Description
TEMPORARY WALKWAY CANOPY EXTEND POP AND INCORPORATE MOVING OF POST, CHANGE TO METAL CONDUIT DUE TO GROUND DEPTH, AND MANUAL LABOR TO CHIP FOOTINGS.
Base award description: TEMPORARY WALKWAY CANOPY
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2022-09-07+$946,735= $946,735
- Mod P000012023-06-08+$27,652= $974,387
- Mod P000022023-11-08+$0= $974,387
- Mod P000032024-01-11+$25,010= $999,397
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2022-09-07 | +$946,735 | $946,735 | TEMPORARY WALKWAY CANOPY |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-06-08 | +$27,652 | $974,387 | TEMPORARY WALKWAY CANOPY |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-11-08 | +$0 | $974,387 | TEMPORARY WALKWAY CANOPY |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-01-11 | +$25,010 | $999,397 | TEMPORARY WALKWAY CANOPY EXTEND POP AND INCORPORATE MOVING OF POST, CHANGE TO METAL CONDUIT DUE TO GROUND DEPT… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI TRKLML6DKAH8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26126C0047 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS | $5,082,745 | FY2026 |
| 36C26126P0325 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $19,890 | FY2026 |
| 36C26126C0025 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J056 · MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS | $451,000 | FY2026 |
| 36C26126P0435 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $40,483 | FY2026 |
| 36C77626C0013 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $15,989,000 | FY2026 |
| 36C26126N0242 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $1,358,400 | FY2026 |
Other recipients under Z1DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126C0064 | AMOROSO OVERWATCH LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $8,897,000 | FY2026 |
| 36C26126P1121 | SACRAMENTO COMPUTER POWER, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $217,673 | FY2026 |
| 36C26126C0067 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $2,404,795 | FY2026 |
| 36C26126C0066 | BEXAR-ADVANCED SOLUTIONS GROUP, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $3,214,131 | FY2026 |
| 36C26126C0063 | MOONLITE CONSTRUCTION | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $113,041 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26122N0701_3600_36C26120D0086_3600 · retrieved 2026-09-26.