CIVIL ENGINEERING MODS AT DUCT BANK & MANHOLE, HVAC EQUIPMENT RELOCATION, & IDLE LABOR AND EQUIPMENT COST IMPACTED DELAYS DUE TO VA-REQUIRED BROKEN VALVE REPLACEMENT. EXTENDS THE POP TO 28 OCT 26 & INCREASES CONTRACT PRICE TO $47,103,063.00.
Base award description: INDIANAPOLIS VAMC EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2023-11-01+$44,947,000= $44,947,000
- Mod P000012024-07-25+$303,036= $45,250,036
- Mod P000022025-03-18+$108,225= $45,358,261
- Mod P000032026-06-02+$1,371,760= $46,730,021
- Mod P000042026-06-23+$373,043= $47,103,064
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2023-11-01 | +$44,947,000 | $44,947,000 | INDIANAPOLIS VAMC EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION |
| Mod P00001· CHANGE ORDER | 2024-07-25 | +$303,036 | $45,250,036 | MODIFICATION P00001 - LEAD ABATEMENT AND ABOVE CEILING SURVEY FOR INDIANAPOLIS VAMC EHRM INFRASTRUCTURE UPGRAD… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-03-18 | +$108,225 | $45,358,261 | MODIFICATION P00002 - REMEDY SEVERAL HEALTH & SAFETY ISSUES FOR INDIANAPOLIS VAMC EHRM INFRASTRUCTURE UPGRADES… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-06-02 | +$1,371,760 | $46,730,021 | MODIFICATION P00003 - REMEDY SEVERAL ELECTRICAL DESIGN MISSTEPS FOR INDIANAPOLIS VAMC EHRM INFRASTRUCTURE UPGR… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-06-23 | +$373,043 | $47,103,064 | CIVIL ENGINEERING MODS AT DUCT BANK & MANHOLE, HVAC EQUIPMENT RELOCATION, & IDLE LABOR AND EQUIPMENT COST IMPA… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI LERTSV4EQKB3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25026P0671 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · N054 · INSTALLATION OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING | $24,923 | FY2026 |
| 36C10F25C50000 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $81,146,200 | FY2025 |
| 36C26225P0273 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $75,000 | FY2025 |
| 36C24124N1261 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $2,000 | FY2024 |
| 36C24124D0105 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $0 | FY2024 |
| 36C26224D0070 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $0 | FY2024 |
Other recipients under Y1DA from PCAC (36C776) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C77626C0090 | BLUEWAY ONE JV LLC | PCAC (36C776) | $32,994,000 | FY2026 |
| 36C77626C0059 | RWH CAPITAL LLC | PCAC (36C776) | $14,974,063 | FY2026 |
| 36C77626C0082 | VETERAN ELEVATED SOLUTIONS, LLC | PCAC (36C776) | $12,599,622 | FY2026 |
| 36C77626N0163 | ABRAMS GROUP CONSTRUCTION LLC | PCAC (36C776) | $1,000 | FY2026 |
| 36C77626N0164 | AMERITECH CONTRACTING LLC | PCAC (36C776) | $1,000 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C77624C0007_3600_-NONE-_-NONE- · retrieved 2026-09-26.