Description
PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA. MODIFICATION TO ADD A CHILLED WATER LOOP.
Base award description: PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2026-05-13+$1,222,891= $1,222,891
- Mod P000012026-06-01+$0= $1,222,891
- Mod P000022026-08-19+$0= $1,222,891
- Mod P000032026-08-19+$28,620= $1,251,511
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2026-05-13 | +$1,222,891 | $1,222,891 | PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA. |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-06-01 | +$0 | $1,222,891 | PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA. |
| Mod P00002· FUNDING ONLY ACTION | 2026-08-19 | +$0 | $1,222,891 | PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA. ADMIN MODIFICATION TO MOVE FUNDING TO… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-08-19 | +$28,620 | $1,251,511 | PROJECT NUMBER: 618-24-200, CHILLED WATER STUDY, MINNEAPOLIS, MINNESOTA. MODIFICATION TO ADD A CHILLED WATER L… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI NB1SW7MGPU76)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24726N0319 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $346,503 | FY2026 |
| 36C25626N0595 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $231,196 | FY2026 |
| 36C24926N0509 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $1,425,408 | FY2026 |
| 36C24926N0411 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $238,925 | FY2026 |
| 36C77625N1314 | PCAC (36C776) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $2,500 | FY2025 |
| 36C77625D0018 | PCAC (36C776) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $0 | FY2025 |
Other recipients under C1DA from NETWORK CONTRACT OFFICE 23 (36C263) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26326N0679 | AE WORKS LTD | NETWORK CONTRACT OFFICE 23 (36C263) | $702,349 | FY2026 |
| 36C26326N0681 | HORIZON RDG JV, LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $1,382,857 | FY2026 |
| 36C26326C0059 | ALESIA ARCHITECTURE PC | NETWORK CONTRACT OFFICE 23 (36C263) | $268,349 | FY2026 |
| 36C26326N0654 | NORTHEAST INFRASTRUCTURE LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $841,372 | FY2026 |
| 36C26326N0603 | HORIZON RDG JV, LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $181,834 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26326N0514_3600_36C77625D0018_3600 · retrieved 2026-09-26.