Description
EXECUTE CONSTRUCTION PERIOD SERVICES
Base award description: EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCTURE AT THE FRESNO, CA VAMC.
Modification chain · 8 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2022-06-21+$1,260,677= $1,260,677
- Mod P000012022-08-04+$0= $1,260,677
- Mod P000022023-06-13+$0= $1,260,677
- Mod P000032024-05-10+$0= $1,260,677
- Mod P000042025-01-06+$261,340= $1,522,017
- Mod P000052025-06-04+$0= $1,522,017
- Mod P000062025-12-31+$327,287= $1,849,304
- Mod P000072026-08-31+$549,027= $2,398,331
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2022-06-21 | +$1,260,677 | $1,260,677 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2022-08-04 | +$0 | $1,260,677 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-06-13 | +$0 | $1,260,677 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-05-10 | +$0 | $1,260,677 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-01-06 | +$261,340 | $1,522,017 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-06-04 | +$0 | $1,522,017 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-12-31 | +$327,287 | $1,849,304 | EO14042 - VISN 21 WIDE DESIGN IDIQ - TASK ORDER FOR DESIGN TO REPLACE AND EXTEND THE CHILLED WATER INFRASTRUCT… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-08-31 | +$549,027 | $2,398,331 | EXECUTE CONSTRUCTION PERIOD SERVICES |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI TQ5MWGSBSF75)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C77626N0800 | PCAC (36C776) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $3,409,209 | FY2026 |
| 36C77626N0780 | PCAC (36C776) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $120,840 | FY2026 |
| 36C77626N0793 | PCAC (36C776) · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $474,259 | FY2026 |
| 36C77626A0016 | PCAC (36C776) · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $0 | FY2026 |
| 36C77626F0038 | PCAC (36C776) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $22,000 | FY2026 |
| 36C77626N0794 | PCAC (36C776) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $132,335 | FY2026 |
Other recipients under C1DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126N0649 | GDM-AE, INC. | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $4,451,252 | FY2026 |
| 36C26126N0595 | GDM-AE, INC. | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $198,807 | FY2026 |
| 36C26126N0575 | TRIPLE C-THE A & E GROUP LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $394,340 | FY2026 |
| 36C26126N0603 | AWEN SOLUTIONS GROUP, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $630,025 | FY2026 |
| 36C26126N0551 | APOGEE CONSULTING GROUP, P.A. | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $209,175 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26122N0568_3600_VA26117D0103_3600 · retrieved 2026-09-26.