Award recordCONTRACT

NAMTEK CORP.

PIID 36C26218F7048· VHA· 262-NETWORK CONTRACT OFFICE 22 (36C262)· J040 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ROPE, CABLE, CHAIN, AND FITTINGS· FY2018· $44,358 net obligations· UEI TTVMGAH4M441· NH

Description

REMOVE, REPLACE AND INSTALL NETWORK CABLE WIRING FOR VA LONG BEACH HEALTHCARE SYSTEM.

First action · last action
2018-09-21 · 2019-10-22
Transactions
4
First transaction's obligation
$79,826
Base + all options value (sum of deltas)
$44,358
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
—
Offers received
1
SDVOSB flag on record
Yes (self-representation)
Parent IDV
GS35F0367V
NAICS
811212 · COMPUTER AND OFFICE MACHINE REPAIR AND MAINTENANCE

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$79,826$0Base award · 2018-09-21 · this action $79,826 · running total $79,826Modification P00001 · 2019-01-02 · this action $0 · running total $79,826Modification P00002 · 2019-04-16 · this action $0 · running total $79,826Modification P00003 · 2019-10-22 · this action -$35,469 · running total $44,358
  • Base2018-09-21+$79,826= $79,826
  • Mod P000012019-01-02+$0= $79,826
  • Mod P000022019-04-16+$0= $79,826
  • Mod P000032019-10-22-$35,469= $44,358
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2018-09-21+$79,826$79,826REMOVE, REPLACE AND INSTALL NETWORK CABLE WIRING FOR VA LONG BEACH HEALTHCARE SYSTEM.
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-02+$0$79,826REMOVE, REPLACE AND INSTALL NETWORK CABLE WIRING FOR VA LONG BEACH HEALTHCARE SYSTEM.
Mod P00002· EXERCISE AN OPTION2019-04-16+$0$79,826REMOVE, REPLACE AND INSTALL NETWORK CABLE WIRING FOR VA LONG BEACH HEALTHCARE SYSTEM.
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-10-22−$35,469$44,358REMOVE, REPLACE AND INSTALL NETWORK CABLE WIRING FOR VA LONG BEACH HEALTHCARE SYSTEM.

Related awards · 10

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI TTVMGAH4M441)

AwardOffice · PSC / listingNet obligationsFY
36C24921F0185249-NETWORK CONTRACT OFFICE 9 (36C249) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES$7,254FY2021
36C25221F0149252-NETWORK CONTRACT OFFICE 12 (36C252) · DE01 · IT AND TELECOM - END USER: HELP DESK; TIER 1-2, WORKSPACE, PRINT, OUTPUT, PRODUCTIVITY TOOLS (LABOR)$0FY2021
36C26221P0439262-NETWORK CONTRACT OFFICE 22 (36C262) · 3590 · MISCELLANEOUS SERVICE AND TRADE EQUIPMENT$50,142FY2021
36C25221F0105252-NETWORK CONTRACT OFFICE 12 (36C252) · DE01 · IT AND TELECOM - END USER: HELP DESK; TIER 1-2, WORKSPACE, PRINT, OUTPUT, PRODUCTIVITY TOOLS (LABOR)$52,647FY2021
36C25021F0227250-NETWORK CONTRACT OFFICE 10 (36C250) · 6640 · LABORATORY EQUIPMENT AND SUPPLIES$19,890FY2021
36C26021F0064260-NETWORK CONTRACT OFFICE 20 (36C260) · 7E20 · IT AND TELECOM - END USER: HELP DESK;TIER 1-2, WORKSPACE, PRINT, PRODUCTIVITY TOOL (HW/PERPETUAL SW)$17,735FY2021

Other recipients under J040 from 262-NETWORK CONTRACT OFFICE 22 (36C262) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C26225P0785GUY L WARDEN & SONS262-NETWORK CONTRACT OFFICE 22 (36C262)$31,080FY2025
36C26224P1003BSDS INC262-NETWORK CONTRACT OFFICE 22 (36C262)$31,443FY2024
36C26224P0197HINGEWERKS COMMERCIAL DOORS INC262-NETWORK CONTRACT OFFICE 22 (36C262)$49,750FY2024
36C26222P0193JOSEPH JOHN GIALANELLA262-NETWORK CONTRACT OFFICE 22 (36C262)$95,854FY2022

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26218F7048_3600_GS35F0367V_4730 · retrieved 2026-09-26.