Description
THE MODIFICATION RESOLVES RFP 15, AND CLOSES OUT THE REMAINING CREDITS FOR THE DATA DROPS / PORTS, AND SETTLES THE CONTRACTOR'S CLAIM FOR THE DISPOSAL OF THEIR TEMPORARY COOLING UNIT.
Base award description: THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT.
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2024-04-23+$13,463,673= $13,463,673
- Mod P000012025-03-25+$0= $13,463,673
- Mod P000022025-05-12-$238= $13,463,435
- Mod P000032025-07-09-$114= $13,463,321
- Mod P000042026-02-24-$92,090= $13,371,231
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2024-04-23 | +$13,463,673 | $13,463,673 | THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-03-25 | +$0 | $13,463,673 | THE MODIFICATION INCORPORATES THE CHANGES ASSOCIATED WITH RFP 02, 03, 05 - 09, AND ADDS UNFORESEEN ASBESTOS AB… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-05-12 | −$238 | $13,463,435 | THE MODIFICATION RESOLVES RFP 10, 13, AND REA 02 AND 04, AND REVISED CONTRACT CLAUSES IAW EOS. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-07-09 | −$114 | $13,463,321 | THE MODIFICATION INCORPORATES CHANGES ASSOCIATED WITH RFP 11, 12, 14, REA 5, 6, AND A CREDIT FOR DATA DROP RED… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-02-24 | −$92,090 | $13,371,231 | THE MODIFICATION RESOLVES RFP 15, AND CLOSES OUT THE REMAINING CREDITS FOR THE DATA DROPS / PORTS, AND SETTLES… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI J1LWSNNJ6EY9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C77625C0087 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $27,849,345 | FY2025 |
| 36C25925P1209 | NETWORK CONTRACT OFFICE 19 (36C259) · J063 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | $291,843 | FY2025 |
| 36C77625C0082 | PCAC (36C776) · Y1BG · CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES | $44,904,518 | FY2025 |
| 36C77625C0096 | PCAC (36C776) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $42,895,816 | FY2025 |
| 36C77625C0072 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $21,715,378 | FY2025 |
| 36C77625C0074 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $16,851,050 | FY2025 |
Other recipients under Z2DA from PCAC (36C776) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C77626C0077 | SAWTOOTH CONSTRUCTION JV II LLC | PCAC (36C776) | $32,322,466 | FY2026 |
| 36C77626C0079 | BHPE LLC | PCAC (36C776) | $279,500 | FY2026 |
| 36C77626C0084 | GREENSTONE CONSTRUCTION, INC. | PCAC (36C776) | $10,380,800 | FY2026 |
| 36C77626N0183 | ABRAMS GROUP CONSTRUCTION LLC | PCAC (36C776) | $128,369 | FY2026 |
| 36C77626P0052 | BHPE LLC | PCAC (36C776) | $329,500 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C77624C0052_3600_-NONE-_-NONE- · retrieved 2026-09-26.