Description
THE TIME EXTENSION OF 61 CALENDAR DAYS IS TENTATIVELY SUFFICIENT, CONSIDERING HOW THINGS ARE CURRENTLY RUNNING WITH COVID-19.
Base award description: IGF::OT::IGF ARCHITECTURE AND ENGINEERING SERVICES - DESIGN THE UPGRADE OF PARKING LOT LIGHTING AT VA LOMA LINDA.
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2019-04-24+$222,325= $222,325
- Mod P000012019-09-11+$0= $222,325
- Mod P000022019-10-04-$20,461= $201,864
- Mod P000032020-06-03+$0= $201,864
- Mod P000042022-12-14+$0= $201,864
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2019-04-24 | +$222,325 | $222,325 | IGF::OT::IGF ARCHITECTURE AND ENGINEERING SERVICES - DESIGN THE UPGRADE OF PARKING LOT LIGHTING AT VA LOMA LI… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-11 | +$0 | $222,325 | ARCHITECTURE AND ENGINEERING SERVICES - DESIGN THE UPGRADE OF PARKING LOT LIGHTING AT VA LOMA LINDA. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-04 | −$20,461 | $201,864 | ARCHITECTURE AND ENGINEERING SERVICES - DESIGN THE UPGRADE OF PARKING LOT LIGHTING AT VA LOMA LINDA. |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2020-06-03 | +$0 | $201,864 | THE TIME EXTENSION OF 61 CALENDAR DAYS IS TENTATIVELY SUFFICIENT, CONSIDERING HOW THINGS ARE CURRENTLY RUNNING… |
| Mod P00004· OTHER ADMINISTRATIVE ACTION | 2022-12-14 | +$0 | $201,864 | THE TIME EXTENSION OF 61 CALENDAR DAYS IS TENTATIVELY SUFFICIENT, CONSIDERING HOW THINGS ARE CURRENTLY RUNNING… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI G7MEY5YBMBE5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26225C0178 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $59,152 | FY2025 |
| 36C26224C0242 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C222 · ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | $37,866 | FY2024 |
| 36C25819N0352 | 258-NETWORK CNTRCT OFF 22G (36C258) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $343,000 | FY2019 |
| 36C25818N0597 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $414,603 | FY2018 |
| 36C25818N0517 | 258-NETWORK CNTRCT OFF 22G (36C258) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $169,140 | FY2018 |
| 36C25818N0501 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $174,863 | FY2018 |
Other recipients under C1DA from 258-NETWORK CNTRCT OFF 22G (36C258) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C77621C0090 | APOGEE CONSULTING GROUP, P.A. | 258-NETWORK CNTRCT OFF 22G (36C258) | $2,433,083 | FY2021 |
| 36C25821N0338 | SPUR SBBL COLLABORATIVE JV, INC. | 258-NETWORK CNTRCT OFF 22G (36C258) | $693,496 | FY2021 |
| 36C25821N0322 | K.F. DAVIS ENGINEERING, INC | 258-NETWORK CNTRCT OFF 22G (36C258) | $361,673 | FY2021 |
| 36C25821N0231 | AESUS DESIGN GROUP LLC | 258-NETWORK CNTRCT OFF 22G (36C258) | $63,515 | FY2021 |
| 36C25821N0185 | AESUS DESIGN GROUP LLC | 258-NETWORK CNTRCT OFF 22G (36C258) | $200,583 | FY2021 |