Description
MODIFICATION P00006 - ALTERNATIVE SPS MOBILE TRAILER
Base award description: RENOVATE STERILE PROCESSING & SUPPLY (SPS)
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2023-08-08+$16,570,016= $16,570,016
- Mod P000012025-03-20+$111,058= $16,681,074
- Mod P000022025-06-26+$78,108= $16,759,182
- Mod P000032025-08-19+$131,052= $16,890,234
- Mod P000042025-10-10+$0= $16,890,234
- Mod P000052026-03-11+$671,129= $17,561,363
- Mod P000062026-07-16+$1,317,300= $18,878,663
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2023-08-08 | +$16,570,016 | $16,570,016 | RENOVATE STERILE PROCESSING & SUPPLY (SPS) |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-03-20 | +$111,058 | $16,681,074 | MODIFICATION P00001 - REROUTING OF FIRE SPRINKLER AND INSTALLATION OF STEEL STRUCTURE DURING OFF-HOURS |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-06-26 | +$78,108 | $16,759,182 | MODIFICATION P00002 - ELECTRICAL EQUIPMENT LAYOUT |
| Mod P00003· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2025-08-19 | +$131,052 | $16,890,234 | MODIFICATION P00003 - INCORPORATES DESIGN SERVICE TO CONSTRUCT THE NEW CORRIDOR, CONNECTING TO MOBILE SPS TRAI… |
| Mod P00004· CHANGE ORDER | 2025-10-10 | +$0 | $16,890,234 | MODIFICATION P00004 - TIME EXTENSION |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-03-11 | +$671,129 | $17,561,363 | MODIFICATION P00005 - REA FOR DELAYS, PHYSICAL SECURITY, PHARMACY CACHE, EXPOSED LIGHTING, AND HEAT EXCHANGER… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-07-16 | +$1,317,300 | $18,878,663 | MODIFICATION P00006 - ALTERNATIVE SPS MOBILE TRAILER |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI QQK5GYAYT6M3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26126C0071 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DB · REPAIR OR ALTERATION OF LABORATORIES AND CLINICS | $10,612,677 | FY2026 |
| 36C26126C0062 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $224,501 | FY2026 |
| 36C78626N0328 | NATIONAL CEMETERY ADMIN (36C786) · Z1AZ · MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $92,968 | FY2026 |
| 36C78626N0299 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $49,731 | FY2026 |
| 36C78626N0288 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $29,590 | FY2026 |
| 36C78626N0138 | NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $500 | FY2026 |
Other recipients under Z2DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126P1028 | PURE ENVIRO-MANAGEMENT, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $11,831 | FY2026 |
| 36C26126C0058 | STRATEGIC INDUSTRY INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $7,984,201 | FY2026 |
| 36C26126C0056 | MISSION BUILDERS | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $679,322 | FY2026 |
| 36C26126P0737 | DIABLO BOILER & STEAM INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $20,622 | FY2026 |
| 36C26126C0054 | WATER BROOKS LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $39,816 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26123C0053_3600_-NONE-_-NONE- · retrieved 2026-09-25.