Description
STERILE STORAGE ROOMS AIR PRESSURE WORK ROOM G3634 TEST.
Base award description: REPLACE SPS HVAC AND FLOORING
Modification chain · 9 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2022-10-19+$4,004,287= $4,004,287
- Mod P000012023-05-23+$6,405= $4,010,692
- Mod P000022023-09-07+$45,402= $4,056,095
- Mod P000032024-02-12+$101,092= $4,157,186
- Mod P000042024-05-16+$1,221,876= $5,379,062
- Mod P000052024-12-13+$0= $5,379,062
- Mod P000062025-01-17+$55,623= $5,434,685
- Mod P000072025-02-18+$11,385= $5,446,070
- Mod P000082026-02-05+$8,883= $5,454,954
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2022-10-19 | +$4,004,287 | $4,004,287 | REPLACE SPS HVAC AND FLOORING |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-05-23 | +$6,405 | $4,010,692 | ASBESTOS ABATEMENT IN ROOMS G3634 AND G3636 |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-09-07 | +$45,402 | $4,056,095 | ADD ELECTRIC PANEL AND CIRCUITRY TO ACCOMODATE REPLACEMENT HOTWATER HEATER, RE-ROUTE DUCT BANK, AND REROUTE DO… |
| Mod P00003· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2024-02-12 | +$101,092 | $4,157,186 | CORRECT AIR FLOW IN THE CARDIAC CATH LAB |
| Mod P00004· CHANGE ORDER | 2024-05-16 | +$1,221,876 | $5,379,062 | ADD SECOND SPS TRAILER FOR SCOPE PROCESSING |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-12-13 | +$0 | $5,379,062 | PERIOD OF PERFORMANCE TIME EXTENSION |
| Mod P00006· CHANGE ORDER | 2025-01-17 | +$55,623 | $5,434,685 | ADD FLOORING WORK IN ROOMS G1546 - 525 SQUARE FEET AND ROOM G1557 - 127 SQUARE FEET. |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-02-18 | +$11,385 | $5,446,070 | SHIFT DEMOLITION TO OFF HOURS WORK AND MOLD ABATEMENT |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-02-05 | +$8,883 | $5,454,954 | STERILE STORAGE ROOMS AIR PRESSURE WORK ROOM G3634 TEST. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CJNYTL3J38Q5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26126C0057 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DB · MAINTENANCE OF LABORATORIES AND CLINICS | $103,652 | FY2026 |
| 36C26126P0632 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $114,503 | FY2026 |
| 36C26126C0016 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · N039 · INSTALLATION OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT | $85,176 | FY2026 |
| 36C26125C0066 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $6,970,122 | FY2025 |
| 36C26124N0890 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $150,000 | FY2024 |
| 36C26124N0891 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J049 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | $14,025 | FY2024 |
Other recipients under Z1DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126C0064 | AMOROSO OVERWATCH LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $8,897,000 | FY2026 |
| 36C26126P1121 | SACRAMENTO COMPUTER POWER, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $217,673 | FY2026 |
| 36C26126C0067 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $2,404,795 | FY2026 |
| 36C26126C0066 | BEXAR-ADVANCED SOLUTIONS GROUP, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $3,214,131 | FY2026 |
| 36C26126C0063 | MOONLITE CONSTRUCTION | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $113,041 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26123C0007_3600_-NONE-_-NONE- · retrieved 2026-09-26.