P00003 NO COST TIME EXTENSION 550-22-105 REPLACE B104 GENERATOR AE CPS
Base award description: 550-22-105 REPLACE B104 GENERATOR AE CPS
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2024-11-19+$64,448= $64,448
- Mod P000012025-09-02+$0= $64,448
- Mod P000022026-04-27+$0= $64,448
- Mod P000032026-09-01+$0= $64,448
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2024-11-19 | +$64,448 | $64,448 | 550-22-105 REPLACE B104 GENERATOR AE CPS |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2025-09-02 | +$0 | $64,448 | P00001 NO COST TIME EXTENSION 550-22-105 REPLACE B104 GENERATOR AE CPS |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-04-27 | +$0 | $64,448 | P00002 NO COST TIME EXTENSION 550-22-105 REPLACE B104 GENERATOR AE CPS |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2026-09-01 | +$0 | $64,448 | P00003 NO COST TIME EXTENSION 550-22-105 REPLACE B104 GENERATOR AE CPS |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI DFS9NKSDUUY5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24626C0054 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · C1NZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER UTILITIES | $760,272 | FY2026 |
| 36C25222N0423 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $7,864 | FY2022 |
| 36C25222N0373 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $16,250 | FY2022 |
| 36C25222N0196 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $79,615 | FY2022 |
| 36C25221N0630 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $28,753 | FY2021 |
| 36C25221N0605 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $236,642 | FY2021 |
Other recipients under C1DA from 252-NETWORK CONTRACT OFFICE 12 (36C252) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25226N0560 | PENN CONSTRUCTION GROUP, INCORPORATED | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $158,057 | FY2026 |
| 36C25226N0477 | ALLIANCE CONSULTING GROUP SEVEN GENERATIONS AE JV LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $525,499 | FY2026 |
| 36C25226C0037 | DAV ENERGY SOLUTIONS, INC. | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $61,770 | FY2026 |
| 36C25226C0038 | DAV ENERGY SOLUTIONS, INC. | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $53,430 | FY2026 |
| 36C25226N0430 | FP&C CONSULTANTS KC LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $35,019 | FY2026 |