Description
MODIFICATION FOR A NO-COST TIME EXTENSION TO EXTEND THE PERIOD OF PERFORMANCE 62 DAYS.
Base award description: RENOVATE NUTRITION AND FOOD SERVICE KITCHEN
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2023-12-12+$4,494,925= $4,494,925
- Mod P000012024-10-22+$0= $4,494,925
- Mod P000022025-04-14+$98,540= $4,593,465
- Mod P000032025-06-20+$1,137,621= $5,731,086
- Mod P000042026-02-12+$8,466= $5,739,552
- Mod P000052026-06-29+$0= $5,739,552
- Mod P000062026-09-02+$0= $5,739,552
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2023-12-12 | +$4,494,925 | $4,494,925 | RENOVATE NUTRITION AND FOOD SERVICE KITCHEN |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-10-22 | +$0 | $4,494,925 | MODIFICATION 1 EXTENDS POP TO MAY 15, 2025. |
| Mod P00002· CHANGE ORDER | 2025-04-14 | +$98,540 | $4,593,465 | MODIFICATION TO ADD ELEVATOR/CART LIFT, TEMPORARY ASPHALT PATHWAY, AND CONCRETE PAD FOR LIFT TO ASSIST WITH TH… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-06-20 | +$1,137,621 | $5,731,086 | MODIFICATION TO ADD MOLD REMEDIATION, DEMOLITION, FRAMING AND DRYWALL, MEP REWORK, FINISH REPAIRS, AND SUBFLOO… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-02-12 | +$8,466 | $5,739,552 | MODIFICATION TO REPAIR TEMPORARY TRAILER DISHWASHER, TO APPLY FIREPROOFING, RELOCATE ELECTRICAL BOXES, AND SPR… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-06-29 | +$0 | $5,739,552 | MODIFICATION FOR A NO-COST TIME EXTENSION TO EXTEND THE PERIOD OF PERFORMANCE 70 DAYS. |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-09-02 | +$0 | $5,739,552 | MODIFICATION FOR A NO-COST TIME EXTENSION TO EXTEND THE PERIOD OF PERFORMANCE 62 DAYS. |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI N6F2MJSH4WM8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26126P0983 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1JZ · CONSTRUCTION OF MISCELLANEOUS BUILDINGS | $53,831 | FY2026 |
| 36C26126C0012 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $752,500 | FY2026 |
| 36C26125N0690 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $296,121 | FY2025 |
| 36C26125N0726 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $118,031 | FY2025 |
| 36C26125N0707 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $345,000 | FY2025 |
| 36C26125N0684 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $39,600 | FY2025 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26124N0290_3600_36C26120D0087_3600 · retrieved 2026-09-26.