Description
REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRONIC DIALYSIS PROGRAM AND SLEEP PROGRAM AT THE CAMPUS.
Modification chain · 23 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2021-02-04+$10,082,402= $10,082,402
- Mod P000012021-08-27+$7,500= $10,089,902
- Mod P000022021-09-10+$104,600= $10,194,502
- Mod P000032021-11-05+$0= $10,194,502
- Mod P000052021-11-05+$16,726= $10,211,228
- Mod P000062022-04-04+$18,276= $10,229,504
- Mod P000072022-05-16+$40,988= $10,270,492
- Mod P000082022-09-27+$5,165= $10,275,658
- Mod P000092023-03-29+$118,381= $10,394,039
- Mod P000102024-03-13+$44,895= $10,438,934
- Mod P000112024-05-31+$27,394= $10,466,328
- Mod P000122024-07-22+$40,830= $10,507,158
- Mod P000132024-09-30-$31,585= $10,475,573
- Mod P000142025-02-21+$38,192= $10,513,765
- Mod P000152025-04-16+$0= $10,513,765
- Mod P000162025-05-12+$61,960= $10,575,725
- Mod P000172025-07-03+$269,821= $10,845,546
- Mod P000182025-07-18+$0= $10,845,546
- Mod P000192025-09-11+$121,746= $10,967,292
- Mod P000202025-12-16+$0= $10,967,292
- Mod P000212026-01-06+$233,750= $11,201,042
- Mod P000222026-06-03+$35,188= $11,236,230
- Mod P000232026-07-08+$0= $11,236,230
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2021-02-04 | +$10,082,402 | $10,082,402 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00001· CHANGE ORDER | 2021-08-27 | +$7,500 | $10,089,902 | DRAWINGS OMITTED SEVERAL TREES NEEDING REMOVAL, WHILE TO PREVENT A WORK STOPPAGE A NTE OF $7,500 HAS BEEN ISSU… |
| Mod P00002· CHANGE ORDER | 2021-09-10 | +$104,600 | $10,194,502 | UNFORESEEN SITE CONDITIONS, SUBGRADE ISSUES SUCH AS AN ABANDONDED TRANSITE LINE, LOCATION OF UTILITIES |
| Mod P00003· DEFINITIZE CHANGE ORDER | 2021-11-05 | +$0 | $10,194,502 | TO DEFINITIZE CHANGE ORDER 1 TREE REMOVAL |
| Mod P00005· CHANGE ORDER | 2021-11-05 | +$16,726 | $10,211,228 | TO ADD AN ADDITIONAL SEWER LINE TO ACCOMMODATE THE DIALYSIS BOXES WHICH WOULD HAVE OVERLOADED THE ORIGINAL LIN… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-04-04 | +$18,276 | $10,229,504 | TO UPGRADE CAT CABLING TO BE EHRM COMPLIANT |
| Mod P00007· CHANGE ORDER | 2022-05-16 | +$40,988 | $10,270,492 | TO CREATE A SANITARY SEWER CONNECTION AS THE AS-BUILT DRAWINGS SHOWED AN INACTIVE/ABANDONED LINE |
| Mod P00008· DEFINITIZE CHANGE ORDER | 2022-09-27 | +$5,165 | $10,275,658 | TO DEFINITIZE WORK PREFORMED UNDER MODIFICATION 5 |
| Mod P00009· DEFINITIZE CHANGE ORDER | 2023-03-29 | +$118,381 | $10,394,039 | TO CORRECT VARIOUS ISSUES WHICH AROSE DURING CONSTRUCTION AND WERE PRESENTED VIA RFIS AND TO DEFINITIZE MODIFI… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-03-13 | +$44,895 | $10,438,934 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-05-31 | +$27,394 | $10,466,328 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-07-22 | +$40,830 | $10,507,158 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-09-30 | −$31,585 | $10,475,573 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-02-21 | +$38,192 | $10,513,765 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00015· CHANGE ORDER | 2025-04-16 | +$0 | $10,513,765 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-05-12 | +$61,960 | $10,575,725 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-07-03 | +$269,821 | $10,845,546 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00018· CHANGE ORDER | 2025-07-18 | +$0 | $10,845,546 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-09-11 | +$121,746 | $10,967,292 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00020· CHANGE ORDER | 2025-12-16 | +$0 | $10,967,292 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-01-06 | +$233,750 | $11,201,042 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-06-03 | +$35,188 | $11,236,230 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-07-08 | +$0 | $11,236,230 | REQUIREMENT ENTAILS THE RENOVATION OR CONSTRUCTION OF SPACES IN THE MARTINEZ VAMC IN ORDER TO IMPROVE THE CHRO… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI NM6KLD3BTZY9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26126C0058 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $7,984,201 | FY2026 |
| 36C26126C0052 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1AA · MAINTENANCE OF OFFICE BUILDINGS | $598,358 | FY2026 |
| 36C26126C0045 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS | $1,659,309 | FY2026 |
| 36C26126C0048 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $17,341,422 | FY2026 |
| 36C26126P0015 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J069 · MAINT/REPAIR/REBUILD OF EQUIPMENT- TRAINING AIDS AND DEVICES | $49,963 | FY2026 |
| 36C26125C0056 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $251,456 | FY2025 |
Other recipients under Y1DA from PCAC (36C776) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C77626C0090 | BLUEWAY ONE JV LLC | PCAC (36C776) | $32,994,000 | FY2026 |
| 36C77626C0059 | RWH CAPITAL LLC | PCAC (36C776) | $14,974,063 | FY2026 |
| 36C77626C0082 | VETERAN ELEVATED SOLUTIONS, LLC | PCAC (36C776) | $12,599,622 | FY2026 |
| 36C77626N0163 | ABRAMS GROUP CONSTRUCTION LLC | PCAC (36C776) | $1,000 | FY2026 |
| 36C77626N0164 | AMERITECH CONTRACTING LLC | PCAC (36C776) | $1,000 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C77621C0014_3600_-NONE-_-NONE- · retrieved 2026-09-26.