Description
PROJECT 687-24-110, MODIFICATION TO ADD 30 DAYS TO PERIOD OF PERFORMANCE, JONATHAN M. WAINWRIGHT MEMORIAL VA MEDICAL CENTER, WALLA WALLA, WA
Base award description: PROJECT 687-24-110, BOILER AND TWO WATER HEATERS INSTALL, WALLA WALLA VA MEDICAL CENTER, WALLA WALLA, WA
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2024-09-29+$260,260= $260,260
- Mod P000012025-01-22+$140,000= $400,260
- Mod P000032025-02-19+$0= $400,260
- Mod P000022025-03-03+$25,300= $425,560
- Mod P000042025-05-12+$0= $425,560
- Mod P000062025-12-01+$0= $425,560
- Mod P000052026-03-06+$0= $425,560
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2024-09-29 | +$260,260 | $260,260 | PROJECT 687-24-110, BOILER AND TWO WATER HEATERS INSTALL, WALLA WALLA VA MEDICAL CENTER, WALLA WALLA, WA |
| Mod P00001· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2025-01-22 | +$140,000 | $400,260 | PROJECT 687-24-110 MODIFICATION TO ADD ADDITIONAL BOILER, JONATHAN M. WAINWRIGHT MEMORIAL VAMC, WALLA WALLA, W… |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2025-02-19 | +$0 | $400,260 | PROJECT 687-24-110, REPLACE B143 BOILER AND WATER HEATERS, JONATHAN M. WAINWRIGHT MEMORIAL VAMC, WALLA WALLA,… |
| Mod P00002· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2025-03-03 | +$25,300 | $425,560 | PROJECT 687-24-110, MODIFICATION TO ADDRESS START UP ISSUES, JONATHAN M. WAINWRIGHT MEMORIAL VA MEDICAL CENTER… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-05-12 | +$0 | $425,560 | PROJECT 687-24-110, MODIFICATION TO ADD 30 DAYS TO PERIOD OF PERFORMANCE, JONATHAN M. WAINWRIGHT MEMORIAL VA M… |
| Mod P00006· OTHER ADMINISTRATIVE ACTION | 2025-12-01 | +$0 | $425,560 | PROJECT 687-24-110, MODIFICATION TO ADD 200 DAYS TO PERIOD OF PERFORMANCE, JONATHAN M. WAINWRIGHT MEMORIAL VA… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-03-06 | +$0 | $425,560 | PROJECT 687-24-110, MODIFICATION TO ADD 30 DAYS TO PERIOD OF PERFORMANCE, JONATHAN M. WAINWRIGHT MEMORIAL VA M… |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI ZF5JYH4D3XM6)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26024C0069 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,751,329 | FY2024 |
| 36C26023P0749 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Q301 · REFERENCE LABORATORY TESTING | $79,754 | FY2023 |
| 36C26023P0216 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $41,415 | FY2023 |
Other recipients under Y1DA from 260-NETWORK CONTRACT OFFICE 20 (36C260) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26026C0046 | RED POINT CONSTRUCTION, LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $3,730,000 | FY2026 |
| 36C26026C0029 | ATC-ATHERTON JV1 LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $9,364,318 | FY2026 |
| 36C26026N0370 | PVH CONSTRUCTION LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $33,948 | FY2026 |
| 36C26026P0528 | GLOBAL ENGINEERING SERVICES INC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $153,567 | FY2026 |
| 36C26026C0019 | PEAK PERFORMANCE JV 1, LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $7,494,284 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C26024C0052_3600_-NONE-_-NONE- · retrieved 2026-09-26.