Description
MODIFICATION A/E REPLACE BOILERS - INCREASE IN CONSTRUCTION COST LIMIT AT THE KERRVILLE VAMC, KERRVILLE, TX
Base award description: AE MULTIPLE AWARD IDIQ FOR ARCHITECT AND ENGINEERING SERVICES VISN 17 A/E REPLACE BOILERS AT THE KERRVILLE VAMC, KERRVILLE, TX
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2021-07-23+$219,413= $219,413
- Mod P000012021-11-03+$0= $219,413
- Mod P000022022-05-31+$131,601= $351,014
- Mod P000032026-08-27-$51,333= $299,680
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2021-07-23 | +$219,413 | $219,413 | AE MULTIPLE AWARD IDIQ FOR ARCHITECT AND ENGINEERING SERVICES VISN 17 A/E REPLACE BOILERS AT THE KERRVILLE VAM… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-03 | +$0 | $219,413 | EO14042 - A/E REPLACE BOILERS AT THE KERRVILLE VAMC, KERRVILLE, TX |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-31 | +$131,601 | $351,014 | MODIFICATION A/E REPLACE BOILERS - INCREASE IN CONSTRUCTION COST LIMIT AT THE KERRVILLE VAMC, KERRVILLE, TX |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-08-27 | −$51,333 | $299,680 | MODIFICATION A/E REPLACE BOILERS - INCREASE IN CONSTRUCTION COST LIMIT AT THE KERRVILLE VAMC, KERRVILLE, TX |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI S8JJBQNY4FN1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25725N0480 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $418,422 | FY2025 |
| 36C25724N0061 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $824,283 | FY2024 |
| 36C25723N0479 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $202,848 | FY2023 |
| 36C25723N0080 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $966,744 | FY2023 |
| 36C25722N0454 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $312,834 | FY2022 |
| 36C25722N0409 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C221 · ARCHITECT AND ENGINEERING- GENERAL: PLUMBING SYSTEMS | $692,387 | FY2022 |
Other recipients under C1NB from 257-NETWORK CONTRACT OFFICE 17 (36C257) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25725N0506 | VALHALLA ENGINEERING GROUP, LLC | 257-NETWORK CONTRACT OFFICE 17 (36C257) | $1,071,907 | FY2025 |
| 36C25725C0070 | L2EOCULUS JV LLC | 257-NETWORK CONTRACT OFFICE 17 (36C257) | $6,945,700 | FY2025 |
| 36C25725N0230 | OBRIEN ENGINEERING INC | 257-NETWORK CONTRACT OFFICE 17 (36C257) | $6,011,578 | FY2025 |
| 36C25725N0369 | SPUR DESIGN, LLC | 257-NETWORK CONTRACT OFFICE 17 (36C257) | $599,774 | FY2025 |
| 36C25725N0321 | VALHALLA ENGINEERING GROUP, LLC | 257-NETWORK CONTRACT OFFICE 17 (36C257) | $871,848 | FY2025 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C25721N0517_3600_36C25720D0062_3600 · retrieved 2026-09-26.