021-11-17-$17,092= $269,261
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2019-09-26 | +$286,354 | $286,354 | CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GRAVE EXPANSION- ARCHITECT ENGINEER IDIQ CONTINENTAL DI… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-03 | +$0 | $286,354 | NO COST POP EXTENSION_ CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GRAVE EXPANSION- ARCHITECT ENGIN… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-06-16 | +$0 | $286,354 | NO COST POP EXTENSION & CONVERT CAD DRAWINGS TO GIS_ CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GR… |
| Mod P00003· CLOSE OUT | 2021-11-17 | −$17,092 | $269,261 | DEOBLIGATE FUNDS FOR CLOSEOUT_ CONSTRUCTION PERIOD INSPECTION SERVICE (CPIS) FT BLISS GRAVE EXPANSION- ARCHITE… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI M9HELDR3J8J3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C78622N0883 | NATIONAL CEMETERY ADMIN (36C786) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $41,699 | FY2022 |
| 36C78622N0313 | NATIONAL CEMETERY ADMIN (36C786) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $937,391 | FY2022 |
| 36C78621N1375 | NATIONAL CEMETERY ADMIN (36C786) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $430,447 | FY2021 |
| 36C78621N1141 | NATIONAL CEMETERY ADMIN (36C786) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $86,110 | FY2021 |
| 36C78621N1190 | NATIONAL CEMETERY ADMIN (36C786) · C1LB · ARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $89,899 | FY2021 |
| 36C78621N1039 | NATIONAL CEMETERY ADMIN (36C786) · C1EB · ARCHITECT AND ENGINEERING- CONSTRUCTION: MAINTENANCE BUILDINGS | $24,335 | FY2021 |
Other recipients under C211 from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78626N0062 | INTEGRITY - THE LA GROUP JOINT VENTURE, LLC | NATIONAL CEMETERY ADMIN (36C786) | $96,601 | FY2026 |
| 36C78626N0341 | INTEGRITY - THE LA GROUP JOINT VENTURE, LLC | NATIONAL CEMETERY ADMIN (36C786) | $341,971 | FY2026 |
| 36C78626N0339 | ARCHITURA CORPORATION | NATIONAL CEMETERY ADMIN (36C786) | $390,291 | FY2026 |
| 36C78626N0326 | ATRIAX, P.L.L.C. | NATIONAL CEMETERY ADMIN (36C786) | $83,900 | FY2026 |
| 36C78626N0284 | ATRIAX, P.L.L.C. | NATIONAL CEMETERY ADMIN (36C786) | $35,363 | FY2026 |