Description
ALL WORK ASSOCIATED WITH THE AE DESIGN PROJECT INCLUDING THE PREPARATION OF CONSTRUCTION DOCUMENTS AND SITE INVESTIGATIONS FOR RELOCATE WOMEN?S HEALTH CLINIC AND SPECIALTY CLINICS TO BUILDING 50 FOR THE IOWA CITY VA HEALTH CARE SYSTEM.
Base award description: AE DESIGN FOR PROJECT 636-804 RELOCATE WOMEN'S CLINIC AND SPECIALTY CLINICS TO BUILDING 50 FOR THE IOWA CITY VAHCS. ALL WORK ASSOCIATED WITH THE DESIGN PROJECT INCLUDING CONSTRUCTION PERIOD SERVICES.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2020-07-22+$1,377,269= $1,377,269
- Mod P000012021-04-14+$4,602= $1,381,871
- Mod P000022022-09-20+$112,450= $1,494,322
- Mod P000032025-04-21+$0= $1,494,322
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2020-07-22 | +$1,377,269 | $1,377,269 | AE DESIGN FOR PROJECT 636-804 RELOCATE WOMEN'S CLINIC AND SPECIALTY CLINICS TO BUILDING 50 FOR THE IOWA CITY V… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-04-14 | +$4,602 | $1,381,871 | AND ADD 24 CALENDAR DAYS TO DESIGN PERIOD TO INCORPORATE THE CHANGES REQUIRED TO ADD A WALL AND DOOR TO THE TH… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-09-20 | +$112,450 | $1,494,322 | MOD TO REDESIGN TO REDUCE OVERALL PROJECT COST UNDER $18MILLION. ADDS 49 ADDITIONAL DESIGN DAYS. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-04-21 | +$0 | $1,494,322 | ALL WORK ASSOCIATED WITH THE AE DESIGN PROJECT INCLUDING THE PREPARATION OF CONSTRUCTION DOCUMENTS AND SITE IN… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI L3GGA8TUFVL4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25526C0071 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $399,184 | FY2026 |
| 36C24526N0681 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · C222 · ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | $779,961 | FY2026 |
| 36C25026C0136 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $244,150 | FY2026 |
| 36C24526N0663 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $404,260 | FY2026 |
| 36C24526N0549 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $91,585 | FY2026 |
| 36C25526C0049 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $501,077 | FY2026 |
Other recipients under C1DA from NETWORK CONTRACT OFFICE 23 (36C263) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26326N0681 | HORIZON RDG JV, LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $1,382,857 | FY2026 |
| 36C26326N0679 | AE WORKS LTD | NETWORK CONTRACT OFFICE 23 (36C263) | $702,349 | FY2026 |
| 36C26326C0059 | ALESIA ARCHITECTURE PC | NETWORK CONTRACT OFFICE 23 (36C263) | $268,349 | FY2026 |
| 36C26326N0654 | NORTHEAST INFRASTRUCTURE LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $841,372 | FY2026 |
| 36C26326N0603 | HORIZON RDG JV, LLC | NETWORK CONTRACT OFFICE 23 (36C263) | $181,834 | FY2026 |